In the case of a part-time construction site, it is generally charged according to the completed area, and the specific amount of money per square depends on the area.
-
On our side, there are those who follow the schedule, and there are also those who settle together at the end Are you part-time construction site?? Or do you go directly to a construction site to do the construction industry?
-
Large construction sites charge fees according to square meters, generally 100,000 square meters about 3 to 2 square meters.
Small construction sites are charged at one time, for example, this construction site is only 1,000 square meters, then how much can you charge at one time, and you can also negotiate with him, for example, the money for paper is paid by them, generally between 70,000 and 100,000 yuan at a time.
Of course, this also has to see the attendance, for example, if you only do the completion of the completion of the data, this is more cost-effective, a one-time about 2-30,000 yuan, as long as the data is done.
If you contract together with the safety data, then the ** is different, and the safety data is more expensive. I said that contracting is only a part of the contract, not all of it.
-
Issued by: Municipal Urban and Rural Development Commission.
Document number: [86] Jing Jian Gui Zi No. 097.
Release date: 1986-06-12
Date of implementation: 1986-07-01
Expiration Date: 1900-01-01
Beijing Municipal Urban Planning Administration:
Your bureau (86) Cheng Gui Fa Zi No. 180 document received. In order to ensure that the complete and accurate as-built drawings are submitted in a timely manner after the completion of the capital construction project, after research, we agree with your bureau's "Instructions on the Preparation of the Cost of Capital Construction Project Completion Drawings in the Capital Construction Budget Estimate", which is hereby approved as follows:
1. All capital construction projects in the Beijing area shall be prepared in accordance with the requirements of the state regulations and the "Regulations on the Management of Urban Construction Archives of Beijing Municipality" promulgated by the Beijing Municipal People's Government in 1983. The cost of preparing the as-built drawings shall be included in the estimated budget of the construction project by the construction unit, and the special funds shall be earmarked.
2. Interim standards for the collection of fees for the preparation of as-built drawings.
Class projects: national, provincial and municipal key construction projects, with international and national high-level large-scale projects, large-scale industrial buildings, etc., 8-10 of the design fee;
Class engineering: high-level large-scale projects with complex technical requirements, such as civil construction level 1 projects, medium-sized industrial construction projects, etc., charge 7-8 of the design fee;
Class engineering: medium and high-level, large and medium-sized projects, high-rise residential and comprehensive pipeline projects, civil building level 2 and level 3 projects, industrial building small projects, 6-7 of the design fee.
Generally, small and medium-sized civil buildings, such as multi-storey residences, office buildings, etc., can not be separately compiled as-built drawings, and the construction unit will sort out the construction drawings, negotiation records, instructions and other materials, and hand them over to the construction unit for safekeeping, without additional fees.
The above-mentioned fee standard is the fee standard for the preparation of a set of as-built drawings, if you need to increase the number of copies of the as-built drawings, the cost of each additional set of as-built drawings is charged at 10 of the first set of fees.
3. When the construction unit signs the construction contract with the construction unit, it shall clarify the preparation of the as-built drawings and the corresponding economic guarantee measures in accordance with the relevant national and municipal regulations.
Fourth, due to special circumstances, the construction unit can not undertake the preparation of as-built drawings. The construction unit and the construction unit must indicate when signing the construction contract that the construction unit shall provide complete and accurate original technical data for completion to the construction unit at no cost. (including construction drawings, as-built grass ** word description, etc.).
The construction unit entrusts other units (formal design or construction units) that are qualified to do as-built drawings to undertake the preparation of as-built drawings.
5. This charging standard is applicable to civil buildings, industrial buildings and municipal public facilities (including buildings and pipelines) in Beijing. Sino-foreign joint venture projects shall be calculated according to the corresponding domestic engineering design fee standards.
This circular shall come into force on July 1, 1986.
-
Now it is generally 2 yuan per square meter to be responsible for paper, etc., but it depends on the contract area, and the amount of small work will sometimes be high.
1. Precautions for construction sites
(1) Pay attention to labor protection, correctly use protective equipment and utensils, and strictly follow the operating procedures for construction. Pay attention to fire safety, enter the construction site operation area, especially around flammable and explosive materials, and strictly prohibit smoking. Open flame operations shall not be carried out at the same time and in the same place as flammable and explosive operations.
(2) Wear tight-fitting work clothes, non-slip shoes, safety helmets, and safety belts when working at height. In the event of heavy fog, heavy rain and strong winds above level 6, it is forbidden to work at height. Special attention should be paid to platform protection, edge protection, and hole protection during high-altitude operations, and safety regulations should be strictly observed during cross operations and climbing operations.
Second, the characteristics of site construction
(1) There are many three-dimensional cross operations. The structure of building products is complex, the construction period is tight, and it is necessary to cooperate with each other in multiple units and types of work, and the three-dimensional cross construction, if the management is not good, the connection is improper, and the protection is not strict, it may cause mutual injury. There are many temporary employees.
At present, migrant workers account for about 50 70 of the workers working on the front line of construction sites, and some construction sites are as high as 95%.
(2) There are many high-altitude operations. According to the national standard "Classification of Work at Height", more than 90% of the construction is work at height. There are many open-air operations. The open air work of the building accounts for about 70% of the total workload.
-
There are no regulations on this, just look at the discussion, generally it is 1-2 yuan a square.
-
Summary. Dear, Hello, the service fee for materials related to construction projects is a management fee;
Dear, Hello, the service fee for materials related to construction projects is a management fee;
Dear, Hello, the cost of materials related to construction projects should be included in the management expenses. Administrative expenses: The expenses incurred by the administrative department of the enterprise in organizing and managing the activities of the Friendship Camp.
Including: company funds, trade union funds, business entertainment expenses, and real estate tax information fees are the expenses incurred by the company's operation and management, so they should be included in the management expenses.
Shouldn't the data service fee for a single project be included in the project cost?
Hello, dear, yes.
Which is better, management fee or engineering cost.
Hello dear, it's generally an administrative expense.
Good. Good kiss.
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
1. Construction project documents and archives carrier:
1) Paper carrier: paper-based carrier form. >>>More
What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.
First of all, you must ensure your own business level, like the construction industry pays more attention to practical experience, some masters have worked for a lifetime, especially carpenters are more stubborn, you must improve your ability, so that others can convince you that you can manage your people more conveniently, secondly, use different methods for different people, and quietly listen to what others say when they encounter problems that they don't understand, (learn more by themselves) don't talk nonsense for the sake of face, so you will be laughed at by others. I haven't been doing it for long, and anyway, I always remember to learn more.