What information does the general contractor need to provide to the supervisor when entering the sit

Updated on society 2024-03-10
7 answers
  1. Anonymous users2024-02-06

    Enterprise qualifications, personnel qualifications,Construction organization design, the general construction schedule and various special projectsConstruction plan, safe and civilized construction plan.

    1. Proof of validity of the general contractor: notice of winning the bid.

    Construction contracts, construction permits for construction projects.

    2. Project Department.

    etc.), special types of work in the project department.

    Personnel (electricians, welders, etc.).

    4. Construction plan.

    5. Relevant application materials before the start of construction.

    6. Some requirements of local regulatory authorities.

    Range. The general contracting services of this project mainly include the following work: unified management and coordination of the entire project construction, collection, review, sorting and reporting of project delivery data, etc., and the overall project declaration of China Construction Engineering Luban Award.

    The data collation, data reporting, etc., as well as the handling of relevant procedures, until the end of the evaluation of the China Construction Engineering Luban Award.

    The general contractor manages the subcontractor according to the contract, controls the schedule and project quality of the subcontractor in accordance with the overall schedule of the project and the overall requirements of the project quality, incorporates the schedule and project quality of each subcontractor into the overall schedule and project quality control, and manages, is responsible for and uniformly deploys the construction plan, construction quality, civilized construction and other related matters of each subcontractor, and completes the construction of the project according to the requirements of the owner.

    The above content reference: Encyclopedia - General Contractor.

  2. Anonymous users2024-02-05

    1. Construction organization design;

    2. Special programs;

    a. Deep foundation pit excavation scheme (greater than or equal to 4m should be certified by experts);

    b. Temporary power scheme at the construction site;

    c. Load-bearing formwork support scheme (span greater than or equal to 8m should be certified by experts);

    d. Special plan for formwork construction;

    e. Special plan for the construction of derrick and freight elevators;

    f. Special plan for tower cranes;

    g. Special scheme for exterior wall scaffolding;

    h. New product and new process construction plan (building energy-saving construction plan);

    i. The special construction plan that the owner or project director thinks should be prepared;

    j. Emergency rescue plan.

    3. Qualification of the construction unit (business license. qualification certificate), management personnel for review (safety production license, pay attention to the review of three types of personnel);

    4. Special operations personnel submit for review (such as scaffolding workers, welders, electricians, tower crane command drivers for review, pay attention to the review time.) );

    5. Building energy conservation registration form;

    6. Minutes of drawing review.

    7. Commencement report (with commencement application form);

    8. Material review (such as steel bar, cement, sand, stone, concrete brick certificate, test report);

    9. Equipment for review;

    a. Conventional machinery and equipment for examination (certificate);

    Such as electric welding machine, steel bar cutting machine, steel bar bending machine, distribution box, theodolite, level, etc.;

    b. Tower cranes, derricks, and freight elevators are submitted for review;

    Production license, product quality certificate, design documents, safety and maintenance instructions, supervision and inspection certificates, sales vouchers or lease contracts, professional qualification certificates of installation and demolition units, drivers, commanders and certificates, installation contracts, jacking or lowering acceptance records, and use handover records.

  3. Anonymous users2024-02-04

    1. Business license, qualification certificate, safety production license and other enterprise qualification documents of the general contractor.

    2. Proof of validity of the general contractor: notice of winning the bid, construction contract, construction permit.

    5. The name of the subcontracted (branch) project and the name of the subcontractor and related qualification documents.

    6. Construction organization design, emergency rescue plan, construction plan.

    7. All kinds of measuring instruments used in construction and verification certificates within the validity period.

    6. Relevant application materials before the start of construction.

    6. Some requirements of local regulatory authorities.

  4. Anonymous users2024-02-03

    Qualification certificate, business license and registration number of the construction unit (copy);

    National Enterprise Rating Certificate and Credit Rating Certificate (copy); Construction enterprise safety qualification approval certificate (copy);

    Certificate of enterprise legal person ** (copy); quality system certification;

    Laboratory qualification certificate provided by the construction unit (copy); Late response to the notification (copy) code of the project budget item;

    Engineering Project Manager, Chief Engineer of Lifting Width, Manager Qualification Certificate, Employment Certificate (copy);

    Certificate of employment of special workers (photocopy); Special operations include: electrical work, boiler furnace, pressure vessel operation, crane construction, blasting operation, metal welding (gas cutting) operation, motor vehicle driving, motor boat driving, steam turbine operation, building overheading, coal mine gas detection, etc.

    Organizational design of the construction of the project (construction plan) with a complete self-inspection procedure, visas for heads of departments, targeted and special measures (such as winter and rainy season construction).

  5. Anonymous users2024-02-02

    After the materials of the construction unit enter the site, the supervision shall inspect and accept the materials, accessories and equipment entering the site

    After the materials enter the site, the construction party should promptly report the materials, accessories and equipment stamped with the red seal of the sales unit to the project supervision agency, involving safety, the use of functional materials, should also have the supervision of on-site witnessing, the construction party sampling, sent to the inspection agency with the corresponding qualifications for testing, after passing the retest report will be reported to the project supervision agency.

    After receiving the relevant information, the supervisor shall enter the site for acceptance, and sign and seal the "Materials, Accessories and Equipment Inspection Form" after passing the inspection, so that the construction party can use the batch of materials, accessories and equipment for the project.

    Regarding the number of copies, three copies are generally reported, and the supervision department keeps one copy, and Party A generally does not want it, because in the end, there must be a complete set of completion information for them, and the rest will be returned to the construction unit.

    Measures for the Management of Construction Project Quality".

    Article 20 Before the start of the project, the construction unit must go through the relevant project quality supervision procedures; Organize the design and construction units to carefully carry out the design disclosure and drawing review; The quality of the project shall be inspected in accordance with the current national laws and regulations, technical standards and contract provisions on engineering construction; After the completion of the project, the relevant departments should be organized to carry out the completion acceptance in a timely manner.

    Article 21 The quality of equipment and other products stipulated in the project contract must conform to the requirements of the relevant laws, regulations and technical standards in force of the state.

  6. Anonymous users2024-02-01

    Summary. Hello dear, the following information directory is relatively complete. In fact, it is not necessarily so prescriptive.

    1, construction site construction lifting machinery installation dismantling application form, 2, construction site construction lifting machinery acceptance checklist, 3, construction unit special safety construction plan and engineering project emergency rescue plan audit form, 4, included in 1, there are, demolition plan, emergency plan, mechanical performance test report, self-inspection certificate, demolition unit qualification, demolition personnel and operator certificate, demolition unit qualification, group tower operation plan, 5, included in 2, installation notification procedures 6, Lifting capacity of more than 300 kN and above, including equipment installation engineering, height of 200 meters and above within the lifting equipment removal, to expert demonstration, 7, need to report to the supervision for the record, tower crane foundation acceptance record form, tower crane leasing, use, installation safety management agreement hope to help you.

    What information do construction equipment need to report to the supervisor when entering the site? What's included?

    Hello dear, the following information directory is relatively complete. In fact, it is not necessarily so prescriptive. 1, the construction site construction hoisting machinery installation dismantling application form, 2, construction site construction hoisting machinery acceptance checklist, 3, the construction unit special safety construction plan and engineering project emergency rescue plan audit form, 4, included in 1, there are, demolition plan, emergency plan, mechanical performance test report, self-inspection certificate, demolition unit qualification, demolition personnel and operator certificate, safety chain balance dismantling unit qualification, group tower operation plan, 5, included in 2, installation notification procedures 6, Lifting socks more than 300 kN and above of which the equipment installation project, height of 200 meters and above within the lifting equipment demolition, to expert demonstration, 7, need to report to the supervision of the stimulation for the record, tower crane foundation acceptance record form, tower crane leasing, use, installation safety management agreement hope to help you.

    If my answer is helpful to you, please give a thumbs up (comment in the lower left corner), look forward to your like, your work is very important to me, and your support is also the dynamic and vertical momentum of my progress. Finally, I wish you good health and a good mood!

  7. Anonymous users2024-01-31

    Summary. Dear, hello, I am happy to answer for you: the construction unit required by the supervision when he first entered the site: qualifications, project team composition and post certificates (including five members), construction organization design, construction contract, construction budget, construction permit, and construction application report.

    To yourself: the composition of the supervision team and the post certificate, the supervision plan, the supervision implementation rules, the side station plan, the review of the application for the start of construction, and the preparation of the first regular site meeting.

    What information will the supervisor ask the construction unit to provide when he first enters the site? And what materials do you need to prepare? Please give me advice.

    Dear, hello, I am happy to answer for you: the supervision of the construction unit when you first enter the site: qualifications, project team composition and post certificate (Bao Da stares at the five members), construction organization design, construction contract, construction budget, construction permit, rolling worker application report to yourself:

    The composition of the supervision team and the post certificate, the supervision plan, the supervision implementation rules, the side station plan, the review of the application for the start of construction, and the preparation of the first regular site meeting.

    The information to be done by the supervisor is: supervision log, side station supervision record, supervision monthly report, meeting minutes, etc. 1, unit project commencement report (the first supervision meeting contains records) all kinds of original meeting records 2, building materials review form 3, process inspection form 4, concrete pouring application form (witness sampling record) 5, supervision of the project stove loss division notice (and the construction unit reply) 6, supervision log 7, supervision side station record 8, hidden parts of the image data.

Related questions
8 answers2024-03-10

For the CFA exam, you need to enter the venue one hour in advance to check the admission ticket, ID card and calculator. >>>More

4 answers2024-03-10

The basic process involved in the fictitious purchase of equity key is as follows: >>>More

15 answers2024-03-10

Fire retardant coatings. After entering the site, samples need to be taken and sent for inspection. >>>More

39 answers2024-03-10

What bag does the Queen of England carry? Those who are slightly familiar with the queen should be able to find that every time the queen appears, she basically carries a black bag, which has been the same for decades. However, the Queen's bag is very niche, neither Chanel nor Hermès, and even a star has never carried it. >>>More

8 answers2024-03-10

Bao Wenjing is a girl with delicate feelings, and she can't bear to see her mother so tired.