How much does it cost to open an account for water and electricity?

Updated on society 2024-03-29
14 answers
  1. Anonymous users2024-02-07

    The utility account opening fee needs to be based on the local charging standard. Now the housing construction fee project has incorporated the water and electricity charges into the urban infrastructure supporting fees, and the water and electricity meter costs are included in the construction cost of real estate.

  2. Anonymous users2024-02-06

    The details are as follows.

    In general, you don't need to pay it. It should be included in the sales cost.

    In some cases, an account opening fee is required.

    Very rarely, if you require water and electricity, you need to pay an account opening fee.

    Utility charges are the costs incurred by households or organizations for water and electricity, and are a combination of "water charges" and "electricity charges".

    The water fee is the fee paid to the water supply unit by the water supply unit and individual who use the water supply project** in accordance with the regulations.

    The cost payable to the power supply agency for the consumption of "electric energy" is called "electricity charge".

    The water fee is the fee paid to the water supply unit by the water supply unit and individual who use the water supply project** in accordance with the regulations. The introduction of water charges is a development trend in modern legislation, and many countries have introduced a system of water charges for all or part of the water used.

    In 1985, China promulgated the Measures for the Verification, Collection and Management of Water Charges for Water Conservancy Projects, which made specific provisions on the purpose of collecting water charges, the principles of approving water charges, and the collection, use and management of water charges.

    The Water Law also stipulates that the use of water from water supply projects** shall be paid to the water supply unit in accordance with the regulations. The purpose of levying water charges is to make rational use of water resources, promote water conservation, and ensure the necessary operation and management, overhaul and renovation costs of water conservancy projects.

  3. Anonymous users2024-02-05

    The utility account opening fee needs to be based on the local charging standard. According to the national standard, one kilowatt-hour of electricity is yuan, and one cubic meter of water is yuan, which is the national standard for electricity consumption.

    Now the housing construction fee project has incorporated the water and electricity charges into the urban infrastructure supporting fees, and the water and electricity meter costs are included in the construction cost of real estate.

    Precautions for the acceptance of water and electricity in new houses

    1. It is taboo to bend and bend in hydropower transformation. Generally, when laying line water pipes, we should try to pursue vertical, and if it is really not possible to bend, we should also install a junction box in the middle, which is an important one of the precautions for hydropower acceptance.

    2. Don't forget to do the suppression test and water seepage test. In the process of hydropower acceptance, we should conduct pressure tests and water seepage tests on water pipes and drainage pipes respectively.

    3. It is not mandatory to open an account for hydropower, and the leakage experiment is very important when accepting hydropower, which has a direct impact on the safety of our lives.

  4. Anonymous users2024-02-04

    As of July 2021, ** is around 500-1200 yuan.

    The utility account opening fee needs to be based on the local charging standard. Now the housing construction fee project has incorporated the water and electricity charges into the urban infrastructure supporting fees, and the water and electricity meter costs are included in the construction cost of real estate.

    Electricity account opening process:

    1. Fill in the application form: The construction unit (or user) fills in the application form at the administrative service center. Information to be provided: 1 copy of ID card.

    Power users must present the unit certificate, the ID card of the legal representative, and the business license. The catering industry should also present a hygiene license. The electricity used for the project should be approved by the county government.

    2. After filling in the application, the staff of the administrative service center window (power supply customer representative) will wait for the approval of the marketing department. (The customer leaves ** number to wait for notification).

    3. After the procedures are approved, the urban customer service center will send personnel to investigate the site.

    4. After the electricity planning is perfected, pay the relevant fees and install the electricity.

  5. Anonymous users2024-02-03

    Hello Answer! Article 4 The infrastructure construction costs supporting the commercial housing shall be included in the development and construction costs and the entry housing prices, and shall not be charged separately from the contract price for the purchase of houses. Article 5 Expenses included in the price of the house:

    1) One meter per household and construction costs for electricity: (2) One meter for one household and construction costs for water supply; (3) The cost of pre-embedding piped natural gas to households, the installation fee of the gas courtyard pipe network and indoor pipeline for residential users (as stipulated in Document No. 91 of Hunan Price Merchant [2009]); (4) Fees for cable television embedded in the home; (5) ** line embedded to the household fee; (F) multi-** communication system embedded to the home costs; (7) Expenses related to anti-theft doors and anti-theft monitoring systems; (H) unit electronic intercom security door related costs; Basically, it is normal to not exceed 2,000 yuan.

  6. Anonymous users2024-02-02

    The utility account opening fee needs to be based on the local charging standard. Now the housing construction fee project has incorporated the water and electricity charges into the urban infrastructure supporting fees, and the water and electricity meter costs are included in the construction cost of real estate.

  7. Anonymous users2024-02-01

    Xinghua City Linhu Township tap water account**.

  8. Anonymous users2024-01-31

    When opening an account for the meter, you also need to pay the relevant fees, and the cost of opening the meter account in each city is also different, the cost of opening a meter account in some cities is only about 300 yuan to 500 yuan, but the cost of opening an account with an electric meter in some cities is also about 1000 yuan. When opening an account for the meter, it is necessary to install it first, and it is also necessary to pay the corresponding material costs and corresponding labor costs, which add up to more, although the state stipulates that the meter account opening does not need to pay the fee, but in most cases it is necessary to pay the fee.

  9. Anonymous users2024-01-30

    According to the current policies and business rules, if you are a customer within the service scope of Guangdong Power Grid Company, the installation fee is determined by the property right demarcation, and the power supply enterprise invests in the construction before the demarcation point, and does not need to charge fees; After the demarcation point, the customer hires a qualified construction unit or electrician to construct and bear the cost, and the specific investment demarcation point needs to be subject to the on-site investigation by the staff, and it is recommended that you directly communicate with the staff who handle the installation of electricity meters for you on site.

    If you need to apply for high-reliability power supply, that is, customers who have dual power supply or more power supply requirements, you need to pay the high-reliability power supply fee as required.

    We hope you find ours helpful. If you have any other questions, please call the 24-hour power supply service**95598.

  10. Anonymous users2024-01-29

    Legal Analysis:1The gas account opening fee is borne by the developer.

    2.As early as 2001, the gas account opening fee was strictly cancelled in the national document No. 585. (1) For residential users, the name of the charge is unified as "civil pipeline natural gas construction project and material cost" (including the cost of civil pipeline gas project construction and engineering material installation, excluding the cost of gas cooker, the same below).

    The trial fee standard is: 2,500 yuan per household in the completed community (IC card gas meter, the same below), villa residences are charged twice the above standards, and new communities are charged 25 yuan per square meter of building area, which is included in the house price, and the developer will settle the settlement, and no longer charge residents separately. (2) For pipeline gas users who have paid the "pipeline liquefied petroleum gas construction fee" in Fuyuan community and other areas, when the natural gas supply is replaced after your company takes over, the "civil pipeline natural gas construction project and material fee" will no longer be charged.

    For residential areas such as Fuyuan Community, which have already laid a gas supply pipeline network, after the property management company takes over, if the household newly applies for the installation of piped natural gas, if there is no need to carry out pipeline network transformation, the construction project and material costs shall be implemented according to the original standards stipulated by the Market Price Bureau. (3) For industrial and commercial group users, according to the actual cost of the courtyard pipe network project, in line with the principle of voluntary negotiation, the applicant installation unit shall pay. (4) The fee income collected by the company shall be supervised by the municipal construction, price and other departments, and shall be stored in a special account for pipeline construction.

    5) The cost of pipeline natural gas construction projects and materials shall be charged for the operation of enterprises, and the charging standard shall be implemented for a trial period of one year. One year later, the formal fee standard will be re-approved in accordance with the prescribed procedures. 3.

    According to the relevant regulations, when selling commercial housing, commercial housing operators shall not increase the price of commercial housing or charge unspecified fees, and shall not collect water, electricity, gas and other supporting facilities in addition to the price of the house.

    Legal basis: Regulations on the Administration of Urban Gas

    Article 5 The construction department shall be responsible for the national gas management work.

    The local people's ** gas management department at or above the county level is responsible for the gas management within its administrative area.

    In accordance with the provisions of these Regulations and other relevant laws and regulations, the people's ** and other relevant departments at or above the county level shall be responsible for the management of gas within the scope of their respective duties.

    Article 6 The State encourages and supports the scientific and technological research on gas, and promotes the use of safe, energy-saving, efficient and environmentally friendly new gas-fired technologies, new processes and new products。

    Article 7 The relevant departments of the people's ** at or above the county level shall establish and improve the gas safety supervision and management system, publicize and popularize gas laws, regulations and safety knowledge, and improve the gas safety awareness of the whole people.

  11. Anonymous users2024-01-28

    What specifications, the general single-phase is not charged, and the charge will not exceed 500, and the three-phase meter is less equipped with home users, generally industrial.

    You can call 95598 is the local power supply department**, ask, most places install single-phase household meters do not need to pay.

    Extended Information: Section 1.

    1. Before installation, be sure to check whether all the parts that need to be used for the installation of the meter box are in accordance with the specified model and whether they are in good condition.

    Clause. 2. For the installation position of the meter box, it is necessary to choose a position where there is no violent vibration and weak impact, so that the components in the meter box will not be damaged due to vibration or impact.

    Clause. 3. The installation of the meter box should be kept vertical, and the tilt angle should not exceed the specified standard. And try to keep it at a certain height.

    Clause. Fourth, because the materials of the meter box are some materials that are not very resistant to acid and alkali and other chemical components, it is necessary to avoid direct contact with these chemicals during installation and later use.

    Clause. 5. The installation site of the meter box should be cleaned and cleaned regularly, so that the performance of the meter box can be kept in the best state. When too much dust enters the meter box, it may cause a fault or a different abnormal phenomenon.

    Clause. 6. The place where the meter box is installed must avoid direct sunlight for a long time. Because this may not only reduce the service time of each electronic component in the meter box, but also cause a series of safety accidents.

    Clause. 7. When installing the meter box, we must pay attention to the use of tools, so as not to let sharp and sharp objects directly collide with the surface of the meter box, scratch and other phenomena.

  12. Anonymous users2024-01-27

    There is no need to pay any fee to open an electricity meter, we must know that the meter is to calculate the amount of electricity, and we must pay the electricity bill according to the numbers on the meter.

    Meter account opening is to bring personal ID card and personal household registration and other information, to the local power supply bureau to open an account, after opening an account, we have our own account, we can check the monthly electricity consumption and specific bills according to this account.

    The calculation standard of electricity is also different, if it is an ordinary resident, the ** of one kilowatt-hour of electricity is about 5 cents, if it is commercial electricity, ** will be higher.

  13. Anonymous users2024-01-26

    There is no fee to open a meter account.

    Apply to the local electricity authority with valid documents and required information, and you can open an account after the application is approved.

    After you open an account and inject funds, you will be able to use electricity legally.

  14. Anonymous users2024-01-25

    Summary. Hello Hello is honored to answer for you, the cost of opening a tap water account needs 850-1000 yuan, 1. Public pipe network construction fee 1, the construction fee of public pipe network for residents' domestic water is 1800 yuan per household according to DN15 ordinary water meter, and 850 yuan for old users. The business user is calculated as 80 square meters of households, and the office space is calculated as 150 square meters of residential water. 2. Comprehensive Management Fee:

    Including the costs incurred in the process of survey, design review, construction management, completion acceptance, user compensation, etc.). 1. The comprehensive management fee shall be calculated according to the DN15 water meter of 300 yuan per household, and the area exceeding the DN15 meter diameter or excess area shall be converted according to the standard of public pipe network construction fee. The pipeline installation project fee shall be calculated and collected by the installation department according to the fixed amount of the installation project, and the fixed budget of the cost can also be implemented according to the user's voluntary consultation, and the lump sum fee standard shall not exceed 1,000 yuan per household (DN15) (the material fee for the water meter should be replenished when using a new type of water meter or smart water meter).

    How much does it cost to open an account with Pingtan tap water.

    Hello Hello is honored to answer for you, the cost of opening a tap water account needs 850-1000 yuan, 1. Public pipe network construction fee 1, the construction fee of public pipe network for residents' domestic water is 1800 yuan per household according to DN15 ordinary water meter, and 850 yuan for old users. The business user is calculated as 80 square meters of households, and the office space is calculated as 150 square meters of residential water. 2. Comprehensive management fee: (including expenses incurred in the process of survey, design review, construction management, completion acceptance, user compensation, etc.).

    1. The comprehensive management fee shall be calculated according to the DN15 water meter of 300 yuan per household, and the area exceeding the DN15 meter diameter or excess area shall be converted according to the standard of public pipe network construction fee. The pipeline installation project fee shall be calculated and collected by the installation department according to the fixed amount of the installation project, and the fixed budget of the cost can also be implemented according to the user's voluntary consultation, and the lump sum fee standard shall not exceed 1,000 yuan per household (DN15) (the material fee for the water meter should be replenished when using a new type of water meter or smart water meter).

Related questions