Is this how the interior decoration completion acceptance report is written?

Updated on society 2024-03-26
2 answers
  1. Anonymous users2024-02-07

    Project acceptance inspection personnel: client: supervisors:

    This project has two bedrooms, two living rooms and one bathroom, with a construction area of 37 square meters and a floor height of meters. Acceptance conclusion: 1. The decorative surface layer of the project is hollowed and cracked in many places (see the schematic diagram of the entrustment order, the acceptance is unqualified.

    Basis: The standard putty should use putty with water resistance, and the putty is firmly combined with the matrix, no peeling, no pulverization, and no cracks. Second, the paint of the door and door frame of the hall has brushes and falls (see the schematic diagram of the order), and the acceptance is unqualified.

    Basis: The standard paint surface should be smooth, smooth, without missing brushes, peeling and spots, the varnish wood grain should be clear, the large surface should be free of edges, falling and wrinkles, the color should be basically the same, and there should be no brushing. Hardware and glass are clean.

    3. The hollow drum rate of the floor tiles in the first hall, the hollow drum rate of the floor tiles in the second hall and the hollow drum rate of the wall tiles in the bathroom are shown in the schematic diagram of the entrustment order. Basis: The standard wall and floor tile paving should be smooth and firm, the pattern should be clear, there should be no dirt and slurry marks, the surface color should be basically the same, the joints should be uniform, the plate should not have cracks, corners and missing edges, and the hollow drum rate of the corners of a single board should not exceed 5% of the quantity.

    Fourth, the wall power cord is not sleeved into the plastering layer directly buried in the plastering layer, and the connector at the top power line branch is not into the junction box (see the schematic diagram of the order), and the acceptance is unqualified. Basis: The standard electrical wiring should be laid with a dark pipe, the wire should not have knots and kinks in the pipe, the wire should not be less than 50 cm from the ** line and the closed-circuit TV line, and the exposed wire is not allowed in the ceiling, and it is strictly forbidden to bury the wire directly in the plastering layer.

    5. The water supply pipe is not fixed, and the pipeline is bent (see the schematic diagram of the order), and the acceptance is unqualified. According to the standard pipeline installation, it should be horizontal and straight, lay firmly, the slope should meet the requirements, the valve and faucet should be installed straight, flexible and convenient to use, and the open pipe should be brushed with anti-rust paint, and the hidden pipe should be brushed with anti-corrosion paint. 6. Toilet in the bathroom, there are traces of water seepage around the drain (see the intention of the power of attorney) because there is no water source, and the water test cannot be done (the result is to be determined after the water source is confirmed).

    Presenter:

  2. Anonymous users2024-02-06

    Summary. Hello dear, the completion and acceptance of the decoration project and the format of the opinion letter: —, inspection batch quality acceptance record 1, supervision acceptance record - whether it is qualified.

    2. Supervision and acceptance conclusion - all the main control projects are qualified, the general projects meet the requirements of the specification, and the inspection batch is qualified. Second, the sub-project quality acceptance record 1, supervision and acceptance conclusion - whether it is qualified. 2. Under the acceptance conclusion - this sub-item is qualified.

    Third, the sub-division project quality acceptance record supervision and acceptance opinions - the sub-items contained in the sub-division are not omitted and all qualified, the sub-division is qualified, agree to acceptance. Fourth, the division of the project quality acceptance record acceptance group acceptance opinions - contained in the sub-divisions without omission, and all qualified, this division qualified, agreed to accept.

    Hello dear, the completion and acceptance of the decoration project and the format of the opinion letter: —, inspection batch quality acceptance record 1, supervision acceptance record - whether it is qualified. 2. Supervision and acceptance conclusion - the main control project is all qualified, and the general project meets the requirements of the specification, and the inspection batch is qualified.

    Second, the sub-project quality acceptance record 1, supervision and acceptance conclusion - whether it is qualified. 2. Under the acceptance conclusion - this sub-item is qualified. Third, the sub-division of the project quality acceptance record supervision acceptance opinions - contained in the sub-items without omission and all qualified, the sub-division qualified, agree to accept the congratulations.

    Fourth, the division of the project quality acceptance record acceptance group acceptance opinions - contained in the sub-divisions without omission, and all qualified, this division qualified, agreed to accept.

    Decoration is also known as decoration or decoration. It refers to a set of construction plans and design schemes carried out in a certain area and scope, including hydropower construction, walls, floors, ceilings, landscapes, etc., and formed by cracking according to certain design concepts and aesthetic rules. From the placement of furniture and the closing of doors, to the customization of room accessories and lamps, they are all the embodiment of decoration.

    Decoration is different from decoration, decoration is the artistic processing of daily necessities or living environment. Strengthen the aesthetic effect, and improve its functional, economic value and social benefits, and take environmental protection as the design concept. The perfect decoration should be closely integrated with the function of the object, adapt to the production process, give full play to the properties of the material materials, and have a good artistic effect.

Related questions
7 answers2024-03-26

Oh, my family is like this, I don't know if your house is the top floor, the top floor of our community is like this. I'd like to ask if your living room is right at the door, and if so, it's easy to do. You better ask my question first, because my home has just been renovated and I know better.

8 answers2024-03-26

All the branch acceptance is qualified and the testing data is complete.

8 answers2024-03-26

When it comes to interior renovation, there are certain steps and sequences that need to be followed to ensure a smooth process throughout. First of all, the first step in renovation is usually design and planning. This includes determining the style of the renovation, color scheme, material selection, etc., and developing a detailed renovation plan. >>>More

8 answers2024-03-26

The completion acceptance stage is the final overall quality acceptance stage, and I am afraid that you may be involved in the information that happened before, so basically all the information during the construction period should be prepared, including: >>>More

8 answers2024-03-26

Summary. How to write the perception data of the completion and acceptance of the landscaping project. >>>More