Which unit does the communication engineering construction qualification need to be approved?

Updated on society 2024-03-08
6 answers
  1. Anonymous users2024-02-06

    Approval by the construction department and the communications management department.

  2. Anonymous users2024-02-05

    The construction department and the communication management department approve (specifically find Guangdong Zhuoxi to handle).

  3. Anonymous users2024-02-04

    It is not very clear that the competent authority is the local Communications Administration for short, and you can go there and ask.

  4. Anonymous users2024-02-03

    Level 1 qualification standards.

    Enterprise assets: net assets of more than 80 million yuan.

    Key personnel of the enterprise.

    1) There shall be no less than 15 first-class registered constructors majoring in communication and radio and television engineering.

    2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has a senior professional title in communication engineering; There are no less than 60 personnel with intermediate or above professional titles in communication engineering related majors.

    3) There are no less than 50 construction site management personnel with post certificates, and the construction personnel, quality personnel, safety officers and other personnel are complete.

    4) There are no less than 120 skilled workers above the intermediate level who have passed the assessment or training.

    Enterprise engineering performance.

    In the past 5 years, he has undertaken the construction of 5 of the following 7 types of projects, and the quality of the projects is qualified.

    1) Complete more than 800 kilometers of long-distance optical cable lines or more than 2,000 kilometers of local network optical cable lines or more than 1,000 kilometers of communication pipeline projects or complete more than 300 kilometers of long-distance optical cable line projects for a single project;

    2) Complete more than 30 network elements in the business layer and control layer such as network management, clock, soft switch, and official billing;

    3) Complete more than 1,000 base station mobile communication projects per year;

    4) Complete the mobile communication network optimization project of 1000 base stations or more than 5000 carrier frequencies in the year;

    5) Complete the installation and commissioning of transmission equipment with 500 terminals of 155MB s or more than 50 terminals or 20 terminals of 10GB S or more;

    6) Complete more than 1 inter-provincial data communication or business and support system, or more than 10 metro data communication or business and support system projects;

    7) Complete more than 5 power supply projects in computer rooms above the prefecture and municipal level (including central computer rooms, hub buildings, core computer rooms, and IDC computer rooms) or more than 800 base stations, transmission and other supporting power supply projects.

  5. Anonymous users2024-02-02

    Mixed materials.

    Business license of enterprise legal person;

    Articles of Association (Articles of Association filed with the local administrative department for industry and commerce);

    The original and copy of the original qualification certificate of the enterprise;

    Original and copy of safety production license;

    Appointment documents and ID cards of the legal representative of the enterprise;

    The employment documents, title certificates, ID cards and relevant qualification standards of the technical managers and technical and financial persons in charge of the enterprise and the technical and financial persons in charge of the enterprise represent the project performance certification materials;

    Relevant certificates of enterprise equipment, plants, etc. required by enterprise qualification standards.

    Volume 2 Personnel Materials.

    Registered Constructor Registration Certificate, ID Card;

    Enterprise engineering and technical personnel and economic management personnel title certificates, ID cards, pension insurance certificates (provide the payment voucher of nearly one month before the declaration and the list of insured personnel consistent with the name of the reporting unit and stamped with the official seal of the social security department);

    If there are special requirements for professionals and skilled workers in the standard, they should provide professional title certificates or post certificates, ID cards, labor contracts and pension insurance certificates (provide payment vouchers for nearly one month before the declaration and a roster of insured personnel consistent with the name of the reporting unit and stamped with the official seal of the social security department).

  6. Anonymous users2024-02-01

    1. Qualification of general contractor of communication engineering construction: it can undertake the construction of various communication information network projects.

    2. Qualification of telecommunications engineering professional contracting enterprise: first-class enterprise: can undertake all kinds of communication engineering construction.

    3. Qualification of professional contracting enterprise of steel structure engineering: it can undertake the production and installation of various steel structure projects (including grid and light steel structure engineering).

    Legal basis: Civil Code

    Fourth, the celebration of one hundred and seventy-one articles.

    When a party concludes a contract, it may take the form of an offer, an acceptance or other means. Article 469:The parties may conclude a contract in written, oral or other forms. The written form is a form in which the contents of the contract, letter, telegram, telex, fax, etc. can be tangibly expressed.

    Data messages that can be tangibly expressed in the form of electric splitting grip data exchange, e-mail, etc., and that can be retrieved at any time shall be regarded as written form.

Related questions
6 answers2024-03-08

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

4 answers2024-03-08

First of all, you must ensure your own business level, like the construction industry pays more attention to practical experience, some masters have worked for a lifetime, especially carpenters are more stubborn, you must improve your ability, so that others can convince you that you can manage your people more conveniently, secondly, use different methods for different people, and quietly listen to what others say when they encounter problems that they don't understand, (learn more by themselves) don't talk nonsense for the sake of face, so you will be laughed at by others. I haven't been doing it for long, and anyway, I always remember to learn more.

6 answers2024-03-08

Holes, holes, and edges that are more than two meters deep can be considered high-altitude work.

7 answers2024-03-08

First, the general situation of the project.

This project is a vertical storage tank insulation project, the height of the storage tank is 10 meters, the diameter is 5 meters, the insulation material is polyurethane foam board, and the insulation thickness is 100mm. The construction site is an industrial park. >>>More

5 answers2024-03-08

1) Material processing and ordering.

According to the resource demand plan, get in touch with the building materials processing and equipment manufacturing departments or units, sign the supply contract, and ensure that the time is met. >>>More