-
It seems that you have just been in this position for a short time, and the question is very simple, you type in the question you want on the Internet, and there is basically something for you to refer to, which is all your own detailed questions in your work. It should be easier to write, in these things, I feel that the problems are all things that you have encountered, and you need to improve yourself.
-
1.Proficient in the use of office software.
2.Responsible for the collection and sorting of final test documents, scanning and archiving, and those who can understand the electrical control diagram are preferred to verify the completeness and correctness of the drawings.
3.Able to take over part of the supervisor's daily work tasks during the supervisor's vacation.
4.Coordinate with relevant departments to clarify the completeness of the drawings of the Pisheng and Demolition Project and track the progress of the drawings.
5.Assist the supervisor to do a good job in relevant data statistics and analysis.
6.Interested in electrical professions in order to develop wiring and testing skills.
1.Mainly responsible for the secondary processing of materials in the production workshop and the follow-up of material sentiments;
3.Responsible for the work of the moon base;
4.Responsible for material receiving, packing and delivery;
5.Responsible for contacting with the best businessmen and maintaining a good relationship with the company.
6.Complete other tasks assigned by the leader.
1. Production plan, follow up the production plan of the company's production workshop.
2. Staff training, responsible for and assisting the administrative supervisor to new employees. On-the-job training and on-the-job employee training, corporate culture promotion, organizational structure, company development trend, promotion space, etc.
3. Responsible for the drafting of administrative documents, meeting minutes, work reports, etc., as well as daily secretarial and information reporting.
4. Assist the department to do other auxiliary services;
5. Do a good job in the coordination of departments and other departments.
-
Workshop clerk job content.
1. Each shift must arrive at the post 15 minutes in advance, and after arriving, open the door and turn on the power. After the employees are ready, Xun Travel records the number of attendees and the number of people who have not reported to work, and reports the number of attendees to the production department.
2. Responsible for summarizing the production report of the whole workshop every day "Daily Report Form", summarizing and submitting it to the production department (Mr. Zhou), and reporting to the workshop supervisor.
3. Clean the office hygiene every day (such as washing cups, wiping tables, stools) and sorting out some expired production orders.
4. If there is hardware to be on, do a good job of handing over the hardware personnel, and clear the mu of God one by one.
5. Go to the warehouse to receive auxiliary materials (such as: adhesive tape, blades, 502 glue, etc.).
6. Whenever the production order falls into the workshop, the production order will be sent to each group (8 copies: cutting group, shoulder strap group, oil edge group, feeding group, packaging group, supervisor, two directors 1 copy each) and send a few copies of the hand-copied to other departments to ensure that each department, each town promotion team leader has a production order.
7. At the beginning of each month, summarize the previous month, and do a good job in the performance evaluation table of the workshop. And clean up the expired information, such as the warehouse material arrears table, production schedule, receipt list, etc.
In the blink of an eye, the semester is coming to an end. From the panic on the first day of taking office to the joy of reviewing and summarizing the work of this semester at this moment, I feel that I am gradually improving in my work ability and other aspects. I am very happy that I became the class leader of the second class of the 07 International Trade Center. >>>More
If it is for the army, you can buy a model in this area, and in 06 the four general departments issued four books on this aspect, divided into different units and departments. It is from the Long March Publishing House. If the landlord is in Beijing, he can buy it, he is on the side of a Guangfa Bank opposite Providence.
In 20xx, with the support and help of the leaders, and the cooperation of colleagues in the unit, I basically completed various tasks and made some achievements, of course, there are still some problems and shortcomings, I will be realistic and realistic, and continue to work hard. The personal work status of the 20xx year is summarized as follows: >>>More
1. First of all, let's analyze the motivation for formulating this system: check the saturation of employees, let me know what employees do in a day; Through this system, employees can understand the thinking and summary, and quickly improve their work ability; Let me know what problems the employee is having at work. >>>More
Mainly write about the content of the work, the achievements, and the shortcomings, and finally put forward reasonable suggestions or new directions... >>>More