The initial registration of a construction engineer generally takes 3 to 4 months, if it is a provincial unit, the time will be shorter, you can save the district, city audit, directly report to the provincial construction department, if it is a district-level unit, it takes about 20 days or so, so it is about 3 to 4 months of time, generally speaking, in the municipal construction committee this pass is the longest audit time, and to the provincial construction department audit and municipal audit time is about the same, the national construction department review of the registration conditions of a construction engineer is the most stringent, If the provincial level through the audit, the success rate can reach more than 80%, only need to wait for the time of the public announcement, after the publicity, there will be an announcement after a month, the announcement of about half a month after the construction of the practice seal and registration certificate will be issued, and at this time the registration procedures of the first-class construction engineer have been completed.
Analysis of the time occupied by the initial first-class constructor registration time in each department;
The time for the District Construction Committee to review the registration conditions of first-class constructors is general: one week to about 20 days;
The initial registration time of the Provincial Department of Construction for the review of first-class constructors is: about 30 days;
The initial registration conditions for the Ministry of Construction to review the first-class constructor are: about 30 days;
The above levels are the time required for the initial registration of the first-level constructor, and the approximate time occupied in each link.
-
There is no time limit for the re-registration of a first-class constructor, the problem is that you must participate in continuing education every three years, and so on, as long as there is no revocation, you can re-register, if you re-register after cancellation, you can transfer the registration within 5 working days, you can get the registration process of a constructor: results inquiry - results pass - certificate collection - registration acceptance - registration review - decision - notice The following mainly introduces the registration process of a first-class constructor, that is, from registration acceptance to notice. (1) Accept the applicant to log in to the China Construction Engineer Network"The first-class construction of the registration management system for the blind and the honorable"or"Application system for temporary practice certificates for Class 1 and Class 2 constructors"Fill in the form, print out the corresponding application form, and submit the following written materials:
Submission for cancellation of registration: 1. Application Form for Cancellation of Registration of Class 1 Registered Constructor (5-1) in duplicate; 2. Original registration certificate and practice seal; 3. Comply with the "Regulations on the Management of Registered Constructors".
Ten. 6. A copy of the certificate of any of the circumstances listed in the false search in Article 17. If a copy of the above materials is submitted, the copy shall be stamped with the official seal of the enterprise currently employed by the applicant, and the original shall be submitted at the same time, and the original shall be returned to the applicant after verification. Standard:
The application materials are complete and in line with the statutory form of job responsibilities and authority: check the application materials in accordance with the acceptance standards. If the standards are met, it will be accepted, a Notice of Acceptance will be issued to the applicant, and the application materials will be transferred to the examiner.
If the application materials do not meet the standards but there are errors in the application materials that can be corrected on the spot, the applicant is allowed to correct them on the spot; If it cannot be corrected on the spot, a "Notice of Supplemental Materials" shall be issued to the applicant, informing the applicant of all the contents that need to be corrected at one time, and returning the application materials to the applicant. If the application does not fall within the scope of the authority of the organ or does not need to obtain an administrative license, a "Decision of Inadmissibility" shall be issued to the applicant, which is the answer to how long it takes to cancel the registration of a first-class constructor and re-register.
-
The registration of a Class 1 constructor can only be transferred after 1 year after the initial registrationIn addition, it is also required that the holder can not have more than two transfers of registration within a year, and the consent of the original unit is required to be transferred out, and a new registration unit is required to receive.
1. Registered in the original unit for one year;
2. If the economy has been transferred, there shall not be more than two transfers of registration within one year;
3. The original registration unit must agree to change and transfer out;
4. There is no other certificate (such as: supervision, cost) certificate of the Ministry of Construction registered in the original employing unit.
5. The registration certificate and practice promotion chapter of the original unit must have been obtained;
6. The construction department where the original unit is located agrees to change the transfer-out;
7. There must be a new registered receiving unit.
1. The builder provides the name, identity and old certificate number, qualification certificate number, personal builder system login password, and the general initial password is seven zeros. Log in to their personal system on the China Constructor Network.
2. After the login is successful, the application is changed to the new unit, and then the original work organization agrees to transfer out of the enterprise, and the new unit agrees to accept it.
3. The new unit shall print out the application form for change, and the original provincial department of the first-level original unit shall be sealed, and the original construction committee of the second-level original unit shall be sealed.
4. The new unit shall submit information to the provincial department (level 1) or the construction committee (level 2). In addition, the problem of stamping is generally for the builder to stamp himself and carry all the materials. If someone else helps to stamp the seal, the builder needs to provide the original ID card.
The original ID card of the builder is required for both the initial and transfer of information.
5. There are two issues that need to be paid attention to in the transfer, one is to see whether the continuing education of the builder has expired and whether the unit accepts it. The second is to see whether the original unit of the talent needs to provide social security certificate from the new unit.
1. The dismissal certificate and professional ethics certificate of the original employing unit;
2. A copy of the first-class registered construction engineer qualification certificate of the constructor;
3. A copy of the registration certificate of the first-class registered constructor of the constructor himself;
4. A copy of the ID card of the builder himself;
5. A copy of the academic certificate of the builder himself;
6. A copy of the professional title certificate of the builder himself.
-
The applicant for the initial (additional) registration of the first-class constructor certificate shall submit the following materials:
1. Application Form for Initial (Additional) Registration of Class 1 Constructor.
2. The applicant's valid ID card (military ID, police officer ID, passport), academic certificate, qualification certificate (returned after verification) and photocopy, and a copy of the registration certificate shall be provided for additional registration, and the original registration certificate and seal shall be handed in.
3. The original and photocopy of the employment labor contract signed between the applicant and the employing enterprise or the certificate of labor, personnel and wage relationship issued by the applicant's enterprise (to be returned after verification).
4. A copy of the copy of the qualification certificate of the employing unit where the applicant belongs.
5. If the applicant is not registered in the original qualified unit, he or she shall also issue a certificate of job transfer (proof of termination of the employment contract with the original employing enterprise or expiration of the employment contract, and retirement certificate of the retiree).
6. Three recent one-inch bareheaded sheets of the same version of the declarant (two of which are posted on the application form, and the other is posted on the back of the name and unit on the attached table 2** paper).
The first part of the application materials should be bound into a book as an attachment to the application materials and make a cover.
7. The summary table is automatically generated and printed on the network and submitted separately.
-
How long does it take to re-register?
It takes 20 days to re-register! Time limit for the preliminary examination of the district and county construction committee: 10 working days for initial registration, additional registration, and re-registration; Time limit for review by the Municipal Housing and Urban-Rural Development Commission:
5 working days for initial registration, additional registration, and re-registration; Time limit for decision: 4 working days for initial registration, additional registration, and re-registration; Time limit for notification: 1 working day (excluding publicity, announcement and delivery period).
The following information is required for re-registration of Constructor I:
1. Application Form for Re-registration of Constructors;
2. Copies of qualification certificates, academic certificates and identity certificates;
3. A copy of the employment labor contract signed between the applicant and the employing enterprise or the certificate of labor, personnel and wage relations issued by the employing enterprise;
4. Copies of supporting materials for meeting the requirements of continuing education.
5. Construction system professional technology, practitioner qualifications, enterprise qualifications and award recommendation approval supervision form.
I hope to help you better register as a constructor, of course, after starting to practice, you should also pay attention to continuing education, and the new policy on continuing education for first-class constructors must be understood and prepared in advance.
-
Re-registration takes about 20 business days to complete.
1. Time limit for the preliminary examination of the district and county construction committee: 10 working days for initial registration, additional registration and re-registration; 5 working days for the alteration, cancellation of registration, replacement of lost or defaced replacement of registration certificate.
2. Time limit for review by the Municipal Housing and Urban-Rural Development Commission: 5 working days for initial registration, additional registration, and re-registration; 3 working days for the alteration of registration certificate, cancellation of registration, replacement of lost or defaced replacement.
3. Time limit for decision: 4 working days for initial registration, additional registration, and re-registration; 1 working day for the change of registration certificate, cancellation of registration, replacement of lost or defaced replacement.
4. Time limit for notification: 1 working day (excluding public announcement and delivery period).
-
The review time for re-registration and initial registration is the same.
The whole process of registration does not need to submit paper materials, and the registration process is completed through the online system.
-
It takes about 3 months to register for the first-class constructor certificate. The particularity of the registration of first-class constructors has increased the time for approval, from the declaration of the local supervision station to the provincial construction department, from the provincial construction department to the Ministry of Construction, from the Ministry of Construction to the construction department and then to the local middle needs an old cycle and process.
1. Application Form for Initial Registration of First-Class Constructors.
2. The original and photocopy of the qualification certificate, graduation certificate and identity certificate, two two-inch **, and the personnel who pass the additional examination shall provide the original and copy of the qualification certificate and two two-inch **. (The content of the copy must include: certificate number, professional category, and date of approval).
3. A copy of the employment labor contract signed between the applicant and the employing enterprise or the certificate of labor, personnel and wage relations issued by the applicant's enterprise.
4. If the application for initial registration is overdue, a copy of the proof materials for meeting the requirements of continuing education shall be provided.
1. Preliminary examination. After the first-level constructor selects the registered enterprise, he prepares the registration materials to apply to the municipal competent department. The application materials submitted include the construction engineer certificate, employment contract, certificate of no violations, etc., and the preliminary review time of the municipal department is about one month.
2. Final review. After the preliminary examination by the municipal competent department, the relevant departments will hand over the materials of qualified personnel to the provincial management department. The registration management department will re-check the materials to ensure that the conditions of the builder who wants to register pass the customs, which will take about 1 month.
3. Publicity. After the final review by the registration administration, a public notice will be issued to inform which builders have passed the initial registration review. However, if you want to complete the initial registration and get the registration certificate and practice seal, it is generally one month after the publicity.
Due to the actual situation in different places, the review requirements and processes for the initial registration of constructors are also different, but if constructors want to successfully complete the initial registration, they need to go through these steps, so the initial registration time is mostly about 3 months.
-
The system shows that the acceptance is 20 days from registration to registration... This kind of answer doesn't know the ** quietly accompanied the hail to copy over the n years of chaos before the sailing...
1. The first thing is to meet the requirements for registration. >>>More
pwd=2d72
pdf, a construction [electronic version of the textbook] vip year a construction railway-construction engineering society-the past five years of real question analysis class-Wang Shuonan, a construction document summary, electronic textbooks, past questions, -a construction [municipal practice] "22 edition of the textbook change 5%".pdf, 2021 "Civil Aviation Airport" real questions and answer analysis. pdf Year of Yijian Mining - Xuetian Net School - Intensive Intensive Lecture Class - Huang Haigang, Yijian [Engineering Economy] "22nd Edition Textbook Change 5%". >>>More
Hello, the specific situation of the cancellation of the first-class constructor is as follows: the cancellation of registration is generally the termination of the cooperative relationship between the holder and the affiliated unit, and the cancellation of the registered constructor of the original unit. The premise of registration is that you need to find a unit, and there are many scenarios for the cancellation of registration of first-class constructors, and the department that mainly handles the cancellation procedures is the provincial construction department. >>>More
After submitting the application for change of registration in the Class 1 Constructor Registration Management System: >>>More
Difference Between Level 1 Constructor and Level 2 Constructor.