  1. Anonymous users2024-02-07

    The materials required for the new power grade C qualification are:

    1. Application form and electronic document for engineering survey and engineering design qualification (EPK format);

    2. A copy of the business license of the enterprise legal person and partnership;

    3. The text of the articles of association or partnership agreement;

    4. Identity certificate of the legal representative and partner of the enterprise;

    5. The identity certificate, employment documents, graduation certificates, and professional title certificates of the person in charge of the enterprise and the main technical person in charge shall also provide the basic information and performance table of professional and technical personnel (including a copy of the corresponding performance signature);

    6. The identity certificate of the registered practitioners listed in the application form for engineering survey and engineering design qualifications and the "Letter of Commitment for Handling the Qualification Procedures for Registered Personnel"), of which the registered practitioners of engineering survey also need to provide the "Basic Information and Performance Table of Professional and Technical Personnel" (including a copy of the corresponding performance signature);

    7. The identity certificate, graduation certificate and professional title certificate of non-registered professional and technical personnel required by the qualification standards for engineering survey and engineering design, and the non-registered personnel of the leading profession shall provide the "Basic Information and Performance Table of Professional and Technical Personnel" (including a copy of the corresponding performance signature);

    8. The main pages of the labor contract signed between the main professional and technical personnel (registered and non-registered) required by the engineering design qualification standards and the enterprise in accordance with the law (including the names of both parties to the contract, the start and end time of employment, the signature and seal, and the effective date), the relevant supporting materials for the termination of the employment labor contract with the original employing unit and the copy of the social security certificate in the past month; Among them, the main professional and technical personnel engaged in engineering design in the military or colleges and universities do not need to provide social security certificates, but they need to provide personnel certification materials of the personnel department at the higher level of the unit;

    9. Proof of office premises (a copy of the property right certificate shall be provided if it belongs to its own property rights; If it is rented or borrowed, the property right certificate of the lessor (borrower) and a copy of the lease contract or borrowing agreement between the two parties shall be provided).

  2. Anonymous users2024-02-06

    Grade C power design qualification for power transmission and transformation requires personnel, and our company can provide all full-time and upright personnel!

    1) It has the qualification of an independent corporate legal person.

    2) Good social reputation, registered capital of not less than 500,000 yuan.

    Grade C qualification for power transmission and substation engineering design.

    Registered electrical power generation and transmission 100,000 a year (1 person).

    Registered Level 2 Structural Engineer 30,000 a year (1 person).

    General Drawing Senior Engineer 20,000 a year (1 person).

    20,000 years of senior engineer in electric power (1 person).

    The estimated budget of the project economy is 20,000 yuan a year (1 person).

    20,000 senior engineers of communication protection (1 person).

    Qualification process:

    1. Industrial and commercial registration;

    2. Purchase the system of the Ministry of Construction or the Department of Construction;

    3. Staffing and registering personnel;

    4. Prepare the reporting materials (online declaration and print to form paper materials);

    5. Submit the information of the qualification applicant;

  3. Anonymous users2024-02-05

    How to handle the first and second level power qualifications.

    1. The handling method of the second-level power qualification is as follows:

    1) Electric power construction enterprises obtain industrial and commercial business licenses;

    2) the construction enterprise in the name of the legal person to the district and county construction administrative departments to submit a written application;

    3) District and county construction administrative departments agreed, reported to the Municipal Bureau of Housing and Urban-Rural Development;

    4) The Municipal Bureau of Housing and Urban-Rural Development shall review the enterprises applying for the qualification of general power contracting;

    5) The applicant enterprise shall submit the original and copy of the qualification application materials to the construction industry management department of the district and county where it is located in accordance with the principle of territorial reference and medium-resistant management;

    6) The construction department will review the qualification application materials;

    7) If there is no objection to the publicity, the qualification certificate for general contracting of electric power shall be issued.

    2. Legal basis: Article 6 of the Electric Power Law of the People's Republic of China.

    The electric power management department is responsible for the supervision and management of the national electric power industry. The relevant departments shall be responsible for the supervision and management of electric power undertakings within the scope of their respective duties.

    The local people's economic comprehensive department at or above the county level is the electric power management department within its administrative area, which is responsible for the supervision and management of electric power undertakings. The relevant departments of the local people's government at or above the county level shall be responsible for the supervision and management of electric power undertakings within the scope of their respective duties. Yuichun.

    2. What materials are required to apply for second-level power qualification?

    1. Qualification application formFor the power construction qualification of the construction enterprise, the qualification declaration shall be made to the local construction department, and the qualification application form shall be filled in and the relevant materials shall be submitted;

    2. The basic information of the enterprise proves that the enterprise can apply for the corresponding level of qualification certificate, including business license, articles of association, etc.;

    3. Enterprise qualification materials: For the power construction qualification of Leshan enterprises, it must meet the qualification application conditions and prepare the corresponding supporting materials.

  4. Anonymous users2024-02-04

    <> The first step is to prepare a business license

    Before applying for qualifications, construction enterprises must have a business license.

    The second step is to equip professionals according to the qualification standards of the application, and at the same time to obtain the corresponding certificates

    Prepare to apply for the corresponding technical personnel of the qualification level: first-class constructor, second-level constructor, senior engineer, engineer, nine members, technical and technical workers, etc.

    Step 3: Submit an application

    Enterprises that handle qualifications shall submit a written application to the construction administrative department of the place where the enterprise is registered in the name of a legal person.

    Step 4: Review and approval:

    The Municipal Bureau of Housing and Urban-Rural Development shall review the enterprises applying for qualifications, mainly to review whether the personnel, assets and project performance of the enterprises meet the qualification standards.

    Step 5: Report:

    Enterprises applying for qualifications shall submit the original and copy of the qualification application materials to the construction industry management department in accordance with the principle of territorial management, and the construction industry management department shall report to the construction management office after passing the preliminary examination.

    Step 6: Publicity:

    The construction management office will review the qualification application materials and publicize the qualifications that meet the application standards.

    Step 7: Get the certificate:

    After the publicity is completed, the qualification certificate will be collected.

  5. Anonymous users2024-02-03

    The following conditions need to be met for the design qualification of the power industry:

    1.Bachelor's degree or above in engineering design or related majors, or equivalent academic ability;

    2.Professional qualification certificates such as national registered architect, registered structural engineer, registered electrical engineer, etc.;

    3.Have been engaged in power engineering design and management for more than 5 years, and have been accompanied by prior inspection;

    4.Ability to undertake engineering design tasks independently;

    5.Have good professional ethics and work records, and have no records of violations of laws and regulations;

    6.It has corresponding designers, technical equipment and management systems.

    The process is as follows:1Log in to the National Enterprise Credit Information Publicity System (, register and log in;

    2.Query the relevant information of the application for Grade B qualification in the power industry in the system, including the qualification application conditions, application materials, charging standards, etc.;

    3.Prepare the application materials, including the business license of the enterprise, the ID card of the legal representative, the title certificate of the designer, the proof of work experience, the list of technical equipment delays, the management system, etc.;

    4.Submit the application materials to the local power industry design grade B qualification evaluation agency;

    5.After the audit is passed, the relevant fees will be paid, and the code will be disguised to obtain the Grade B qualification certificate for design in the power industry.

    It should be noted that applicants should submit true, accurate and complete application materials in accordance with the regulations, and if fraud and other violations are found, they will face penalties such as disqualification and suspension of application.

  6. Anonymous users2024-02-02

    The second-level power qualification is handled as follows:

    1. Recruiting personnel, the core of the enterprise to complete the project contracting is to have all kinds of professionals. In the review requirements of the competent department, it will also focus on whether the personnel meet the conditions. Therefore, if you decide to apply for the second-level qualification of power construction, the company must start recruiting professionals.

    Of course, in order to save money, you can also choose the way of affiliation.

    2. Material preparation, personnel certificates, business licenses, legal person information, etc., are all important supporting materials, which must be prepared and completed before the application is submitted. However, it takes at least one month for each material to be fully produced without errors or omissions.

    3. For online car opening and on-site application, first fill in the application form on the official website of the competent department, and then submit the materials to the service window of the competent department. In general, it is best to make an appointment 2 weeks in advance in order to complete the application smoothly so that you can be prepared.

    4. The competent department audits, and the second-level qualification of power construction is managed by the provincial competent department, so it must be reported to the provincial department for review, and the audit results will take 20 working days. In addition, the application for the construction qualification of electric noise sail grinding force is approved, and it must be approved by the power department at the same level, so it will take an extra 10 working days to process.

    5. Communicate the cost of power qualification transfer, after Shengdou solves the situation of the transfer company, there will basically be several suitable companies to choose from. In this case, you will need to communicate with several companies in order to understand the cost. And after a detailed understanding of the charges, you can make the most suitable choice among several companies.

Related questions
12 answers2024-03-22

The engineers required for the C-level qualification for power transmission and transformation in power design are: 1 person for registered power generation, transmission and transformation, 1 person for registered secondary structure, 1 person for estimated budget middle engineer, 1 person for communication senior engineer, 1 person for electric power senior engineer, and 1 senior engineer for general planning. >>>More

6 answers2024-03-22

The information security service qualification certificate is issued by the China Information Security Evaluation Center.

17 answers2024-03-22

Engineering survey is a crucial step in the whole project, therefore, most enterprises continue to carry out business by applying for relevant qualification certificates. However, due to the lack of understanding of survey and design qualification certificates, it often leads to many problems. So, what issues need to be paid attention to when handling the survey and design qualification certificate? >>>More

7 answers2024-03-22

Qualification standards for engineering design units: 1Must have Grade A engineering design qualifications; 2. >>>More

4 answers2024-03-22

The first step is to prepare a business license: before applying for qualifications, the construction company must have a business license. >>>More