What are the precautions for acceptance after the decoration of the new house?

Updated on home 2024-03-14
6 answers
  1. Anonymous users2024-02-06

    It is not easy to decorate a house, both the owner and the construction personnel have paid a lot, so it is particularly important to accept the house after the decoration. Many owners do not know how to accept after the decoration, which has a lot to pay attention to, today we will talk about how to accept the house after the decoration? What are the precautions for acceptance?

    1. How to accept the house after the renovation is completed.

    1. Hydropower acceptance.

    Hydropower projects are relatively hidden projects in the decoration of Chinese style, so when accepting hydropower, we must be careful and careful and strictly follow the standards for acceptance. To be on the safe side, all joints must be wound 5-8 times after the wire is wound. After the completion of the line transformation, the insulation resistance test must be greater than the megaohm, the line transformation is horizontal and vertical, the socket and switch are 15cm, and the lamp head is 40cm (according to the actual line pipe collection).

    Waterproofing must be done well, the ground should be tested for waterproofing, waterproof problems are not only affected by their own homes, but also downstairs residents will be affected when there is leakage and wear. The acceptance of the water pipe must be pressurized for 24 hours after completion.

    2. Wall and floor tile engineering.

    The acceptance of the wall and floor tiles can not have obvious staggered joints, no broken bricks, and porcelain missing corner bricks on the wall. The joints of wall and floor tiles should not exceed 3mm, the socket or water pipe opening should be limited to the decorative panel that can be covered, there should be no voids between adjacent panels, the height difference of the joints should not exceed 1mm, the surface flatness should not exceed 3mm, and the verticality of the façade should not exceed 3mm. The hook seam should be uniform and consistent, and there should be no accumulation at the yin corner.

    Toilets, balconies and kitchen tiles with floor drains have sufficient self-draining slope, and toilets have a slope of 5 thousandths.

    3. Paint acceptance.

    The surface of the furniture varnish should be of consistent thickness, saturated with paint, clean and free of particles. Is the surface of the furniture mixed with oil smooth and saturated? Make sure that there is no blistering, that there are no cracks in the beams, and that the paint thickness is balanced and the color is consistent.

    The seams of the wallpaper should be accurate, and the pattern and pattern style should be seen whether there is a deviation in the splicing, and whether there are stains on the wall.

    2. What are the precautions for acceptance.

    1. Check the faucet to see if there is any water leakage.

    2. If you don't have the help of professional tools when checking the toilet, you can stand on the toilet to see if it is strong and how it bears the load.

    3. Turn on the lights in the house when the switch and socket are checked, start to test the switch, and shake the socket to see if there are signs of looseness.

  2. Anonymous users2024-02-05

    Renovation is a painful and happy thing, and the acceptance of the new house decoration marks the end of this journey. How to accept the renovated new house? What are the key points of acceptance that are often overlooked by consumers but are very important?

    There are three things you must pay attention to. The first is the acceptance of the overall decoration effect, followed by the acceptance of the kitchen and bathroom area, and finally the acceptance of the water and electricity pipelines.

    Everyone has a perfect home sample in mind, and a renovation journey starts with this blueprint. Whether the overall effect of the new house decoration acceptance meets the requirements of consumers is an important indicator of home decoration results. The so-called overall effect is a comprehensive visual experience of the overall style, color, furniture and so on of the home.

    This requires consumers to verify from their own feelings, and if there is a discrepancy with the expected goal, they can continue to communicate with the designer to improve.

    The two most important functional areas for the renovation and acceptance of new houses are the kitchen and bathroom. The kitchen is an important area with both function and storage, and whether the structural design of the kitchen and the decoration effect of kitchen cabinets and other furniture in the later stage are reasonable is a very important acceptance index.

    Bathroom is a necessary functional area for every family, clean and dry is the primary indicator of bathroom decoration effect, in addition, a good bathroom design effect is also a very important point when the new house decoration acceptance, that is, space-saving and perfect to meet the needs of a family bathroom is the best bathroom decoration effect.

    As we all know, once there is a problem with the water and electricity pipelines after the new house is settled, it will be a very troublesome thing to repair, not only consuming manpower, material and financial resources, but also turning the new house into a construction site again. Therefore, the time point of the new house decoration acceptance of the water and electricity pipeline must be carried out after the completion of the hard decoration to ensure that there will be no rework due to water and electricity problems after the subsequent decoration is completed.

  3. Anonymous users2024-02-04

    Acceptance of new housesWhen paying attention to waterproofing, the waterproofing here refers to the waterproofing of the kitchen and bathroom. Of course, some of the houses currently delivered have been declared in advance that they have not been waterproofed, which needs to be done during the renovation. If it is delivered with a waterproofing finish, then you will need to verify the quality of the waterproofing.

  4. Anonymous users2024-02-03

    Ground level testing is to measure the horizontal error between the indoor ground farthest from the door and the ground inside the doorway. In many cases, it can also reflect the quality of the developer's construction. Because as the owner, it is impossible to accept the main structure, so you can only look at the quality from these details.

  5. Anonymous users2024-02-02

    Acceptance of new housesWhen paying attention to the inspection of the pipeline, the pipe referred to here is the drainage or sewage pipe, especially the sewage outlet in the balcony and other places. At the time of acceptance, take a water utensil, pour water into the drain, and see if the water flows away smoothly.

    Why do you want to accept this? Because during the construction of the project, some workers tend to pour some cement slag into the drainage pipe when cleaning, if the cement is sticky, it will be blocked at the elbow, resulting in drainage difficulties.

  6. Anonymous users2024-02-01

    We all know that decoration is a very troublesome thing, but also a headache, now everyone has higher and higher requirements for decoration, the decoration of the new house is not just brush the paint so simple, it is very laborious and time-consuming to operate, its process is complex, to go through a lot of processes. So what are the house decoration processes and precautions? 1.

    New house decoration attention: the first out of the plan, in general, it is best to master the decoration process before starting the decoration, after all, decorating the house is a systematic project. When the owner gets the key to the new house, you need to judge what kind of living facilities you need through the structure of the house and the general space layout, these must have a number in your heart, with such plans and planners and then go to find more professional designers, make a good plan, and basically get a better improvement in the early stage of decoration.

    2.Attention to the decoration of the new house: the most important point in the process of hydropower renovation and decoration is the hydropower project, because this is not only related to the convenience and practicality of future life, but more importantly, the water and electricity are directly related to the safe living environment of the family, so when decorating, we must do a good job of water and electricity adaptation according to the location of the electrical appliances in the decoration plan and the place where water is needed, so that life is more convenient and comfortable.

    3.Attention to the decoration of the new house: paving floor tiles or brushing the wall, the second thing to pay attention to is the cleanliness of the ground and wall when laying the floor tiles and brushing the wall.

    Because some companies paint the wall first and then lay the floor tiles, from top to bottom, the bricks will not be dirty; Some companies lay bricks first and then paint the walls, saving them from sometimes using a cutting machine to dirt the wall when laying bricks. 4.New house decoration note:

    In addition, the firmness of the installation of doors and windows, the style of the ceiling and the safety of the decoration are more important in the decoration, and the owners should pay enough attention and attention. There are also some problems in the installation details should also be paid attention to, and the quality of the installation project should be checked by yourself to avoid problems after installation and use for a period of time. In short, although the home decoration project is not as complex as the decoration of the office building, but it also needs to be done by ourselves, carefully check the details, after each step is completed, we must be qualified before the next step of decoration, otherwise the later transformation is very complicated and troublesome.

Related questions
6 answers2024-03-14

The first is the acceptance of certificates: when the developer delivers the commercial house, it should show the buyer the "Record Registration Certificate for the Completion and Acceptance of the Commodity Housing", and the "Housing Quality Assurance Certificate", "Residential Instruction Manual" and the measured area report of the house must be provided to the buyer; If the above relevant information is not presented, the buyer may refuse to accept the house and complain to the construction administrative department. The second is on-site acceptance >>>More

22 answers2024-03-14

3,4,5,6 months decoration is better, decoration cost is not luxury decoration, 100 square meters or so 150,000 or so. Please comment on me, thanks.

4 answers2024-03-14

The construction acceptance of the paint can also be seen from some small details. >>>More

6 answers2024-03-14

Decoration half package refers to a decoration method in which the owner purchases decoration materials by himself and the decoration company is responsible for the construction. When choosing a decoration half package, you need to pay attention to the following aspects. >>>More

6 answers2024-03-14

Pay attention to 6 points in the decoration of new houses: 1. Design the style of the house first; 2. Hard installation should be determined and then installed; 3. The decoration of the living room should consider the placement of furniture and household appliances; 4. The ceiling light in the bedroom is equipped with dual control, and the corridor is equipped with voice control; 5. Kitchen gas alarm, sink away from stove socket; 6. Leave a certain slope on the balcony and bathroom to install floor drains.