What is the process of exhibition design, what is the complete process of exhibition hall design?

Updated on technology 2024-04-20
7 answers
  1. Anonymous users2024-02-08

    Exhibition design process.

    2. Design: communicate with the designer and communicate with the customer in real time, and deliver the first draft of the design, the design description, the engineering and the research to the customer.

    Customer feedback and revisions again, delivery of final draft and engineering**.

    3. Signing: Determine the project with the customer, clarify the requirements for mutual cooperation with the customer, and sign the contract.

    Fourth, the system: complete the production and preparation work, complete the host, the main venue, the exhibition hall and other procedures.

    5. On-site construction: on-site exhibition construction, handling on-site additions and changes to projects, cooperating with customer exhibits to enter the site, and customer acceptance.

    6. Exhibition service: on-site maintenance during the exhibition. Arrange on-site emergency services and value-added services during the exhibition, and cooperate with customers to leave the exhibits and dismantle them on site.

    7. Follow-up.

  2. Anonymous users2024-02-07

    If you want to get the ideal publicity, enterprises can also show the advantages of their own enterprises and attract visitors through the way of exhibition display. But not every enterprise participating in the exhibition can get good publicity, booth display design plays a decisive role in the publicity effect, excellent exhibition design can attract a large number of visitors, get good publicity, and the inconspicuous exhibition design can only be buried in many booths, so how to have excellent exhibition design works, today Bumblebee exhibition design will talk to you about a few tips about exhibition design, to help your booth in the exhibition charm.

    1. Color matching is very important.

    The materials used to build the exhibition are relatively traditional, and the key consideration is the color matching when making the design, and the innovative color matching can create a unique visual feast, which can attract more visitors in the exhibition, and also let the visitors have a good impression of the enterprise from the excellent design of the booth. Color matching is often selected according to the style of the enterprise, and the characteristics of the enterprise are shown with color, which is a good help for the company's publicity and market expansion.

    2. The harmony of the overall space of the booth.

    The harmony of the space depends on how the designer grasps it. For example, each area of the booth will have different display content, so we should not only show wonderful content or products in different areas, but also make each area have a strong relevance, so that the space of the booth has harmony, give visitors a good viewing experience, enhance their interest in the enterprise, and have a very high value for the publicity and promotion of the enterprise.

    These two points are particularly important for the exhibition display design, first attract visitors, in enhancing the visitors' interest in the enterprise, it will get the ideal publicity, if there are any questions you don't understand, you can go to () Bumblebee exhibition design for consultation, more design skills and design cases, () Bumblebee exhibition design.

  3. Anonymous users2024-02-06

    Preliminary work for the design of the exhibition hall.

    The preliminary work is mainly to collect the background environment information data of the exhibitor and the needs of the exhibitor, as well as to sort out and summarize the specific information such as the location, size, height, status quo and exhibits of the exhibition space. In particular, it is necessary to collect information related to the content of the exhibition, exhibition materials, etc., and the results of this work will be sorted out by our planning and design department in the form of copywriting, and provide relevant basis for the subsequent design work. The main focus of this link is the planning of the theme of the exhibition hall and the collation of exhibition materials.

    Conceptual design of the showroom.

    Led by the showroom design company. In the conceptual design scheme of the exhibition hall, the entire exhibition hall structure, exhibition hall style, exhibition space layout, visit route, overall form, tone, color, artistic atmosphere, and key expression will be designed. And refine the theme and content of the exhibition, and give it an infectious artistic vision and display form.

    It is presented in the form of a manifestation of ** in the scheme. It includes a series of floor plans, schematic diagrams of exhibition spaces, schematic diagrams of layout design, and schematic diagrams of color effects and lighting effects.

    Detailed design of the exhibition hall.

    After the exhibitor determines the main design direction, the exhibition hall design company will modify and refine the details of the exhibition hall design plan according to the requirements of the exhibitor. In the process of deepening the design, the exhibition space determined in the conceptual design is concretized with the actual structural size and shape to form a rendering. Determine the detailed modeling, construction method, application materials, and detailed dimensions of display facilities such as exhibition props, models, light boxes, and decorations such as booths and exhibition racks.

    There is also the content of some layouts, logos and other plane limb and branch meters. In addition, other special locations such as fire escapes, safety hazard signs, etc., are also illustrated in detail.

    Design and construction docking.

    The key and premise for the completion of the exhibition hall construction is to realize the implementation of the exhibition hall design plan. Otherwise, it's all on paper. After the deepening is completed, the designers of the exhibition hall design company will provide more detailed construction drawings for the construction department and cooperate with the construction department to complete the implementation of the construction plan.

    At the same time, the two sides will coordinate according to the actual situation of the exhibition hall, implement the design plan of the exhibition hall, and turn the vision of the exhibitor into reality.

  4. Anonymous users2024-02-05

    1. Preliminary preparations; In the early stage of exhibition hall design, the designer and Party A need to do a good job of communication, and the specific matters are: positioning, budget, information, area and space, etc., and the exhibition hall company will give professional suggestions according to these needs and basic information. Then sign a cooperation agreement to carry out the project promotion and time schedule.

    2. Determine the design idea; According to the needs, information and on-site investigation provided by Party A, the design theme and ideas of the entire exhibition hall are determined.

    3. Adjustment and determination of the design scheme; The designed plan is given to Party A, and Party A accepts the design plan according to its own needs, and if the plan needs to be adjusted, the two parties can communicate and adjust, and finally achieve the best exhibition hall design effect.

    Fourth, the project determination and construction; At this stage, the construction party needs to issue the project construction drawings according to the final design renderings.

    5. Project acceptance stage; The construction of the project is completed, and Party A accepts the project.

  5. Anonymous users2024-02-04

    Please elaborate on the process for presenting your design. 1. Preliminary planning (about 1-5 working days) Preliminary planning of the location of the booth, display of core products, display of style, layout, exhibit characteristics, etc. (about 2-8 working days) The design director communicates and exchanges to determine the customer's design style (about 3-5 working days).

    2. Design stage (about 2-3 working days) Fourth. Post-production provides relevant text materials according to the design plan. (About 2-5 working days) Preliminary planning of the location of the booth, display of core products, display style, layout, exhibit characteristics, etc

    Pre-system... a.Repeatedly revise the tune.

    a.Anti-6).

    b. 1.Total.

    Anti-anti... b.Proposal No.

    Full. Full 2 times e 。

    Don't leak 3 times e.Correct.

  6. Anonymous users2024-02-03

    1. Early communication.

    Before the design of the enterprise exhibition hall, we must have a certain grasp of the structure of the exhibition hall area, accurately measure the following specific dimensions, and ask the technical professional exhibition hall design company to draw a detailed plane design drawing. The main thing is to understand the actual reasonable layout (including effective changes to the original structure) and its decoration ** budget cost (including the price and manpower cost of main materials and auxiliary materials), and you can have a general idea of how to decorate your own enterprise exhibition hall.

    Before doing it, it is necessary to communicate with the data exhibition hall design company to determine the precise positioning, detailed address, total area, cost budget, and actual effect of the enterprise exhibition hall. After establishing the requirements, the producer will have an in-depth understanding of the company's culture and art, corporate products and development trends, so as to facilitate the reasonable layout and program planning.

    2. Planning plan.

    Based on basic good communication, the data exhibition hall design company may make a conceptual plan for the enterprise exhibition hall, clarify the key design style of the enterprise exhibition hall, accurately position, and sign a contract if there is no doubt about each other.

    3. Promote the plan.

    According to the previous relevant plan design, the producer should produce renderings below, integrate the materials presented by the enterprise to carry out sound program planning, and in addition, carry out multi-system interactive experience design. This was followed by a discussion on the analysis of each other until an agreement was finally reached, and then the relevant construction drawings were produced.

    4. Exhibition hall production.

    There are many problems involved in the construction of the project, and it is necessary to carry out in-depth communication several times at this time. First of all, it is necessary to ensure safety, including high-altitude operations and electricity, etc., and always control the construction progress and quality, and encounter unscientific areas must be corrected immediately, and the manufacturer shall carry out the construction of the project in accordance with the provisions of the contract, and must not be counterfeit and shoddy, shoddy.

    5. Acceptance of exhibition hall project.

    The engineering acceptance of the enterprise for the data exhibition hall not only includes all the modeling design and reasonable layout, but also includes the display of intelligent display screen or sand table model, etc., especially at the level of machinery and equipment, which should be jointly accepted by the enterprise equipment department, electrical equipment unit, computer unit, enterprise management department, etc., to ensure that the exhibition hall can be displayed to the extreme, and it is not easy to produce common faults in the continuous use afterwards.

    6. Mid-to-late maintenance.

    If there is a problem in the exhibition hall afterwards, such as: there is a problem with the multi-system equipment, you can find the construction unit to discuss and deal with it.

  7. Anonymous users2024-02-02

    The process of designing and building the Wycombe Abbey showroom.

    1.Construction preparation: After the design plan passes the inspection and review, it will enter the construction stage, and a certain amount of dust preparation is required before the construction begins. Such as: construction disclosure and drawing review.

    2.Construction disclosure: Construction disclosure refers to the handover of the key parts of the design and the key points of the design and the construction difficulties of the construction person in charge, including the key issues of construction, materials, and institutions.

    4.Equipment installation: whether the effect of various equipment construction and the use of materials meet the design standards, especially pay attention to the application of materials and the selection of non-flammable materials.

    5.Fire & Security: Fire & Security is the most important part of the audit and is also the guarantee to eliminate potential safety hazards, including the promotion of fire regulations, the setting of fire hydrants, etc.

    6.Electrical, Lighting and Others: Check whether the installation and setting of electrical appliances and lighting comply with fire regulations, and test run electrical appliances and various lighting facilities, especially the brightness and heat dissipation of lamps and lanterns, as well as the resulting effects.

    7.Construction removal: The design scheme is scrutinized and planned from the perspective of materials, structure, handling and reuse at the beginning of the design, so as to improve the integrity of the Wycombe Abbey showroom design.

    8.After-sales service: After the construction is completed, the equipment will be solved in the shortest possible time if there is a failure in other aspects. Fantuo will have a professional service process for the design and production of the exhibition hall, such as the design plan and production according to the project site conditions and needs

Related questions
7 answers2024-04-20

It depends on what product you are developing, there are many product categories, and the investment in different products will be different, but the development process is the same >>>More

9 answers2024-04-20

Main Effects:

The main purpose of the API is to provide users and developers with the ability to access a set of routines without having to access the source code or understand the details of the inner workings. Software that provides the functionality defined by an API is called an implementation of the API. An API is an interface, so it's an abstraction. >>>More

10 answers2024-04-20

1. Make a good plan and plan.

Planning, planning, and conception of a good work are very important. First of all, industrial design and environmental design are inseparable from planning and planning. When accepting and challenging a high-end design task, it is necessary to have a detailed and thorough plan and plan, and to correctly understand the requirements of leaders and customers. >>>More

12 answers2024-04-20

Good house type! North-south transparent.

5 answers2024-04-20

Creative product design. 1. The value of product design lies in the value of creativity, if there is no creative product design, then product design is not a creative product design. The value of creative product design lies in how to design the product into a creative product design. >>>More