It depends on the location of your computer room, as well as the surrounding community.
-
Summary. Hello, the computer room construction plan, the computer room business, the construction of the machine room includes: 1. The decoration of the computer room: antistatic floor laying, microporous ceiling and computer room wall panel decoration, ceiling and ground dustproof treatment, fireproof doors and windows, etc.; 2. Power supply and distribution system:
power supply system, power distribution system, lighting, emergency lighting, UPS power supply; 3. Air conditioning fresh air system: precision air conditioning and fresh air ventilation system in the computer room; 4. Fire alarm system: fire alarm, portable fire extinguisher; 5. Anti-theft alarm system:
infrared alarm system; 6. Lightning protection and grounding system: power supply lightning protection and surge protection, equipotential connection, electrostatic discharge, grounding system; 7. Security system: access control, ** 8, computer room power environment monitoring system:
computer room environmental monitoring system; Overall requirements: reasonable layout, bright color, wide field of vision, fireproof, moisture-proof, dust-proof, heat insulation, antistatic, anti-corrosion, easy to clean, beautiful and durable and other performance characteristics, and the material is light, the structure is firm, not easy to deform, easy to disassemble and assemble, easy to connect, maintain, and decorate the pipeline under the floor and in the ceiling. The above is mine, I hope it can help you and I wish you a happy life.
Hello, the construction plan of the computer room, the construction of the computer room business, the construction of the machine room, including 1. The decoration of the computer room: antistatic floor laying, the decoration of the microporous ceiling and the wall panel of the computer room, the dustproof treatment of the ceiling and the ground, the fire doors and windows, etc.; 2. Power supply and distribution system: power supply system, power distribution system, lighting, emergency lighting, UPS power supply; 3. Air conditioning fresh air system:
precision air conditioning and fresh air ventilation system in the computer room; 4. Fire alarm system: fire alarm, portable fire extinguisher; 5. Anti-theft alarm system: infrared alarm system; 6. Lightning protection and grounding system:
Power supply lightning protection and surge protection, equipotential connection, electrostatic discharge, grounding system; 7. Security system: access control, 8. Power environment monitoring system of computer room: environmental monitoring system of computer room; General Requirements:
The layout is reasonable, the color is bright, the field of vision is wide, it has the performance characteristics of fireproof, moisture-proof, dust-proof, heat insulation, antistatic, anti-corrosion, easy to clean, beautiful and durable, and the material is light, the structure is firm, it is not easy to deform, it is easy to disassemble and assemble, and it is convenient for the connection and maintenance of pipelines under the floor and ceiling, and the decoration of the computer room. The above is mine, I hope it can help you and I wish you a happy life.
Computer room business. Decoration Engineering, Electronic Engineering, Computer Network Engineering. (Projects subject to approval in accordance with the law can only be carried out after approval by relevant departments) The business scope of the company is not the development, design, installation and sales of communication cabinets, power cabinets, integrated communication rooms, power rooms, communication cabins, and hand-potato power cabins, as well as the engineering, communication and power supporting facilities.
-
Data center construction must consider data information: <
1. There are four points that must be examined in the construction of data centers.
One is the availability and timeliness of data; the second is the scale of the data center; the third is the power density of the cabinet (kW cabinet); Fourth, meteorological conditions, networks, and water and electricity resources. The choice of any data center system design solution must be based on the examination of these contents.
2. Different industries have very different design requirements for data center construction.
In the case of the financial industry and the military system, all problems have to give way to availability and timeliness; In BAT or telecom rooms, the attention to energy saving and investment costs is much higher; In the supercomputing system, more attention is paid to the high power density of the cabinet and the economics of the operation of the computer room. In this way, the design and planning of future data centers should meet diversified technical needs, not a single model, which puts forward clear directional requirements for designers.
3. Based on this demand, the construction of future data centers can be designed and planned from four dimensions, including: reliability, energy saving, economy, and maintainability. He believes that the concepts of energy conservation and green environmental protection can not be confused, and from the actual cases he observes, it has been found that the construction of data centers in some areas has been "irreconcilable" contradictions between energy conservation and green environmental protection, such as:
The use of water resources in the northwest region, which is partially water-scarce.
4. Evaluate the key indicators of data center availability.
It includes whether there is a potential fault induced by the power supply system power outage, whether there is a fault hazard induced by the "failure" of the air conditioning system, whether there is a fault hazard induced by the "detection failure" of the battery pack, whether there is a fault hazard induced by the output short circuit and "the input main switch tripped" by mistake, whether there is a fault hazard of "input main switch tripping by mistake" due to the "improper design" of lightning protection, and whether there is a "power outage" due to the input power grid or the fault hazard of "damage" of IGBT rectifier UPS caused by the switching operation of the main ATS switch of the power supply system, whether there is a fault hazard caused by the capacitive load and step load of the generator, and whether there is a fault hazard caused by the damage or shortening of the life of IT equipment caused by "large ground circulation", "high ground voltage" and "corrosive gas".
-
First consider the requirements, such as how many applications, estimate how many servers are needed, what type of servers are used, how many server cabinets are needed, how many network cabinets are needed, so as to estimate the area of the computer room, the total degree of comprehensive computer room, evaluate the level of the computer room, put forward the power distribution demand, estimate the heat generation, put forward the air conditioning demand, and the rest consider the following system construction:
Focus on several constructions:
1. Power distribution. 2. Air conditioning.
3. Environmental monitoring of the computer room.
4. Fresh air. 5. Integrated wiring.
6. Fire fighting. 7. Monitoring.
It is also necessary to consider other requirements such as the overall waterproofing and load-bearing of the computer room building.
Based on this, the design scheme of the computer room is carried out.
-
When making a computer room construction plan, you need to consider the structure, system, service, management and the interconnection between them, and then achieve the goals including cost, convenience and safety, the foundation of the computer room construction first needs a modular, flexible, highly reliable cabling network, which can connect voice, data, images and various equipment and devices for control and management. Schneider Enterprises is using the characteristics of this cabling network to meet the needs of changing users, while reducing the cost of construction units as much as possible.
-
It is better to build a small computer room management server by yourself than to directly host it in a professional IDC computer room.
-
The overall construction of the computer room generally includes the following aspects: building decoration, electrical system, air conditioning fresh air system, weak current system, environmental equipment monitoring system, fire protection system, automatic alarm system, shielding system, integrated wiring system, cabinet system, server system, etc.
-
In view of the problems faced by customers in the construction of the computer room, Times Feiyang realizes that the computer room project is the infrastructure for the reliable operation of computers, networks and communication systems, and it is necessary to continuously introduce new and advanced design concepts and design ideas. With its professional knowledge in the field of power supply and air conditioning products, many years of practical experience in the field of computer room, and deep understanding of user IT applications, we have launched the overall construction solution of computer room to the majority of users.
-
First consider the requirements, such as how many applications, estimate how many servers are needed, what type of service cavity cloth belt server is used, how many server cabinets are needed, how many network cabinets are needed, so as to estimate the area of the computer room, the total degree of comprehensive computer room, evaluate the level of the computer room, put forward the power distribution demand, estimate the heat generation, put forward the air conditioning demand, and consider the following system construction for the rest:
Focus on several constructions:
1. Power distribution. 2. Air conditioning.
3. Environmental monitoring of the computer room.
4. Fresh air. 5. Integrated wiring.
6. Fire fighting. 7. Monitoring.
It is also necessary to consider other requirements such as the overall waterproofing and load-bearing of the computer room building.
Based on this, the design scheme of the computer room is carried out. Cons front.
Company. Article 35 stipulates that shareholders shall receive dividends in accordance with the proportion of their paid-in capital contributions; When the company adds new capital, shareholders have the right to subscribe for capital contributions in accordance with the proportion of paid-in capital contributions; However, all shareholders agree not to distribute dividends in accordance with the proportion of capital contribution or do not subscribe for capital contribution in priority according to the proportion of capital contribution. Article 43 of the Company Law also stipulates that the shareholders' meeting shall exercise their voting rights in accordance with the proportion of their capital contribution; However, the Articles of Association. >>>More
The computer room environment has an important impact on the normal operation of the server. Therefore, the first part of server maintenance and maintenance is to do a good job in the construction of the computer room environment. The computer room should ensure sufficient space for the installation and configuration of server related equipment, and the partition and floor of the computer room should be treated with details such as anti-static. >>>More
The class time is small, the renewal cycle is short, the class fee can also be slightly higher, the class time is more, the renewal cycle is long, it is not flexible, and the class fee is too high. More than half a year of study is the best.
There may be a bias in self-awareness, if you want to understand what career is suitable for, it belongs to career positioning, as mentioned in the recommended answer, do an objective psychological test such as the MBTI mentioned above, and then get a Holland Occupational Aptitude Test Scale, and then look at the assessment results, you can eliminate subjective bias and recognize yourself more objectively. In fact, you said so much, and it is more of a social and career-oriented characteristic. >>>More
The first point is to recognize yourself: When making career plans in Chachun, there are often many people who lose themselves and forget. >>>More