-
Precautions should be paid when designing and constructing houses for water and electricity:
Secondly, the flexibility of the circuit is also a key factor. You know, concentrating electrical plugs on one power strip is definitely better than having a full wall of outlets.
2.The distance between the socket and the ground is usually 30 cm, and the minimum should not be less than 20 cm. If you install a low cabinet or tatami mat, the distance from the ground can be adjusted appropriately.
At the same time, keep a little distance between the low cabinet and the wall, otherwise it is likely to block the socket. Secondly, the optimal distance between the switch and the ground is 130 cm.
3.Reminder for water and electricity decoration in new houses: If you want to carry out circuit transformation, then the capacity increase of the line must refer to the actual electricity consumption. If an instantaneous electric water heater is installed, the wires must be a standard 4 mm².
-
Hydropower construction is one of the most important elements in renovation, and there are many natural standards! Whether your home is ready for simple or luxurious renovations, utilities must meet standards or even higher. It's easier said than done, and many masters who have been decorating for decades will make mistakes!
The first item on how to decorate water and electricity is that before the construction of water and electricity, the owner must notify the decoration company 3 days in advance to bring the main materials to the site. Once on site, verify that all materials are checked against previous order documents. In order to avoid many decoration companies from using low-end products of big brands to fill up the number, be sure to check carefully to avoid safety problems!
1.Laying the line of **.
How to decorate water and electricity should also be noted that the type of conduit used by different cables is also different. Usually, the cable is marked on the cable. The most common ones are mainly the following:
PVC – laying flame retardant plastic pipes.
DGL – laid with electric steel pipes.
VXG – placed in a plastic link.
gxg – placed on a metal link.
KRG – Lined with flexible plastic tubes.
1. Complete the acceptance of the original house, the water circuit inspection of each basic waterway and the completion of the basic renewal procedures;
2. Remove unnecessary walls and build walls.
3. Determine the location of basic furniture and electrical appliances, and the style can not be selected first, but the size should be more or less fixed! Otherwise, it is not good to install the socket later!
4. The ceiling of the house is determined, where the lamp is needed, and what kind of lamp.
5. Contact the designer to confirm the hydropower design and lighting design!
6. How to decorate other customized needs in water and electricity;
7. Confirm the basic position of the kitchen and lamp holder with the cabinet designer!
8. Confirm whether the water heater in your home is electric or natural gas, or other heating methods;
9. The size and specifications of the selected water heater are not jacuzzi.
10. Make an appointment with a hydropower engineer in advance to make a decision on the site and do a good job directly in the project budget.
Water pipes and electrical pipes are different. Among the precautions on how to decorate water and electricity, the work of checking the water pipes is the most important. When the cement is sealed, it is expensive to remove it again!
Usually, the stress test method is used for inspection. First, all the internal elbows of the cable are plugged with plugs. The pressure test was carried out with a pressure gauge of 6-8 kg and confirmed that there was no water leakage in all joints.
Another way is to install the plug, open the door for two days and two nights, and check for leaks on the third day!
There are still many places to pay attention to how to decorate water and electricity, so we must carefully carry out acceptance after decoration, so as not to bring unnecessary hidden dangers to the home with a little omission.
You can get it for free
-
Construction according to the drawings, in accordance with the national and local engineering acceptance standards.
-
The subject is good, we all know that the decoration of water and electricity is a hidden project, but also a very important step in the decoration, the decoration of the water and electricity budget in the decoration budget accounted for 20 percent, said that it is very necessary to do a good job in the decoration of the water and electricity budget, the cost of water and electricity decoration is still considerable, so how to do a good job in the decoration of the water and electricity budget. Let's take a look. (1) Pay attention to practicality and do a good job in the decoration budget can achieve a better grasp of the overall situation of decoration, how to grasp the degree of water and electricity budget, and spend money on the key points.
As the saying goes, good steel is used on the blade, you can make appropriate modifications according to the ** given by the decoration company, and then make appropriate modifications, according to the price of goods at the time, and the decoration **, to consider, I feel that there are not many things used, you can not use it. Remember that flashy and unrealistic, luxury is not necessarily good, practical is really good. (2) The selection of construction methods is about the following types of water and electricity decoration mode, clear package construction, which requires the owner to participate in a very high degree of fun, to enjoy the fun of decorating the home, but to save a lot of money that is not necessary.
Half-package construction, choose this model, the owner can participate in the supervision of the construction process, the main materials are purchased by themselves, and some auxiliary materials are responsible for the construction, which is also quite trouble-saving and labor-saving. The advantage of this scheme is that the decoration company has a set of overall professional design schemes, and the construction specifications are relatively better, but the construction standards may not meet the requirements of the owner. and the last construction mode, finished hydropower construction.
This is an innovative professional hydropower construction model, the advantage of this model is to dilute the traditional model of over-reliance on the master's craftsmanship, but to standardize the process, no matter who constructs, as long as it is carried out according to the standard, you can produce high-quality terminal hydropower products. Choose the construction method that suits you according to your actual situation. Three.
Understand the materials here for you to provide some water and electricity decoration materials** (please verify by yourself due to the different places**, **there must be certain fluctuations) water pipe installation 59 yuan, sewer installation 69 yuan, weakness 16 yuan, strong electricity 23 yuan. The biggest material expense of water and electricity is water pipes and wires, understand these two **, you can save a lot, and the rest is not very much** is relatively cheap. The above matters related to the decoration of water and electricity budgets are introduced here, and here is a friendly reminder:
After the waterway renovation is completed, the pipeline pressure test should be done, and the experimental pressure should not be less than. That's about it, the above content is available for reference, I'm very happy with your question, I hope it will be useful to you. If you think it's powerful, give it a thumbs up and wish you a happy life.
-
Housing water and electricity decoration details:
1. Housing water and electricity: deepening of hydropower drawings.
1. When entering the site, hydropower workers must deepen it in accordance with the decoration layout drawing, comprehensive point plan and hydropower mechanical and electrical drawings;
2. When making the hydropower layout diagram, the direction of the hydropower pipeline should be integrated into the decorative comprehensive point map;
3. Carry out construction pay-off according to the comprehensive point map, determine the lamps, sanitary ware outlets and other points, and on this basis, the collision with the main keel and the auxiliary keel can be avoided to ensure the accuracy and uniformity of the size.
Second, the house water and electricity: toilet pipeline construction technology.
1. For the laying of water supply and drainage pipelines in the ceiling of the bathroom, the connection of drainage pipes should be made of 45° tee or 45° tee and 90° oblique tee or 90° oblique tee, or a 90° elbow with a radius of curvature not less than 4 times the diameter of the pipe to ensure smooth drainage; The depth of the floor drain water seal is less than 50mm
The drainage branch must be provided with a P bend or an S bend;
2. Expansion joint layout: each layer of the main pipeline is provided with a expansion joint.
3. When the hot and cold water pipes in the bathroom enter the mixing faucet, the direction of the hot and cold water cannot be reversed, and the regulations of "hot on the top and cold on the bottom" when the hot and cold pipes are installed in parallel up and down, and "hot on the left and cold on the right" when installed vertically and in parallel;
4. Special attention should be paid to leveling and alignment during the installation of the mixing faucet, and tilting must be avoided when installing the faucet;
5. Pipeline pressure test: Before the concealment of the water supply pipe in the hidden part, a single hydraulic test should be carried out according to the requirements of the drawings or specifications, and the records and inspection data should be made.
6. The construction can only be carried out after the hydraulic test is qualified, the insulation material is consistent with the size of the water pipe, and the green mark is made on the outer wall of the reclaimed water pipeline after the insulation is completed, and the arrow points to the direction of the water flow.
7. During the construction of the bathtub pipeline, the position of the water supply and drainage connection should be considered to facilitate installation and maintenance;
8. There must be a slope during the construction of the drainage pipeline, and there must be no reverse slope phenomenon (there should be a slope of 2 5, and the slope drainage device);
9. Cleaning port and inspection port layout: Cleaning port or inspection port should be set on the sewage horizontal pipe connecting 2 or more than 2 toilets or 3 or more sanitary appliances, and the direction and position of the inspection port should be convenient for maintenance;
10. The installation of the bathtub must be positioned by infrared level, all the interfaces of the sewer pipe should be sealed, the lock nut should be tightened, and the interface should not be subjected to external force; After the installation is completed, the full water test and water test must be done, and the bathtub drainage branch pipe must be observed for leakage.
-
1. Diameter and wall thickness of line pipe.
2. The size of the wire.
3. The layout of the line.
4. The wall thickness of the PPR water pipe.
-
Hydropower projects in the home are closely related to our lives and cannot be underestimated, so the quality of hydropower projects must be controlled when the house is accepted. You should be sure that you can keep the original pipeline as it is, and make changes according to the designer's design, so that you can also do it. So what should be paid attention to in the design of water and electricity for new house decoration?
1.Wire Material: Select the wire that meets the standard, and select the wire according to the standard 2 of the power used by the appliance
The selection of auxiliary materials (conduits, wire boxes, locks, etc.) should meet the standards (hardness, flame retardant and insulating materials) 3The line pipe is laid neatly, try to walk against the wall, and do not cross to 4There is no elbow fitting for the laying of the line pipe, and the connection between the line pipe and the wire box should have a lock 5
The design of the circuit in the home can be based on the room type; the function of each room; Design of the location of electrical appliances in the home 6It is recommended to ask the decoration company for the circuit diagram at the same time, and take some real samples after the circuit is laid**The laying of the waterway: (1).
Material selection of new environmentally friendly materials (2).The direction of the material should be avoided as much as possible (generally electricity goes below, and water goes from above), and less detours (otherwise it will not only waste materials, but also affect the flow of water at home) (3) After the installation of the water pipe, the pressure test must be seen by the family at the scene (4) It is recommended to take a picture of the actual pipeline ** After the installation of the water circuit, it is necessary to pay attention to the protection of the wire pipe and water pipe in the later decoration process, because the product as a plastic material is easy to be damaged under the strong impact of external force In short: hydropower transformation is a hidden project, It is particularly important to choose good hydropower materials and experienced hydropower masters, and it is recommended to choose a professional hydropower installation company!
Another thing you should pay attention to is that you must be careful and don't do it casually, after all, this is a major event related to the safety of your own residence. Special attention should be paid to the water circuit renovation to leave drawings, shooting, it is best to indicate the size, because the later bathroom wall installation bathroom pendants, water heaters, cabinets, etc. involve the most perforations, improper treatment is easy to damage the water circuit pipeline.
Cafe is known to be a place for people to relax or talk about things, and the more targeted crowd is mainly young people, so it is necessary to maintain the freshness and vitality of the store when decorating, so that customers can shape the image of the entire coffee shop in their hearts, so what are the precautions for the decoration design of the café, the following is to tell you about the three key points that need to be paid attention to in the decoration of the café, you can refer to it. >>>More
The application for real estate ownership certificate for rural houses mainly depends on the nature of the land of the house, and whether the nature of the land belongs to the state or the collective? Generally speaking, self-built houses in rural areas cannot apply for real estate ownership certificates, and the nature of their land belongs to collective land allocation. >>>More
All the glory and pride in the world comes from Mother. (Gorky). >>>More
Teresa Teng, Fu Ying, Yang Aijin, Wu Yufei, Elaine Ho, Helena Ma, Gloria, Angela Au, Serena Pu >>>More
Tuan, that is, the regiment, [degree official cut], 圜也. From the monophony. - Saying the text and interpreting the words >>>More