The first is the acceptance of certificates: when the developer delivers the commercial house, it should show the buyer the "Record Registration Certificate for the Completion and Acceptance of the Commodity Housing", and the "Housing Quality Assurance Certificate", "Residential Instruction Manual" and the measured area report of the house must be provided to the buyer; If the above relevant information is not presented, the buyer may refuse to accept the house and complain to the construction administrative department. The second is on-site acceptance
1. Whether the delivered house is the house you purchased, and whether its structural design is consistent with the original drawing; 2. Whether the quality of the house is qualified, whether the doors and windows are consistent with the contract; 3. Whether the ancillary facilities such as water and electricity are in place according to the contract; 4. How well the projects agreed in other contracts are done. If there is any discrepancy in the inspection, you can refuse to sign for it and record it truthfully on the handover record. All completed houses must generally achieve "five links and one leveling", that is, water supply, drainage, power supply, communication, access roads, and land leveling.
The domestic water supply system of high-rise residential buildings must have a water supply certificate issued by the health and epidemic prevention department; The elevator of high-rise residential buildings must have a safety operation certificate issued by the labor department; The fire water supply system of high-rise residential buildings must be inspected and qualified by the fire department. The house should be fully equipped and complete in accordance with the requirements of drawings and documents.
-
There are two types of acceptance of new houses: renovated and unrenovated (rough houses).
Let's talk about the renovated first:
First, see whether the developer has obtained the "Completion Acceptance Record Certificate", which clearly stipulates that it is impossible to handle the property right registration without the "Completion Acceptance Record Certificate", and even if the house is received, there is a risk that the property right certificate cannot be handled, and there must be the "Housing Quality Assurance Certificate", "Residential Instruction Manual" and the measured area report of the house.
Second, buyers check the quality of their homes on their own.
Doors and windows: 1) Whether the latches and locks of the doors and doors are too long and tight.
2) Is the door plug inserted too little? Whether the door gap is too large (especially on one side of the lock).
3) Are the four sides of the door close to the door frame? There is no special sound when the door is opened and closed.
4) Are there any water stains under the window sill? If so, it may be a leaking window.
5) Is there a gap between the window edge and the concrete interface?
6) Is it too tight to open and close the window? Can it be closed properly?
7) Is the window glass in good condition?
Flooring: 1) Is the floor loose? Burst? Bump into the dent? Does it squeak when walking?
2) Is the floor gap too large?
3) No large black water stains on teak floors?
4) Is the anchor interface appropriate? Is there any looseness?
Ceiling: Is there any water stain on the roof? Crack? Pay special attention to the toilet roof for peeling paint or mould.
Wall: 1) Are the walls and ceilings particularly tilted? Curved? Waves? Where are the bulges or depressions?
2) Is there a partial bulge in the ceiling of the wall, and is there a sound of hollowness when you knock it with a wooden stick? Are there any water stains in the corner joints? Crack?
3) Is there any clear water in the wall and corner joints? Crack?
Kitchen and toilet: 1) Is there any crack in the toilet and bath? The cracks are sometimes as thin as a hair and should be looked at carefully.
2) Is the toilet drain smooth? Is the flushing sound normal? Is there a leaking sound in the flushing tank?
3) Is it proper to waterproof the bathtub, basin and the wall or the interface of the rejection?
4) Are the kitchen tiles and mosaics loose and uneven? Is there any water seepage in the brick joint?
5) Is there cement on the kitchenware, tiles and sewer pipes that have not been cleaned?
6) Is the pool faucet proper? Is the water going smoothly?
7) Is the drain in the kitchen and bathroom drain fast and properly?
8) Is there any deformation of the kitchen cabinet? Can the door open and close smoothly?
Others: 1) Is the wall cabinet door firm and square?
2) Try all the switches, sockets and main switch?
3) Is it appropriate to test the switch of the gas water heater?
Let's talk about the rough house: the rough house inspection is much simpler, as long as you bring a small hammer, a small bucket, and a level when you go. During the house inspection, use a small hammer to knock on the ground and wall to check whether there is a hollow drum; Then turn on the faucet and light switch to see if there is water and electricity, and then use a small bucket to check whether the floor drain and pipeline are blocked; Check whether the door and window opening and closing are smooth, and whether the surface and parts are damaged; Use a level ruler to measure whether the ground, ceiling, wall, window frame, door frame, yin angle, yang angle, etc. are flat, straight, vertical, and whether there are cracks; It is best to check whether there is water leakage on the doors, windows and walls on a stormy day.
Of course, it is impossible to find all the problems during the house inspection, and you can still find the property for maintenance if there are any problems in the future!
-
The house is well renovated and I believe everyone can't wait to move into their new home as soon as possible. But it is precisely because of this mood that many people ignore some issues that should be paid attention to when moving to a new home. So, what should we pay attention to when moving into a new house?
1. Precautions for moving into a new house.
1. Before moving to a new home, be sure to ventilate for at least 6 months. If there are young and old people in the family, the time will be longer; 2. Contact the moving company and make sure that when you are free, pack the things you want to move; 3. When moving furniture and other heavy objects into a room with a wooden floor, handle them gently and protect them.
2. What preparations should be made for moving to a new home?
1. Drying room. Due to the use of a large number of building materials in the decoration, some of these materials will release toxic gases, although the early use of environmentally friendly materials, the content of harmful gases is very low, but a variety of materials mixed together, the content of harmful gases will become larger. Therefore, after the decoration of the new house, it needs to be properly dried and ventilated, so that the later check-in will not cause physical discomfort.
2. Dehumidification. The newly renovated house is heavily damp, whether it is newly bought furniture, or the wall or floor, it is a place where moisture gathers, and it needs to be carefully treated.
Spider plants, aloe vera, pineapple, lemon, etc., you may wish to use them at home before moving in, and replace them regularly.
4. Remove formaldehyde.
Formaldehyde is recognized as a killer of household health, formaldehyde brings great harm to people, whether it is the elderly, children or adults, will cause physical discomfort due to excessive formaldehyde content. The release period of formaldehyde is as long as 3-15 years, so formaldehyde must be comprehensively treated.
Article summary: The above is all about the precautions for new house occupancy. I hope the content of the above article can solve the doubts in everyone's mind. If you still want to know more decoration information, you must be more ****!
-
1. Pay attention to the decoration time. Before moving in, you should do a good job of ventilation, and you should consider the air quality in the house when preparing to move in, so as to avoid excessive formaldehyde concentration in the house when moving in, which will bring health risks to children and the elderly.
2. Check the water and electricity. Although it is necessary to accept the house once it is received, it is inevitable that there will be some other problems during the vacancy period, and the water and electricity can be used normally when moving in, and there is no leakage, air leakage and water leakage, so as to avoid the dilemma of repairing just after moving in.
3. Add plants. Plants can be a great help in both air purification and interior decoration, and you should add a few shades of green to your home when you move in. Indoor air and style can be upgraded a notch with the help of plants.
4. Pay attention to furniture. When moving, you should pay attention to the structure of the furniture to avoid bumping, the floor, the wall decoration has a layer of decorative surface, if the furniture is bumped when moving the damage caused by the damage, the effect after repair will be worse than the original decoration effect, when moving should be moved gently. In addition, you should also be careful when moving valuable furniture, as it is also a loss if it is broken.
5. Get to know your neighbors. After moving in, you should say hello to the neighbors around you and let people know that this room is occupied. It is inevitable that you will need help in the future, and it is important to build a good relationship with your neighbors.
6. Cleaning. If no one takes care of it for a long time, the dust accumulation in the house must be very serious. After all, it is a new house, and some small corners and difficult points should be dealt with, leaving a good impression on yourself and the new house, and the new environment should also have a fresh start.
-
1: [Be sure to check before moving in].
Generally, before receiving the keys to the new house, the renovation company or developer (hardcover house) will ask the owner to carry out an acceptance of the house.
When accepting, it must be careful and careful. If you are not very good at it, you can ask a professional to help you with the acceptance.
2: [The bathroom must do a closed water test].
Generally, before moving into a new house, you must do a closed water test in the bathroom, and before doing a closed water test, you must communicate with the owner downstairs.
Method: Fill the bathroom with a certain amount of water, let it stand for a longer time, see if the amount of water has decreased, and observe whether there is water seepage outside the bathroom.
After a period of closed water test, go downstairs to observe whether there is water seepage on the top of the bathroom, if there is no water seepage in all inspections, it means that the waterproof is qualified.
3: [It is recommended to do a closed water test upstairs].
Before moving in, the closed water test of the bathroom of your new house is to find out whether there is a problem with your own waterproofing in time, and solve the problem in time, so as not to cause unnecessary losses to the owners downstairs.
However, whether the top of the bathroom of your home will suffer damage, you have to negotiate with the owner upstairs, it is recommended to do a closed water test, if the waterproofing after the closed water test upstairs is no problem, there is no worries.
4: [Check whether the power socket is powered on].
Before moving into a new house, be sure to check whether each power outlet in the home can be used normally, whether the location of each power outlet is appropriate, and whether it is convenient to use.
Because in daily life, it is inseparable from the use of "electricity", and only the position of the socket is reasonable, so as not to pull the plug-in board indiscriminately and avoid the increase of unsafe factors. Therefore, the rationality of the location of the power socket cannot be ignored.
5: [Check whether the water pipe and the figure-eight valve are normal].
Before renovating and moving into a new house, be sure to check whether the water pipes and figure-eight valves are normal.
Method: Open the water pipe and release the water for a period of time to check whether the water pipe is overflowing. No overflow proves that the water pipe is normal.
In the process of discharging water from the water pipe, it is necessary to check whether the eight-figure valve of hot and cold water is leaking. Here's how:
When putting cold water or hot water alone, on the corresponding cold and hot water valve of the figure-of-eight valve, wipe it vigorously with a piece of dry paper towel to observe whether there are water stains on the dry paper towel that has been wiped through the figure-eight valve, if it is still a dry paper towel, it means that the figure-eight valve is normal and does not leak.
-
3. The day before X09 moves in, please fill the house with water, such as wash basins, buckets, etc. The day before moving into the new house, fill a bucket of water and put it in the hall, and then turn on the fan to fall asleep, which represents the wind and water. 4. X09 brings some soil from the old house to the new house to prevent it from being unsuitable for the new house.
5. The date indicated on the Tongsheng as the appropriate date for occupancy in the good season of x09 is the auspicious day of the zodiac. 6. When X09 moves, it is best for others to handle the things to be removed from the new house. It's best to do what you want to move into your new home.
2. On the day of moving in: 1. Firecrackers should be set off when the new house is moved in to drive away evil spirits and avoid danger. 2. After opening the door, the two pomelos bought in advance will follow up the house from the ruins at the door, implying that the wealth is rolling.
3. Prepare several items on the day of moving, and you must move these items to the kitchen before other things are moved into the house. 4. A red envelope is placed on top of Mitong, which means that you can share plenty of food and clothing after moving in. 5. Fill the water bucket with three parts.
6. The bowls and chopsticks are placed in the bucket, the double number is better, and the bowls and chopsticks used in the old house are a set per person, and the red paper is tied on them, which represents the prosperity of the people and the good things come in pairs. 7. A stove to pray for the prosperity of the family. The stove represents a masculine thing, and it also has the meaning of wind and fire, prosperity and success.
8. Prepare a pair of garbage shovels and a new broom, tied with red cloth, symbolizing the removal of the old and the welcome of the new. 9. Bring a handful of soil from the old house to resist the soil. 10. The new door should be pasted with red couplets for good luck.
11. When moving, the above things must be put into the kitchen, and other things can be entered into the house. 12. Turn on the lights, kerosene lamps were used in ancient times, and all the modern home furnishings can be turned on. Open 24 hours a day13
On the day of check-in, it is to ask the owner of the house to go to the kitchen to light a fire, be sure to boil a pot of boiling water, put it in the hall**, use a swinging fan, and say back and forth to the opening. 14. If there is no auspicious bed on the day of entering the house, you can first put the bed security in place and wait until the auspicious time of the bed is placed. 15. Don't be angry on the day of moving, you must say auspicious words and do auspicious things.
3. After moving in, you can worship the foundation master at dusk, and the legend says that the foundation master grid is relatively short, and you should worship at the kitchen door when worshipping. 2. After the housewarming, no matter how long the time is, in order to pray for the safety of the family, a family god worship is held. 3. It is best not to move if you have a pregnant woman.
4. If you want to make a house on the first day or the first week after moving, you should invite relatives, friends and neighbors to your home to have a lively time, and the more lively it is, the more auspicious it is. 5. After the completion of the house, worship the gods of the house, feast relatives, friends and neighbors, etc., to be safe and auspicious. 6. At dusk of the same day, a low table is set up at the door of the kitchen as an offering table, and a home-cooked food, meat, and soup are placed on the table, and a meal is one night, three glasses of wine, a pair of red candles, and three incense sticks.
When you enter the house, you can use an appropriate amount of life money, monetization money, and land money, and avoid using gold and silver paper.
Dietary contraindications for diabetes 1Diabetics should not drink sugary carbonated drinks, such as Coke, Sprite, etc. If a diabetic person sweats a lot, does not hydrate in time, or drinks a lot of sugary drinks, it is very easy to lead to diabetic nonketotic hyperosmolar coma (a complication of type 2 diabetes, manifested by high blood sugar, severe dehydration, and impaired consciousness). >>>More
First, we should pay attention to the impact of high temperature weather on the equipment, continuous high temperature, efficient operation of the equipment, we need to pay attention to the problem of excessive temperature to prevent the equipment from burning and destroying. >>>More
3,4,5,6 months decoration is better, decoration cost is not luxury decoration, 100 square meters or so 150,000 or so. Please comment on me, thanks.
Decoration half package refers to a decoration method in which the owner purchases decoration materials by himself and the decoration company is responsible for the construction. When choosing a decoration half package, you need to pay attention to the following aspects. >>>More
If you want to talk about the precautions for renting a house online, I have been floating outside for a while, and I have basically experienced a hundred battles. >>>More