Who can provide the construction plan of the steel structure downpipe? Thank you!

Updated on home 2024-03-14
13 answers
  1. Anonymous users2024-02-06

    The spacing of the steel structure column network is generally 5, and the secondary beam spacing is 3m, and the cutting length of the floor bearing plate is, transportation and installation are more difficult, especially with the vertical hoisting of the floor bearing plate by the arc area, it is more difficult to wear the sleeve between the secondary beams from top to bottom, and the normal process of secondary beam welding is disrupted. If the blanking length is controlled to be 3 6m, the problem of not being able to lift between the secondary beams during vertical transportation can be avoided. Special soft slings are used when the floor deck is hoisted.

    Each time the soft sling is lifted, it should be checked for tearing and cutting. The probe should be prevented when the floor deck rests on the steel beam. When laying materials, the operator should wear a safety belt and ensure that it is fixed on the perimeter safety rope while laying.

    1: To meet the requirements of the rapid construction of the main steel structure, it can provide a firm working platform in a short time, and can use multiple floors to lay profiled steel plates, and pour concrete slabs in layers.

    2: In the use stage, the floor bearing plate is used as the tensile steel bar of the concrete floor slab, which also improves the stiffness of the floor slab and saves the amount of steel and concrete.

    3: The embossing on the surface of the profiled plate makes the maximum binding force between the floor deck and the concrete, so that the two form a whole, and the stiffener is matched to make the floor deck system have a high bearing capacity.

    4: In the cantilever condition, the floor deck is only used as a permanent formwork. The length of the cantilever can be determined according to the cross-sectional characteristics of the floor deck. In order to prevent cracking of the cantilever slab, negative reinforcement needs to be matched at the bearing according to the design of the structural engineer.

  2. Anonymous users2024-02-05

    I haven't paid attention to the details,,, I accidentally installed it and I can fall into the water!

  3. Anonymous users2024-02-04

    What pavilion? This requires drawings and on-site information.

  4. Anonymous users2024-02-03

    Is it antique? Why don't you use a wooden pavilion? The effect of wooden is good.

  5. Anonymous users2024-02-02

    Steel structure antique building, innovative construction scheme, there are many completed projects, steel structure antique building design and construction integration, l'7'7'Land'②'o'⑤'Three'II'Jiu'5

  6. Anonymous users2024-02-01

    Construction organization design is right! Yes, but you have to give a reply first.

  7. Anonymous users2024-01-31

    This kind of program is to supplement a procedure only, emphasizing the current situation of the project and the steps of installing the gutter, and finally embellishing some of the content of civilized construction, you search for an installation manual of the gutter, and add some content about your project after applying. , everyone is so busy.

  8. Anonymous users2024-01-30

    Take a look at this, it is the text description of the installation of gutters and downspouts on the company of Docken, Docken ranks quite high in the industry, I hope it will help you.

  9. Anonymous users2024-01-29

    Check the light steel structure workshop atlas or steel structure gutter atlas.

  10. Anonymous users2024-01-28

    How to write the construction plan of the color steel plate gutter.

  11. Anonymous users2024-01-27

    Look at how the drawings are required, if there are no requirements, the lower skin of the nozzle is generally about 100 above the ground. Positive or negative zero is for the whole building or the whole project, and the ground outside the factory wall is not necessarily plus or minus zero, you have to figure it out when you do it. The ground must be the end-use ground.

  12. Anonymous users2024-01-26

    There are no guidelines. As long as the drainage is convenient.

  13. Anonymous users2024-01-25

    It should be an anti-250 on the outdoor floor

Related questions
5 answers2024-03-14

<> Level 1 Qualification Standards:

1. Enterprise assets. >>>More

19 answers2024-03-14

The spacing between steel structure roof tile screws is not more than 450mm. >>>More

5 answers2024-03-14

The company is mainly engaged in mechanical equipment and accessories, production and processing of steel structure parts, is an indispensable industrial accessories in life, belongs to the industrial company, so what conditions do you need to register a steel structure company to do steel structure? Next, I have done the relevant sorting, let's take a look. >>>More

8 answers2024-03-14

Compared with traditional concrete, steel has the characteristics of high strength, high toughness and good ductility, which will bring significant advantages of steel structure buildings in the fields of structural performance, economic performance and environmental performance. In particular, the advantages of environmental protection coincide with the idea of advocating building energy conservation and environmental protection in China. GF believes that with the strong support of policies, the demand for residential steel structures in the construction of green buildings and affordable housing is growing, and the residential steel structure industry is at the point of accumulation. >>>More

10 answers2024-03-14

1. The steel structure components mainly include steel roof trusses, steel grids, steel brackets and steel trusses. >>>More