Ask for supervision planning, supervision rules, supervision work summary template

Updated on educate 2024-03-28
1 answers
  1. Anonymous users2024-02-07

    1. Do a good job of pre-control and strictly control the start of work.

    In the whole supervision process, we adhere to the pre-control and active control, according to the contract and design documents to prepare the supervision plan, the development of specific supervision procedures, clear work content, actors, acceptance standards and work requirements.

    Before the start of the project, according to the requirements of the supervision specifications, we reviewed the qualifications of the construction unit, on-site quality management, technical management organization, personnel, system and the qualifications and employment certificates of special types of operators. According to the construction organization design plan submitted by the contractor, the construction organization design was reviewed, and the "supervision plan" was prepared accordingly to conduct an on-site review of the measurement, positioning and pay-off of the project, including the axis size and horizontal elevation, which further clarified the supervision objectives and requirements, and created conditions for the smooth development of the supervision work.

    2. Strictly control the entry of raw materials and semi-finished products.

    All raw materials and semi-finished products must first be inspected in writing, that is, the inspection certificate, permit, warranty policy, etc., and the appearance inspection shall be carried out after meeting the requirements. The construction materials certificate and quality insurance policy of this project are complete, and the main building structural materials such as steel, cement, stone, and yellow sand have been re-inspected after entering the site, all of which meet the qualified requirements.

    3. Strict process inspection and strengthen process control.

    In the process of construction supervision, strengthen the means of inspection of the construction process, so that the first inspection after the construction, the previous process is not accepted shall not enter the construction of the next process, the acceptance of the concealed project Our project supervision department attaches particular importance to the on-site supervision of the key and key parts, such as cast-in-place reinforced concrete, beams, plates, ladders, roofs, etc. In the construction, we attach great importance to and strictly control the construction quality of reinforced concrete engineering, especially the floor engineering, in the whole construction process, we focus on the quality of steel binding production, the pouring thickness of the plate, the mix ratio of concrete, slump and maintenance, etc., to ensure the construction quality of concrete. In the construction of the wall, we grasped the following keys:

    One is the wet water of the bricks; the second is the correct mixing of mortar; The third is the quality of masonry, in which the fullness, cohesion, vertical flatness of the mortar and the setting of tie ribs are supervised as the key.

    In the process of supervision, a total of 9 supervision work contact sheets, 33 supervision engineer notices, 3 safety hazard rectification notices, in the process of project implementation for project quality, cost, progress, safety, contract management and other matters held weekly site meetings, and according to the actual situation of the project held 12 times.

Related questions
12 answers2024-03-28

Supervising Engineer Exam Application Guide.

In August 1996, the Ministry of Construction and the Ministry of Personnel issued the Notice of the Ministry of Construction and the Ministry of Personnel on the National Supervision Engineer Qualification Examination (Jian Jian 1996 No. 462), and from 1997, the National Supervision Engineer Qualification Examination was officially held. The examination work is jointly responsible for the Ministry of Construction and the Ministry of Personnel, and the daily work is entrusted to the Construction Supervision Association of the Ministry of Construction, and the specific examination work is responsible for the Personnel Examination Center of the Ministry of Personnel. >>>More

9 answers2024-03-28

Do you want to apply for the professional supervision engineer or the national registered supervision engineer? Then you have to make it clear what type and what major you are applying for? The exam is held once a year, and the exam is generally scheduled in mid-May. >>>More

15 answers2024-03-28

Responsibilities of a professional supervising engineer.

11 answers2024-03-28

The difference between consulting supervisors and supervising engineers. >>>More

12 answers2024-03-28

The supervision work in the construction stage is, simply put, the main work content of "four controls", "two pipes" and "one coordination". >>>More