The treatment of Dongfang steam turbines, the advantages and disadvantages of Dongfang steam turbine

Updated on science 2024-03-13
6 answers
  1. Anonymous users2024-02-06

    Don't you see that he is engaged in design, and you are also studying design, and he doesn't want you to come because it will affect their jobs. When a pot of soup is cooked, who would want to share the soup with one more person? In fact, Dongqi's treatment is very good, and the consumption is not as high as in big cities.

    I won't say anything else, do you know the provident fund? I don't know what level the enterprise is compared to asking relatives and friends, the workers' provident fund deducts 1024 yuan per month (not average), not to mention the technology research and development department! But not all are good, with the company's orders decreasing this year, the efficiency has been declining, but the trend is not to become, the market needs to get through the cold winter.

    Warmly welcome people with lofty ideals to join! By the way, I am an ordinary front-line regular worker!

  2. Anonymous users2024-02-05

    Don't come to Tongji, go to the big city. I'd rather earn 5,000 in a big city (although the pressure of life is greater) than earn a salary of more than 3,000 in Deyang. Although it's okay to live in Deyang, don't lose your fighting spirit

  3. Anonymous users2024-02-04

    Their projects are all big projects, if you want to learn something, you will not be disappointed, if you only think about money when looking for a job, that's not what freshmen need to do, go back to your hometown to make some grades, buddy!

  4. Anonymous users2024-02-03

    I don't know if the other party wants you yet, so don't be in such a hurry.

  5. Anonymous users2024-02-02

    Advantages: The 65MW high temperature and ultra-high pressure primary reheat steam turbine has increased the cycle efficiency by 5 percentage points compared with the conventional 50MW pure condensing steam turbine. Compared with high-end CCPP, the initial investment and operating costs are low, and the national production has been realized, and Tan Xiaoxian shines in the field of energy conservation and emission reduction power generation. High temperature and ultra-high pressure are reheated once, which has become the standard configuration of gas power generation in the metallurgical industry. Disadvantages: Due to the large number of stages, the enthalpy drop of each stage is small, so that each stage can work within the optimal speed ratio range.

    The residual velocity of the previous stage can be used by the next level. The loss of the front stage of the multistage steam turbine will cause the increase of the steam enthalpy value after the stage, so that the sum of the ideal enthalpy drops of each stage is greater than the total ideal enthalpy drop. Multistage turbines can be designed as recuperative or intermediate reheat to improve the thermal efficiency of the cycle.

    The multi-stage steam turbine has high parameters and high power, which improves the economy and reduces the manufacturing and operating costs per kilowatt of capacity.

  6. Anonymous users2024-02-01

    Summary. It depends on the treatment regulations when you sign the agreement with the unit, generally speaking, the treatment of one or two master's students is very different, and it is possible to double the difference between the highest and the lowest. It also depends on the major you graduated from and the position you are applying for.

    Generally speaking, the treatment of master's students in one or two books is very different, and it is possible to double the difference between the highest and the lowest. It also depends on the major you graduated from and the position you are applying for.

    Dongfang Steam Turbine Factory undergraduate is generally 4000-6000 yuan per month.

    There are about 2,000 more master's degrees than undergraduates.

    The annual salary of 6w+ in the second year of master's students should be easy.

    In the past two years, the salary has been raised, basically the pre-tax of the core R&D and design post should be 20w+, the small leader of Xiaoliang or the professional and technical position of the bumper is basically 30w+, and the core technical personnel may be able to reach 30w before tax when encountering the grinding and beating of individual departments of key development. There are still differences in the treatment of different departments.

    If you want to talk about the development of the industry, it's just like that, you can't afford to starve to death, but you must not eat well, the environment is here, there is no way, and it is no longer the prosperous scene of Liang Zhieri ten years ago and twenty years ago.

    Wages fluctuate widely.

    It depends on what position you are in.

    In addition, the steam turbine factory, for the time being, is a sunset industry, but it is not starving. Doctor's words, it depends on what kind of mentality you have towards this kind of traditional central enterprises.

    If my answer is helpful to you, please give a thumbs up (comment in the lower left corner), look forward to your like, your efforts are very important to me, and your support is also the driving force for my progress. If you feel that I am satisfied with the answer of Fu Lu, you can click on my avatar for one-on-one consultation. Finally, I wish you good health and a good mood!

Related questions
6 answers2024-03-13

It is mainly distinguished according to the degree of temperature resistance of the steel. >>>More

6 answers2024-03-13

The above peers are all possible, add two points: one is the wear of each support bearing Ugin (you can use the settlement measurement tool provided by the manufacturer to measure the gap between the journal and the measuring tool during the overhaul without turning the tile, and then compare the value before installation or the measured value of the last overhaul, if the value becomes larger, that is, the bearing wear must be replaced by the tile), resulting in zero radial clearance between the rotor and the partition seal, and even to the degree of interference (bite to death), even if you turn on the top shaft oil pump, It is also impossible to move the rotor. The second is that the pressure between the top shaft oil pressure and each journal does not reach or exceed the design value (the manufacturer has the top shaft oil pressure of each bearing in the quality certificate (generally two ends, the middle is generally, the oil pressure is adjusted and then try (when adjusting the upper part of the journal to install a dial gauge to monitor the value).

6 answers2024-03-13

It is a special type of work, boilers, steam turbines, fuels for power plants, and they are all fuels >>>More