Paving floor tiles to put the horizontal line, you can use a horizontal pipe or a cross base, the purpose is to keep the finished surface of the tile horizontal, and there is also a kind of formwork pay-off, because according to the specification requirements of the smallest tile block can not be less than 1 3 of the width of the tile, if you go along the narrow strip may appear unsightly;
The floor tile paving of the decoration is in accordance with the order of the living room and then the room, which is from the outside to the inside, from the door to the inside, from the living room to each room, so that the overall effect is good.
It is also a common technique to pave the floor tiles from the room net living room, from the inside out, which is mainly to effectively prevent stepping on the freshly pasted floor tiles and prevent the floor tile adhesive layer from hollowing.
-
There are two kinds of laying floor tiles, one is to put the horizontal line, you can use a horizontal pipe or a cross base, the purpose is to keep the finished surface of the tile horizontal, and there is also a kind of layout formwork pay-off, because according to the specification requirements of the smallest tile block can not be less than the width of the tile 1 3, if you go along the narrow strip may not be beautiful, if the geometric size of the room is not good (the yin and yang angle is not vertical, may be caused by the wall or plastering), there may be a "mouse tail", the narrow strip is also counted, but also the size of the head, it will be fatal. It is best to be assisted by experienced professionals to assist you, not three or two sentences can be explained, the specific situation is analyzed, the layout of the mold according to local conditions, the wall and floor tiles of the bathroom and kitchen are best to climb the wall if there are conditions, the ground joints, the wall joints are smooth, beautiful and generous.
-
<>1. Lay from the living room to the room: You can follow the order of the living room first and then the room, this order is from the outside to the inside, and then each room is leveled according to the living room, so that the overall effect will be better. 2. Lay from the mold room to the living room
It is also a common construction method to lay from the room to the living room, from the inside to the outside, which can prevent stepping on the floor tiles that have just been pasted during construction, and avoid causing problems such as floor tiles warping and hollowing. 3. Laying separately: the living room and the room are laid separately at the same time, which can save floor tiles and reduce the number of cutting.
-
As we all know, when decorating the house, it must be carried out in accordance with the decoration order, so that the decoration effect will be more ideal. Floor tiles are an indispensable process in renovation, so where to start laying the first floor tile? What should be paid attention to when laying floor tiles?
Most people pave floor tiles from the living room first, and then to the room, this is in the order of construction from the outside to the inside, the first floor tile is from the entrance door to the beginning of the paving, and then extend to the living room. After the living room is paved, each room will be paved, so that the overall effect will be better.
Paving tiles should pay attention to what the mountain.
1. Before paving the floor tiles, the base should be cleaned, and if there is an uneven place, it needs to be chiseled and repaired first. It is necessary to ensure that the base layer is cleaned, and there can be no mortar and oil stains. In addition, the floor should be flooded with water before paving the tiles, and when the tiles are paved, they need to be placed according to the standard, and the standard blocks should be placed at the intersection of the crosshairs for diagonal installation.
2. When laying floor tiles, remember that each line needs to be hung with wires, and the ground grip imitation bricks need to be sprinkled and maintained after 24 hours of paving. Before paving, it is necessary to try to spell, number, dialogue and color matching the floor tiles, so that the paved floor tile color will not be confused. In addition, the fiber bricks in the lot need to be soaked in water and then dried in the shade before paving, so that it will not affect its coagulation and hardening, and there will be no shelling, hollowing and other phenomena.
3. When laying floor tiles, pay attention to reserve a certain gap, and the size of the gap required for different bricks is not the same. Usually, the gap between wall tiles is about one millimeter to 1.5 millimeters, and the floor tiles are generally about 1.5 millimeters to two millimeters. In addition, you can't walk around the floor tiles for two or three days after they are just laid, so as not to affect the paving effect of the floor tiles.
-
There are two types: dry and wet:
1. Wet paving: The bricks should be soaked in water before paving, and should be soaked every other day, and dried until there are no water stains on the surface before paving. When paving, the cement floor should be watered and moistened, and the cement mortar (mixed with 107 glue 20%) should be smeared on the back of the brick, and the joints must be tight, and immediately adjusted, and each line of paving will be checked once in the future.
Bathrooms, kitchens, balconies, and floors are paved with floor tiles, which must be inclined to the floor drain, and the inclination should be controlled at 2% (3mm).
Attention should be paid to the problem of brick arrangement when pasting the corners: the width of the non-whole brick should not be less than 1 3 of the whole brick, and the non-whole brick should be used in an inconspicuous place or a yin corner, and the whole brick should be lined up at the sunny corner, and the whole brick should be used on both sides of the window.
2. Dry paving: sealing glue on the original civil construction ground, and spreading it on the original civil cement in a semi-dry state with cement sand adjustment to a semi-dry state (grasping it into a mass by hand), and integrating it with the original civil construction cement. Then lay the bricks flat on the semi-dry cement and beat them with a sponge to squeeze out the bubbles in the cement.
The wet cement on the back of the brick is laid on the dry cement, and the cement solidifies within 2 hours, so that the brick is integrated with the ground and will not be hollow.
There are several main parts for the acceptance of bricklayers: first, the error within two meters shall not be greater than 2mm, the brick joints should be neat, uniform size, no hollow drums, no loosening, and acceptance shall be carried out with a two-meter-long ruler or ruler. Secondly, you can use a small hammer to gently tap on the ground or wall, and there must be no empty drum sound.
Finally, it should be noted that the slope of the floor tile paving with drainage requirements should meet the drainage requirements, and the joint with the floor drain should be tight and firm.
Hello, a piece of white appears on the back, and this situation generally has to consider several situations: >>>More
That part of it? Is it still on the cheeks?
Don't wash your head too often, dandruff is a fungal infection. It is recommended that you try it with Zele Wash, and when you are done, choose the right shampoo.
There are two stones deep in the mountains, and the first stone says to the second stone: "Go through the hardships and bumps of the road and the bumps and bumps of the world, and you can fight for it, and you will not come to this world in vain." ” >>>More
It's very simple, in fact, the younger brother's 2 yuan is 9 yuan for 3 people, it should be 3 * 9-2 = 25, not plus, then 25 is the boss's room rate.