Little five classmates v5 ah。。 So all asked.
-
No, this is because it is overused, too wasteful, the asphalt concrete batching plant has a heating system, asphalt spraying and storage system, which are not used in cement concrete mixing, if you have to use it, it must be transformed, so it is better to buy a new concrete special batching plant.
The huge surface area of fine particles (mostly less than millimeters) makes the asphalt material form a thin film, thereby improving the bonding strength and temperature stability of the asphalt material. The locking force, on the other hand, is mainly generated between the coarse aggregate particles.
When choosing asphalt concrete ore gradation, it is necessary to take into account the two, so as to achieve that the mixture can form a dense, stable, suitable roughness and durable pavement after adding an appropriate amount of asphalt.
-
Yes, as long as the temperature of the gravel is kept at room temperature (about 30 degrees C) when the gravel is mixed. The results of the experiment can be demonstrated.
-
Said can not be used, this is because of overkill, too wasteful, asphalt concrete batching plant has a heating system, asphalt spraying and storage system, these are not used in cement concrete mixing, if you have to use, must be transformed, then it is better to buy a new concrete special batching plant.
If it can be used, it can only be transformed like the above, but it is really a waste.
-
In a word, it can't be used, the production process is different.
-
Summary. The construction time of the asphalt mixing plant generally takes 2-3 months, and the specific time depends on the size and complexity of the mixing plant. Before building the plant, it is necessary to carry out equipment selection, equipment installation, commissioning and other work to ensure the normal operation of the mixing plant.
First of all, it is necessary to select the appropriate equipment according to the scale and complexity of the mixing plant, including mixer, mixing tank, mixing drum, mixing tank, etc., as well as control system, hydraulic system, etc. Secondly, the installation of equipment, including the installation of mixers, mixing tanks, mixing drums, mixing tanks, etc., as well as control systems, hydraulic systems, etc. Finally, the commissioning is carried out, including the commissioning of the mixer, mixing tank, mixing drum, mixing tank, etc., as well as the commissioning of the control system, hydraulic system, etc.
In the process of building the plant, it is necessary to pay attention to the installation quality of the equipment to ensure the normal operation of the mixing plant. In addition, it is also necessary to pay attention to the safety of the equipment to ensure the safe operation of the mixing plant. In addition, it is also necessary to pay attention to the maintenance of the equipment to ensure the long-term normal operation of the mixing plant.
The construction time of the asphalt mixing plant generally takes 2-3 months, and the specific time depends on the size and complexity of the mixing plant. Before the construction of the plant, it is necessary to carry out equipment selection, equipment installation, and debugging of the leasing liquid to ensure the normal operation of the mixing plant. First of all, it is necessary to select the appropriate equipment according to the scale and complexity of the mixing plant, including mixer, mixing tank, mixing drum, mixing tank, etc., as well as control system, hydraulic system, etc.
Secondly, the installation of equipment, including the installation of mixers, mixing tanks, mixing drums, mixing tanks, etc., as well as control systems, hydraulic systems, etc. Finally, the commissioning is carried out, including the commissioning of the mixer macro, mixing tank, mixing drum, mixing tank, etc., as well as the commissioning of the control system, hydraulic system, etc. In the process of building the station, it is necessary to pay attention to the installation quality of the equipment to ensure the normal operation of the mixing training station.
In addition, it is also necessary to pay attention to the safety of the equipment to ensure the safe operation of the mixing plant. In addition, it is also necessary to pay attention to the maintenance of the equipment to ensure the long-term normal operation of the mixing plant.
Can you add, I don't quite understand it.
The construction time of the asphalt mixing plant generally takes 2-3 months, depending on the size of the plant, the complexity of the equipment and the environmental conditions of the construction site. First of all, the construction of the mixing plant needs to be carried out in accordance with the design drawings, and Sun Yingqing needs to be installed in accordance with the design requirements during the construction process, which takes a certain amount of time. Secondly, the complexity of the equipment of the mixing plant will also affect the construction time, the more complex the equipment, the longer the installation time, and the construction time will be extended accordingly.
Finally, the environmental conditions of the construction site will also affect the construction time, if the environmental conditions on the site are good, the construction progress will be accelerated, and the construction time will be shortened. In short, the construction time of the asphalt mixing plant generally takes 2-3 months, but the specific time depends on the scale of the mixing plant, the complexity of the equipment and the environmental conditions of the construction site. In the process of building a station, construction management should be strengthened to ensure the quality of construction, shorten the construction time, and improve the efficiency of the project.
-
Yes, asphalt mixing plant needs equipment configuration. The main equipment of asphalt mixing plant includes:
Asphalt boiler: used to heat asphalt.
Asphalt conveying system: use the finger bucket to convey the asphalt to the mixer.
Mixer: Used to mix asphalt and other materials together.
Asphalt cooling system: used to cool asphalt.
Asphalt conveyor truck: used to convey asphalt to the construction site.
In addition to these main equipment, asphalt mixing plant also needs some auxiliary equipment, such as:
Fuel storage tank: used to store fuel.
Water tank: used to store water.
Power system: used for power supply.
Control system: used to control the operation of equipment.
The equipment configuration of an asphalt mixing plant will vary according to its production capacity, output and process requirements.
-
1. In the process of operation, the mixing equipment should ensure that the equipment is in good condition, and should also be equipped with mineral moisture content detector and finished material tester, and often test the relevant data for the operator to adjust the operation in time to keep the equipment in good condition.
2. In addition to affecting the production capacity, the moisture content of the ore is also the main factor determining the fuel consumption. A material shed should be added.
3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there is a problem, it must be properly dealt with before operating, and it is important not to work with illness.
4. The operation must be carried out in strict accordance with the procedures and precautions specified in the instruction manual. After the ignition is normal, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; After the start of production, the hot material elevator and agitator should be monitored to work properly to coordinate the operation of other parts. I don't think so.
5. After the operation is over, the material should be stopped and stopped, the burner should be gradually turned off, the stirrer should be washed with hot fine materials, and the hot materials in the drying drum and stirrer should be discharged; When the temperature of the drying drum drops to 45 500C, stop the operation of the drying drum, blower and dust removal system, and cut off the total power supply of the operation room.
6. The use of wet dust collector, Qinqing contains sulfur and other elements in the flue gas, and the purified water will acidify and corrode the metal, so it is necessary to add neutralizer to the water and replace the circulating water regularly.
A set of mobile mixing plants will vary according to the model and configuration, generally ranging from hundreds of thousands to seven or eight hundred thousand, and the specific equipment will be subject to the manufacturer, because the quality of the equipment produced by different manufacturers is different, and the production process is different, so the sales will naturally be different.
The mix ratio is calculated according to the strength grade. >>>More
Constant temperature and humidity standard curing box SHBY-40B >>>More
Just look at the difference between the mixing plants.
The three major indicators point to penetration, ductility and softening point. >>>More