    Summary of the emergency preparedness and response plan for environmental pollution accidents of the project department: In the event of general environmental (such as excessive noise) pollution at the construction site and dormitory area, the environmental pollution emergency response headquarters of the project department shall organize relevant personnel to deal with and suspend the construction in a timely manner.

    Project Name: Deadline Responsible: Preparer:

    Reviewer: Approver: Date:

    In order to ensure that after the occurrence of major environmental pollution, the project department can quickly, efficiently and orderly carry out the intelligence and aftermath of major environmental pollution sources, take practical and effective measures to control pollution sources in a timely manner, stop the continued occurrence of major environmental pollution sources in a timely manner, and minimize the pollution to the environment.

    1. Organizational structure.

    The project department has set up an emergency response command team for environmental pollution accidents, which is responsible for command and coordination.

    Team Leader: zz Member: zz

    The specific division of labor is as follows:

    1. The task is to understand and grasp the dangerous situation, organize on-site rescue command and external liaison.

    2. The task is to mobilize rescuers, equipment, and machinery to the front line in a timely manner according to the order of the command group.

    3. The task is to maintain the contact between the project department and the industry department (environmental protection department) and other external parties, so that the upper situation is issued, the lower situation is uploaded, and the living guarantee is responsible.

    2. Accident Handling Procedures:

    1. In the event of general environmental (such as excessive noise) pollution at the construction site and dormitory area, the environmental pollution emergency response headquarters of the project department shall organize relevant personnel to deal with and suspend the construction in a timely manner, and formulate corresponding treatment plans and adopt effective measures to ensure that the construction can only be continued when the standard can be met;

    2. When major environmental pollution occurs at the construction site and dormitory area, the project department should organize personnel to rescue in a timely manner, and at the same time take effective measures to cut off the pollution source and stop the subsequent occurrence of pollution in time, and report to the branch in time;

    3. After the occurrence of very serious environmental pollution (such as fire and leakage of a large number of harmful and toxic chemicals), it is necessary to protect the site first, organize the project department personnel to self-rescue and immediately report the preliminary cause, scope and estimated consequences of the incident to the branch. If a person is injured in this serious environmental pollution, he or she should immediately seek help from the local medical and health department (120)**. At the same time, notify the environmental protection department to carry out environmental pollution testing.

    When the branch received the notice, the headquarters personnel rushed to the scene, organized the rescue according to their respective functions, and set up a rescue team;

    4. When the fire breaks out, follow the relevant provisions of the fire protection plan, take practical and effective measures to cut off the fire source as soon as possible, cut off the ignition point, control the fire and extinguish the fire. And do a good job of effective isolation measures on the spot, and the aftermath of the fire. Timely and organized classification and cleaning, removal and transportation, to minimize environmental pollution; When a large number of harmful and toxic chemicals leak out, isolation measures should be taken in time, appropriate protective measures should be taken to clean up and transport them in time, or isolation measures should be taken to entrust the environmental protection department to deal with and test in time, so as to reduce the pollution to the environment to a minimum.

Related questions
13 answers2024-03-07

There is a "Guidelines for the Preparation of Emergency Plans for Work Safety Accidents in Production and Business Operation Units" for reference, which is a box, and the specific content refers to the actual situation of the unit.

18 answers2024-03-07

Yes, report environmental pollution at 12369, and choose to report anonymously to keep the personal information of the whistleblower confidential, and the specific operation method is as follows: >>>More

5 answers2024-03-07

The harm of haze: Winter fog is known as the "winter killer", coupled with pollutants such as industrial exhaust gases, automobile exhaust fumes, dust in the air, bacteria and viruses in the air, attached to water droplets, and these substances will have an impact on the human respiratory tract in people's daily life and travel. May cause acute respiratory infections. >>>More

10 answers2024-03-07

The quantitative method of grade is to convert the grade of each factor evaluation into a numerical quantity in order to obtain a comprehensive evaluation score. >>>More

13 answers2024-03-07

Factories that pollute the environment can be sued. Environmental pollution disputes are subject to no-fault liability, that is, regardless of whether the standard is met, regardless of the subjective state, as long as the infringement is caused, the responsibility must be liable. In addition, the proof of environmental pollution is reversed, and the polluter proves that it is not responsible. >>>More