As long as the three-month situation is satisfied, as long as the builder and the enterprise agree to transfer out, there is no reason for the construction department not to handle it.
The conditions to be met for the transfer of registration of a first-class constructor are:
Registered in the original unit for one year.
If the registration has already been transferred, it is not allowed to be transferred more than twice in one year.
The original registration unit must agree to change the transfer-out.
There is no other certificate from the Ministry of Construction registered in the original employer.
The registration certificate and practice seal of the original unit must be obtained.
The competent department of construction where the original unit is located agrees to change the transfer-out.
There must be a new registered receiving unit.
Relationship with project manager.
Constructors and project managers have different positions, but they are engaged in the management of construction projects. The scope of the construction engineer practice is large, which can involve many aspects of engineering construction project management, and serving as a project manager is only one of the construction engineer practices; The project manager is limited to the project management of a specific project within the enterprise.
The builder has the right to choose a job relatively autonomously, can flow in an orderly manner in the social market, and has a large space for activities; The position of project manager is set by the enterprise, and the project manager is a one-time project construction manager authorized or hired by the legal representative of the enterprise.
-
Hello: Initial registration means that you have just obtained the construction engineer certificate, the first time registered in the unit, the registration period is three years (you can register within three years of getting the certificate), if you register in the third year after obtaining the certificate, you must have the corresponding continuing education hours, in order to complete the registration. After registration, it is called a registered first-class constructor.
Change registration means that if you have registered in the original unit (already a registered constructor) and want to register to another unit, you need to log in to the background of the enterprise system and transfer in the personnel file at the same time to complete the change registration. The initial registration is generally about 3 months, and the change of registration is relatively fast, generally 1 month is enough.
-
Hello: There is no limit to the number of times a first-class constructor can change the registration, but individual provinces do not go through the procedures for changing the registration within one year after the initial registration.
-
It is recommended to consult the Construction Engineering Education Network.
-
1. In the event of any of the following circumstances during the validity period of the registration, the applicant shall apply for a change of registration in a timely manner, and the validity period of the original registration certificate shall be implemented after the change of registration.
1. The practice enterprise is changed;
2. The name of the employing enterprise is changed;
3. The name of the registered builder is changed.
2. Procedures for changing the registration of first-class constructor practitioners:
1. The applicant enters the Ministry of Construction of the People's Republic of China** or China Constructor**, and registers"Level 1 Constructor Management System"To apply for change online, the original employer and the new employer will click to agree online, and the new employer will print the "Application Form for Change of Registration of Class 1 Registered Constructor" and report it online.
2. The application materials for the change of registration of the first-class constructor shall be approved and sealed by the competent department of construction of the county and city where the applicant is located and shall be directly submitted to the construction management office of the Provincial Department of Construction by the enterprise, and the Provincial Department of Construction shall print the certificate and replace the practice seal after the Provincial Department of Construction has reviewed and approved. The change registration on the registration certificate is uniformly stamped with the "special seal for the registration and management of construction engineers of the Provincial Department of Construction".
3. Materials to be submitted for the application for change of registration:
1. Application Form for Change of Registration of Registered Constructor in duplicate (printed through the registration system) and the electronic file of the system specified by the registration authority;
2. Original registration certificate and practice seal;
3. If the practice unit is changed, the employment labor contract signed between the applicant and the newly hired enterprise (or the certificate of labor, personnel and wage relationship issued by the applicant's employing enterprise) and the original and a copy of the work transfer certification materials (or the certificate of termination of the employment contract with the original employing enterprise or the expiration of the employment contract, and the retirement certificate of the retiree);
4. If the name of the employing enterprise is changed, a copy of the changed Business License of Enterprise Legal Person and a copy of the letter of change of enterprise name issued by the administrative department for industry and commerce where the enterprise is located shall be provided.
5. If the name of the registered builder is changed, the original identity certificate after the change or a valid certificate issued by the household registration management department of the public security organ shall be provided.
6. If the validity period expires, the certificate of completion of continuing education should also be submitted.
-
The registration of the first-class constructor in the province is a registration change, which is short, and generally takes about a month and a half. If it is transferred from outside the province to register, it will take about 2 months.
1. The holder applies in the registration system and enters the relevant information of the new registration unit.
2. The original unit applies in the registration system and clicks the "Agree to Transfer" button.
3. The new unit is registered in the first-level construction system, and after review, click the "same type macro transfer" and "report" buttons.
4. The new unit shall enter the relevant information of the registrant and the enterprise in the change column of the provincial first-level construction engineer management system.
6. The new unit will submit the registration change form, the original registration certificate and practice seal, the termination of the labor contract of the original unit and the labor contract of the new unit, and the certificate holder to the provincial first-class construction engineer management department.
7. After the completion of the change process, a new registration certificate and practice seal will be issued.
The construction engineer has a construction in progress that cannot be changed or cancelled.
Article 13 of the Administrative Measures for Registered Constructors stipulates that during the validity period of registration, if a registered constructor changes his or her practice unit, he or she shall terminate the labor relationship with the original employing unit, and go through the registration procedures for changing the company in accordance with the provisions of Articles 7 and 8, and continue the validity period of the original registration after the change of registration.
Constructors belong to the registration certificate and need to be registered to practice, but in principle, the registration certificate must be registered for one year before it can be transferred, and after one transfer, it is necessary to apply for the certificate to be changed again after one year.
-
It takes 40 working days for a Class 1 constructor to re-register; However, for the professions of other ministries and commissions, such as the Ministry of Communications and the Ministry of Water Resources, an additional 10 working days should be added to this basis. Holders who need to re-register can apply online through the new version of the first-class construction engineer registration management information system.
From the perspective of the market demand of the construction industry, excellent enterprises have an inherent demand for the number of core certificate holders such as builders, and the composition ratio of high holders in the enterprise will become one of the core indicators of market competition. For those who hold the certificate, the certificate has a high gold content.
With the transformation and upgrading of the construction industry, the construction standards and requirements of engineering projects are getting higher and higher, although China's construction industry is also developing, but the construction management personnel of high-quality construction personnel are still in a state of shortage, and holding a certificate is an important certificate as a qualified builder. Although holding a first-class constructor does not necessarily mean that you can become a project manager, you need to have a constructor certificate to become a project manager.
-
At present, the official clearly stipulates that the registration can be changed at any time, but some provinces stipulate that the registration cannot be changed within one year, and the specific requirements of the province shall prevail.
Re-registration refers to the registration after the initial registration, which is generally transferred from one company to another. Generally, it is necessary to register the original unit for one year, and if it has been transferred to registration, it is not allowed to have more than two transfers of registration within one year.
First-class constructor to registration materials:
1. The new unit will print out the application form for change of registration, relevant materials and tripartite agreement and deliver it to hand.
2. The original unit shall issue a certificate of dismissal and a letter of commitment on the job, and seal the application form for change of registration.
3. Send the above materials to the local construction committee for sealing.
4. Courier the stamped materials to the new unit together with the registration certificate and registration seal.
5. The new unit took the above materials and sent them to the local Changfeng Construction Nai Qing Hall for registration and review. It takes about ten working days to register, and the online public announcement will give all the balance.
1) The initial registration of a constructor generally takes between three months and six months, the general constructor from the submission of information, is expected to be publicized in 2 3 months, after the end of the publicity period, the Ministry of Housing and Urban-Rural Development will make an announcement, approve the registration, and begin to mail the registration certificate to the place of registration, and will issue an announcement in 1 2 months.
2) After the termination of the labor relationship between the registered first-class constructor and the employing enterprise, if the employing enterprise refuses to change the registration or cancel the registration without reason, the registered first-class constructor may apply to the provincial construction department for changing the registration or canceling the registration; The provincial-level construction department shall handle the change of registration or cancellation of registration in accordance with the provisions of the Administrative Measures for the Practice of Registered Construction Engineers.
3) If the registered builder is changed across provinces, his registration certificate and practice seal shall be recovered by the transferring province, and the transferred province shall be responsible for printing (pasting) the change of anti-counterfeiting stickers and replacing the practice seal.
4) Change registration, additional registration, and renewal of registration are uniformly used anti-counterfeiting stickers, and shall not be directly printed or altered on the registration certificate.
5) If the registration certificate is lost or reissued or printed incorrectly, the provincial construction department shall apply to the Market Supervision Department of the Ministry of Housing and Urban-Rural Development.
The initial registration of a construction engineer generally takes 3 to 4 months, if it is a provincial unit, the time will be shorter, you can save the district, city audit, directly report to the provincial construction department, if it is a district-level unit, it takes about 20 days or so, so it is about 3 to 4 months of time, generally speaking, in the municipal construction committee this pass is the longest audit time, and to the provincial construction department audit and municipal audit time is about the same, the national construction department review of the registration conditions of a construction engineer is the most stringent, If the provincial level through the audit, the success rate can reach more than 80%, only need to wait for the time of the public announcement, after the publicity, there will be an announcement after a month, the announcement of about half a month after the construction of the practice seal and registration certificate will be issued, and at this time the registration procedures of the first-class construction engineer have been completed. (Dali Education Finishing). >>>More
1. In the event of any of the following circumstances during the validity period of the registration, the applicant shall apply for a change of registration in a timely manner, and the validity period of the original registration certificate shall be implemented after the change of registration. 1. The practice enterprise is changed; 2. The name of the employing enterprise is changed; 3. The name of the registered builder is changed. 2. Procedures for changing the registration of first-class constructor practitioners: >>>More
The initial registration of a construction engineer generally takes 3 to 4 months, if it is a provincial unit, the time will be shorter, you can save the district, city audit, directly report to the provincial construction department, if it is a district-level unit, it takes about 20 days or so, so it is about 3 to 4 months of time, generally speaking, in the municipal construction committee this pass is the longest audit time, and to the provincial construction department audit and municipal audit time is about the same, the national construction department review of the registration conditions of a construction engineer is the most stringent, If the provincial level through the audit, the success rate can reach more than 80%, only need to wait for the time of the public announcement, after the publicity, there will be an announcement after a month, the announcement of about half a month after the construction of the practice seal and registration certificate will be issued, and at this time the registration procedures of the first-class construction engineer have been completed. >>>More
As long as the three-month situation is satisfied, as long as the builder and the enterprise agree to transfer out, there is no reason for the construction department not to handle it. >>>More
1. The first thing is to meet the requirements for registration. >>>More