-
1. Prepare beautiful sewing tools, if you want to do a good job, you must first sharpen your tools.
2 Go to the knowledge section of the official website of Jiuju to view the specific steps of sewing.
3 Start construction.
Sewing knowledge of Aoi.
-
1. Prepare the tools.
Before dealing with the gaps between the tiles, you need to prepare tools to fill the gaps. General construction tools include caulking guns, pliers, paper cutters, waste newspapers, rags, etc.
2. Fill the grout.
Remove the grouting material and discharge the nozzle, take the spatula carefully, clamp the material to the material with pliers, then install the nozzle, and use a paper cutter to cut the nozzle into a 45-degree slope along the thick rib. The width of the spout should be consistent with the discreet width of the slit so that the spout can be completely filled into the slit.
3.Construction method.
Place the sewing agent into the applicator and apply it slowly and evenly to the gaps. After use, use a scraper to scrape off excess glue as soon as possible, and scrape evenly in a timely manner. In general, try not to allow the gap filler to spill out of the gap.
If it flows outside, it needs to be cleaned up in time to avoid the hassle of cleaning up later.
4. Spill treatment.
When the material is scratched, the material will spill. Ignore it. After 24 hours of application of all the sewing agents, use a paper cutter to slowly scrape off the spilled cement slurry. Or use a rag with a little acetone or solvent oil to clearly and unintentionally drip mortar onto the tiles.
-
The joint can beautify and fill the gap between the tiles and the tiles. Do you know the construction method of the sewing agent? Next, let pchouse tell you about the specific construction method of the beauty sewing agent.
1. Throwing glazed bricks, plane transfer application. Use a groover flat-blade screwdriver to clean up the dust and garbage in the gaps of the tiles, this step needs to be moderate, do not use brute force, otherwise there may be a risk of breaking the tiles. Then clean it with a vacuum cleaner, broom or rag.
2. Take a nozzle of sewing agent in your left hand, put the tip down on the discharge port of sewing agent, cover it with a wet towel on your left hand holding the nozzle, and pat the nozzle a few times with your right hand to open the outlet of the sewing agent.
3. Wet the tiles on both sides of the tile gap with a wet towel; However, the inside of the tile crevices must be clean and dry.
4. Screw the discharge nozzle to the discharge port of the sewing agent; Loading the glue gun; Ready to glue.
5. Hit a beautiful sewing agent: for novices, you can play 20cm --- 50cm first, and after gradually becoming proficient, you can play a longer length.
6. Scrape the sewing agent until all the horizontal lines are scraped flat.
7. After about 20 minutes, I feel that all the vertical lines can be made after the sewing agent is solidified.
8. Within half an hour: wipe the residual seam on both sides of the tile gap with a wet towel;
hours later; Normal use.
-
Hello dear, follow the steps below to operate 1, you need to prepare all the tools before construction, there are utility knives, including beauty sewing agent, sewing ball, as well as masking paper, glue guns and so on. Next, the dust and impurities in the cracks of the tiles are removed, here you need to use a brush to remove them, and you need to dry the cracks and surfaces with a towel. Then clean the perimeter and gap of the tile, paste masking paper or punch in the beauty sewing wax, and paste it along the gap to ensure that it is flush.
2. Then install the glue gun and put the sewing agent in the glue gun. The closure is opened, and the first paragraph cannot be used. If the mixing pipe is installed, it needs to be extruded to see if it is uniform.
Then fill the material evenly along the gaps in the tiles without the problem of stalling. After filling, press the seam with a gap ball, and at the same time remove all the excess with a utility knife and wipe off the sewing agent to bring the effect of beautiful seams.
-
The construction method of the sewing agent is as follows:
1. Before playing the beauty joint, be sure to remove the impurities in the tile joints, you can first use a small shovel to remove the impurities in the tile joints, and then clean them with a brush.
2. Install the glue gun, paste the masking paper on both sides of the tile gap, and then unscrew the beauty joint agent and install it into the glue gun, try the effect of the beauty sewing agent, do not use the first 30-40cm beauty sewing agent, and the glue gun and the gap are at a 45° angle to evenly punch the beauty sewing agent into the gap. During construction, the tile gaps must be filled with beauty grout.
3. When playing the beauty joint, every time you hit a distance, you should use a scraper to scrape the tile gap in time.
4. Within half an hour of playing the perfect grout, the residual grout on both sides of the tile gap should be cleaned in time, which can be wiped with a wet towel in case it is not easy to clean later.
5. If there is a hollow tile, the gap can not be polished, otherwise the quilt is easy to fall off.
6. After the construction of the perfect grout, it takes one day to stand on the tiles, and three days before mopping the floor.
7. Tear off the masking paper in time after pressing the sewing, otherwise the masking paper is easy to stick together with the masking agent, and it is easy to pull it up together when the sewing agent is done.
8. Flatten the seams, clean up the residual materials, and play the perfect sewing agent, it is time to press the seams, which should be pressed within 10 minutes in summer and 30 minutes in winter. When pressing the seams, use a scraper to flatten the seams without leaving gaps, and then wipe the overflowing seams with a wet sponge, and then tear off the masking paper. It is time to clean after pressing the powder, but it should be noted that you must wait 2-3 hours in summer to clean and 12 hours in winter.
-
When tiles are laid, if they are sewn, they will look more beautiful. What are the construction methods of Namei sewing agent? PChouse will take you to find out.
1. Clean up the gaps.
Cleaning up the crevices sounds simple, but it's actually quite difficult. The filling in the crevices can be cleaned off with a cleaning cone, and then the dust inside can be removed with a brush or vacuum cleaner. But both sides of the gap must be cleaned, there is a certain depth and width, generally speaking, the width of the gap needs to be more than 1mm, and the depth is about 3mm.
Second, glue. The bottled sewing agent needs to be glued with the help of a glue gun, which is loaded on the glue gun, squeezed the glue gun hard, and then moved the position at a uniform speed to make the sewing evenly into the gap. However, it should be noted here that after pressing the hose on each group of newly opened sewing agents, the glue of about 40cm from the front end should be discarded.
Because these are not evenly mixed, they will not cure, even if they are driven into the gaps. And before gluing, when encountering tiles with rough surfaces, it is necessary to paste masking paper in advance.
3. Shovel glue. There are two ways to shovel glue, one is to paste the tile with masking paper, you need to tear off the masking paper within 15 minutes after pressing the seam, and you must not wait for the masking agent to cure. One is a tile with a smooth surface, or a tile with a sewing wax, which needs to wait for the sewing agent to fully cure before shoveling.
Use a spatula to scoop up the sewing agent, and then tear it off by hand.
-
1. Tools are required: glue gun, scraper, sponge, masking paper, utility knife, brush, etc.
2. Choose the color of the sewing agent: You can decide the color of the sewing agent according to your own preferences, or you can let a professional sewing master recommend it. Many young people like the beauty of the sewing agent Shilu color and the color of the tile color gap is larger, such as:
White, silver, pearlescent, gold and other colors with strong compatibility.
3. The operation steps of the sewing agent: remove the nozzle of the sewing agent, use pliers to clamp the material head, and then install the discharging nozzle, use paper cutting to cut the nozzle into a 45-degree angle, the width of the discharging nozzle should be as large as the width of the gap, and the discharging nozzle can enter the gap is the best.
4. Construction method: Load the beauty sewing with the return attack agent into the glue gun, gently apply the material in the gap, and use the scraper to scrape it flat after coating until the surface is smooth.
1. What is tile grout
Tile grout is composed of high-tech new polymers and high-grade pigments, which are finely formulated by high-tech new polymer materials + high-grade pigments and special additives. Tile grout is a high-end product for gap decoration, suitable for tile, mosaic and other gap beautification, kitchen and bathroom top decoration. The cost of one-component sewing agent is relatively low, and the relative cost of two-component is a little higher. >>>More
How to shovel off the sewing agent is as follows:1. If the type of sewing agent is different, the method of eradication will be different. Among them, the one-component beauty joint agent is water-based, and the adhesion is generally not strong, so it will be easier to shovel off, as long as the tile gap position is scraped continuously with a utility knife, it can generally be easily shoveled off. >>>More
1.White vinegar: Soak the clothes with the sewing agent in water, add an appropriate amount of white vinegar to the water, and scrub the clothes repeatedly. >>>More
Sewing craftsmen real porcelain glue, Zhuo Gao real porcelain glue, royal craftsmen, sewing Meijia real porcelain glue, color cow, mandala real porcelain glue, Yijia real porcelain glue, Fantoni real porcelain glue These brands are all good. >>>More
1. Sewing craftsman sewing agent: sewing craftsman using imported raw materials production, engaged in the sewing industry for several years, rich experience, good customer response, through tireless pursuit of product quality, adhere to the principle of quality first, has a wide range of customers at home and abroad, is worthy of everyone's trust of the product. >>>More