What are the provisions on the qualification level and business scope of the construction unit of th

Updated on society 2024-03-20
4 answers
  1. Anonymous users2024-02-07

    Geological hazard qualification standards.

    First: What are the types of geological hazard qualifications?

    There are a total of 5 categories: geological disaster control engineering exploration unit, geological disaster absorption and treatment construction unit, geological disaster treatment design unit, geological disaster treatment engineering supervision unit, and geological disaster risk assessment unit.

    Second: How to divide the level of each item of geological hazard qualification?

    All geological disasters are divided into only 3 levels, namely Class A, Class C, and Class B.

    Third: Do I need to provide performance for geological hazard qualification?

    Not required for new applications, but if it is an upgrade, it is required to provide performance.

  2. Anonymous users2024-02-06

    Summary. Hello, according to your question I have found the answer, the geological disaster control engineering exploration, design and construction unit qualifications, are divided into three levels: A, B and C. The Ministry of Land and Resources is responsible for the examination and approval and management of the qualifications of the survey, design and construction units of Class A geological disaster control projects.

    The land and resources management departments of provinces, autonomous regions and municipalities directly under the Central Government shall be responsible for the examination and approval and management of the qualifications of the exploration, design and construction units of Class B and Class C geological disaster control projects. Since November 17, 2009, the Provincial Department of Natural Resources (formerly the Provincial Department of Land and Resources) will be geological disaster control engineering exploration, design, construction, supervision unit C qualification approval matters below the prefecture level listed land and resources administrative departments. At present, the approval and management of the qualifications of the survey, design and construction units of the city's Class C geological disaster control project are implemented by the Municipal Planning and Natural Resources Bureau.

    Hello, according to your question I have found the answer, the geological disaster control engineering exploration, design and construction unit qualifications, are divided into three levels: A, B and C. The Ministry of Land and Resources is responsible for the examination and approval and management of the qualifications of the survey, design and construction units of Class A geological disaster control projects. The land and resources management departments of provinces, autonomous regions and municipalities directly under the Central Government are responsible for the examination and approval and management of the qualifications of the exploration, design and construction units of Class B and Class C geological disaster control projects.

    Since November 17, 2009, the Provincial Department of Natural Resources (formerly the Provincial Department of Land and Resources) will be geological disaster control engineering exploration, design, construction, supervision unit C qualification examination and approval matters below the prefecture level above the Danmotan City land and resources administrative departments. At present, the approval and management of the qualification of the survey, design and construction unit of the city's Class C geological disaster control project are implemented by the Municipal Planning and Natural Resources Bureau.

    Regarding the geological disaster declaration information, if the application conditions are not under the geotechnical engineering, engineering geology, engineering surveying, engineering budget, the total number of professional and technical personnel is not less than 20. 2. It has the construction machinery, measurement, testing and quality testing equipment suitable for the construction of small-scale geological disaster prevention and control projects, and has an independent legal personality, among which the losing unit applying for construction qualification must have the corporate legal personality. There is a sound safety and quality management supervision and branch control system.

    No more than 10 percent of the technical staff are recruited from outside.

    The information required is as follows: Qualification application form, new sales of forest set statistical table of incumbents in the current year, list of engineering and technical personnel and economic management personnel with intermediate titles or above, identity certificates, and professional title certificates. Relevant information of the main geological disaster control projects undertaken, including task book, power of attorney or contract, and acceptance opinions of the project management department. The unit mainly includes a list of mechanical equipment such as drilling, geophysical prospecting, surveying, testing, and computers.

    Quality management system, safety management system, relevant information, legal representative, signature, letter stamped with official seal of the application materials, and with a letter of commitment to authenticity, the above paper materials should be tried one by one, and provide an electronic document in accordance with the prescribed format, complete the application materials, can be applied to the prefecture level where the company is registered. Hope it helps.

  3. Anonymous users2024-02-05

    Summary. Dear, good afternoon, I am happy to answer for you, the construction qualification of geological disaster control project is that the construction qualification of geological disaster control project refers to the qualifications, technical force, technical level, level of technical equipment and management level that the unit engaged in the construction of geological disaster prevention and control engineering must have. The qualification of the construction unit of the geological disaster prevention and control project is divided into two levels: A and B.

    Class A construction units can undertake the construction of various levels of geological disaster prevention and control projects. Class B construction units can undertake the construction of small and medium-sized geological disaster prevention and control projects.

    Geological hazards. Geological hazard qualification is currently a popular qualification. When you are planning to contract a project, but the construction site has the risk of natural disasters such as collapse, landslide, ground subsidence, land subsidence, etc., the geological hazard qualification is particularly important.

    The state and the construction unit still have a great demand for this piece, such as slope care, slope remediation, slope repair and maintenance of the riverbed, river remediation, only the foundation engineering professional contracting qualification is far from enough. <>

    What is the construction qualification of geological disaster control project?

    Hello, I am a cooperative emotional lobster social livelihood mentor, I have provided services to 400 people, and the cumulative service time is more than 300 hours! I have received your question, it will take some time to answer it, please wait a while, please do not end the consultation, you can also provide more effective information, so that I can better answer for you <>

    Dear, good afternoon, I am very happy to answer Qingxun for you, the construction qualification of geological disaster control project is that the construction qualification of geological disaster control project refers to the qualifications, technical force, technical level, level technical equipment and management level that the unit engaged in the construction of geological disaster prevention and control engineering must have. The qualification of the construction unit of the geological disaster prevention and control project is divided into two levels: A and B. Class A construction units can undertake the construction of various levels of geological disaster prevention and control projects.

    Class B construction units can undertake the construction of small and medium-sized geological disaster prevention and control projects. Geological hazard geological hazard qualification is a relatively popular qualification at present. Geological hazard qualifications are particularly important when you are planning to contract a project, but there is a risk of natural disasters such as collapse, landslide, ground subsidence, and land subsidence at the construction site.

    The state and the construction unit still have a great demand for this piece, such as slope care, slope remediation, slope repair and maintenance of the riverbed, river remediation, only the foundation engineering professional contracting qualification is far from enough. <>

    Dear, I hope the above can help you, if you do not do the right place, you can continue to consult, I really hope to help you! It's my pleasure to answer your questions! I wish you all the best in everything and a great career! <>

  4. Anonymous users2024-02-04

    Legal analysis: The mine source difference geological environmental protection and restoration management plan requires geological environment risk assessment, geological disaster management design and engineering construction qualifications, and the mine geological environmental protection and restoration management defense plan is the design qualification, and the general provincial, municipal, and autonomous region land and resources departments are qualified for grade B and C, and the Ministry of land and resources issued a class A qualification.

    Legal basis

    Provisions on the Protection of the Geological Environment of Mines

    Article 13 The preparation unit of the mine geological environmental protection and restoration plan shall meet the following conditions:

    A) have geological disaster risk assessment qualifications or geological disaster control engineering survey, design qualifications and related work performance;

    2) Have professional and technical personnel who have been trained and qualified by the Ministry of Land and Resources for the preparation of mine geological environmental protection and governance and restoration programs.

    14th mining rights applicant has not prepared a mine geological environmental protection and governance and restoration program, or the preparation of the mine geological environmental protection and governance and restoration program does not meet the requirements, the competent administrative department of land and resources with the right to approve shall inform the applicant to supplement; If it is not supplemented and corrected within the time limit, its application for mining rights shall not be accepted.

Related questions
6 answers2024-03-20

Your question is too much of a space! Speechless.

9 answers2024-03-20

The main terms of the construction contract, also known as the construction and installation contract, are: (1) the name and location of the construction project; (2) the scope and content of the construction project; (3) The date of commencement and completion of the construction of the construction project and the date of commencement and completion of the intermediate delivery project; (4) The quality warranty period and warranty conditions of the construction project of the construction project; (5) the cost of the construction project; (6) Methods for payment, settlement and acceptance of the construction price of construction projects; (7) The date on which the construction design documents and estimates, budgets and technical data of the construction projects are provided; (8) Construction materials and equipment for construction projects and the deadline for entering the site; (9) Matters of mutual cooperation between the two parties; (10) Liability for breach of contract in the construction of construction projects.

7 answers2024-03-20

In the case of a part-time construction site, it is generally charged according to the completed area, and the specific amount of money per square depends on the area.

6 answers2024-03-20

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

6 answers2024-03-20

Approval by the construction department and the communications management department.