Four links and one level, that is, the construction site water, electricity, road, and communication should be connected; One flat is that the construction site should be leveled.
Others are: three links and one level, referring to water, electricity, roads, and the site is level;
Five links and one level, water, electricity, roads, gas, communications, the site is level;
Seven links and one level, water supply, drainage, roads, electricity, communications, heating, gas supply and site leveling.
These are the pre-development processes of an engineering.
-
What does it mean to say that the building is open and flat? 1. Sitong refers to the construction site.
It is necessary to have access to water, electricity, roads, and communications;
2. One level means that the construction site should be leveled.
Engineering construction refers to the new creation, reconstruction and transformation of new projects such as engineering construction projects, route pipelines, and equipment projects for the installation of lead bridges, engineering building decoration and decoration projects, and is the basic production process of generating fixed capital and other related capital construction.
Collectively referred to at work.
1) Engineering construction projects include mining, railway lines, tunnel construction, highway bridges, river embankments, power plants, ports, airports, excitation sports venues, houses (such as industrial plants, theaters, hotels, shops, colleges and houses) and other projects.
2) Route pipeline and installation equipment engineering includes power engineering, communication network, natural gas, water supply and drainage, drainage pipeline, heating and other pipeline system software and various industrial equipment, equipment installation engineering.
3) Engineering building decoration project refers to the application of engineering building decoration and decoration raw materials to carry out decoration solutions on the surface and interior of the building in order to make the house building, the interior and exterior indoor space of the building achieve certain ecological environment regulations.
4) Other engineering construction work includes the decision-making theme activities of the construction unit and the competent authority, as well as its land acquisition, engineering survey, engineering supervision, etc. This kind of work is an indispensable content of engineering construction.
Extended Materials. Criteria that must be present for the start of a new project:
The builder has been clarified;
The upfront design and total budget have already been approved;
Construction project assets (including own funds.
It has been implemented and recognized by the audit department;
The main construction enterprise has already been selected by the bidding committee;
The engineering drawings of the main project can be completed for at least three months.
of musts; The construction site of the project has completed the "four links and one level" (that is, the power supply system, power supply, road surface, communication, and site leveling.
The project supervision company has already been selected by the bidding committee.
The above is all I have introduced in detail, I hope it will help you after reading it and solve the problem as soon as possible.
-
Four links and one level, that is, the construction site water, electricity, road, and communication should be connected; One flat is that the construction site should be leveled.
-
It means that water and electricity should be supplied, relevant roads should be paved, communication equipment should be good, and the site should be kept very flat.
-
They refer to the convenient transportation, convenient water, convenient circuits, and the receipt of the state file is also very fast, and there is also a relatively flat site, which is the architectural saying.
-
Four links and one level refers to the basic conditions that the construction site should have before the start of construction, four links refer to water, electricity, access and communication, and one level refers to the level of the site.
-
1. Check all sockets for house inspection: friends who don't have a pen can take a charger and a three-phase connector of Kaihui. The charger can check the two-phase socket, and the three-phase connector can check the three-phase socket.
2. Check all windows for house inspection: Wu state glass can not have scars, every piece we buy is a commodity, and we must check it carefully, otherwise it is ourselves who will suffer. Don't think that it doesn't matter if there is a small scar on such a large piece of glass, think about if you are buying a mirror, you definitely don't want a mirror with a scar, check the window screen, many of the screens on the screen are broken, or there are big scratches on it.
Inspect the house to check whether the window touches the wall when the window is opened, otherwise the wall is easy to destroy.
-
Legal analysis: Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department. In accordance with the authority and procedures specified in the construction project approved by the commencement report, no longer receive the code worker permit.
The construction permit requires the owner to complete the work of "four links and one level in the project".
Legal basis: Article 3 of the Construction Law of the People's Republic of China shall ensure the quality and safety of construction projects and meet the national safety standards for construction projects. Article 7 Before the commencement of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.
Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.
-
1. Four links refer to water, roads, electricity calls, and smooth communications; Yiping refers to the level of the site.
2. Four links and one level is a prerequisite for the construction of the project, and the obstacles on the construction site have been removed, so that the site is level, so that it is convenient for us to measure, layout, construction and so on in the later stage.
3. Others: three links and one level, referring to water, electricity, roads, and flat sites; Five links and one level, water, electricity, roads, gas, communications, the site is level; Seven links and one level, water supply, drainage, roads, electricity, communications, heating, gas supply and site leveling.
Meaning: All the Dharma that arises from causes and conditions is like a dream, like a shadow in a bubble, as unpredictable and unpredictable as a mist. At the same time, it changes as quickly as lightning. >>>More
What is a 4S store?
4S store is a car franchise model with "four-in-one" as the core, including vehicle sales (sale), spare parts (sparepart), after-sales service (service), information feedback (survey), etc. >>>More
Embattled means: a metaphor for being trapped in an embarrassing situation of being surrounded by enemies on all sides, isolated and helpless. >>>More
"Rounding" means rounding the digits after the decimal point, i.e. rounding off if the first digit of the rounded part is less than five; If it is greater than or equal to five, the last digit of the reserved part is added to 1. >>>More
Collateral blood relatives refer to relatives who are not direct blood relatives but are related to them by blood. The so-called collateral blood relatives within three generations refer to relatives who trace themselves back to the same blood source, and then count down three generations. For example, you are collateral blood relatives with your siblings and your aunts and uncles. >>>More