What fire protection facilities need to be installed in the 600 square meter song and dance hall

Updated on society 2024-04-09
4 answers
  1. Anonymous users2024-02-07

    The 600-square-meter song and dance hall must be equipped with a fire hydrant system, an automatic sprinkler system, a smoke prevention and exhaust system, and an automatic alarm system.

    There are several specifications listed, all of which are suitable for reference.

    Set up a sprinkler site:

    Singing and dancing casinos set up on the first, second and third floors and with a construction area of 300 square meters on any floor or 4 or above or underground.

    Set up smoke prevention and exhaust places:

    1. Set in.

    Song and dance halls on the first, second and third floors with a room construction area of more than 200 square meters;

    2. Song and dance halls set up on the 4th floor or above or underground, semi-underground;

    3. an atrium; 4. Evacuation walkways with a length of more than 40 meters above ground in other buildings;

    5. Underground and semi-underground buildings with a room construction area of more than 50 square meters;

    5. Above-ground rooms larger than 300 square meters in public buildings;

    6. Inner walkways larger than 20 meters in public buildings.

  2. Anonymous users2024-02-06

    Simple sprinkler, emergency lights, fire extinguishers, at least 2 safety exits, fire doors if there is a partition.

  3. Anonymous users2024-02-05

    Fire extinguishers, fire doors, etc. are required.

    According to Article 12 of the Fire Protection Law of the People's Republic of China, song and dance halls, theaters, hotels, restaurants, shopping malls, bazaars and other places where the public gathers shall be declared to the local public security and fire protection agency before they are used or opened, and they can only be used or opened after passing the fire safety inspection.

    If mass activities such as large-scale gatherings, fireworks shows, and lantern festivals are held with fire hazards, the organizers shall formulate fire extinguishing and emergency evacuation plans, implement fire safety measures, and report to the public security and fire protection agencies, and only after the public security and fire protection agencies have passed the fire safety inspection of the event site.

  4. Anonymous users2024-02-04

    Shanghai Panda Home Decoration reminds you:

    Ballrooms are public crowded places, in accordance with the provisions.

    Article 9 The fire protection design and construction of construction projects must conform to the national fire protection technical standards for engineering construction. Construction, design, construction, engineering supervision and other units shall be responsible for the fire protection design and construction quality of construction projects in accordance with the law.

    Article 10 In accordance with the national engineering construction fire protection technical standards for construction projects that need to carry out fire protection design, except as otherwise provided in Article 11 of this Law, the construction unit shall, within seven working days from the date of obtaining the construction permit in accordance with the law, submit the fire protection design documents to the fire protection agency of the public security organ for the record, and the fire protection agency of the public security organ shall conduct spot checks.

    Article 11 For large-scale crowded places and other special construction projects specified by the public security department, the construction unit shall submit the fire protection design documents to the fire department of the public security organ for review. The fire department of the public security organ shall be responsible for the results of the audit in accordance with the law.

    Article 12 If a construction project shall be subject to fire protection design review by the fire department of the public security organ in accordance with the law, if it has not been reviewed in accordance with the law or the audit is unqualified, the department responsible for examining and approving the construction permit shall not give the construction permit, and the construction unit and the construction unit shall not carry out the construction; If other construction projects fail to pass the random inspection in accordance with the law after obtaining the construction permit, the construction shall be stopped.

    Article 13 After the completion of the construction project that needs to be designed for fire protection in accordance with the national technical standards for fire protection in engineering construction, the fire protection acceptance and filing shall be carried out in accordance with the following provisions:

    1) For the construction projects provided for in Article 11 of this Law, the construction unit shall apply to the fire department of the public security organ for fire protection acceptance;

    2) For other construction projects, the construction unit shall report to the fire department of the public security organ for the record after acceptance, and the fire department of the public security organ shall conduct spot checks.

    Construction projects that shall be subject to fire protection acceptance in accordance with the law are prohibited from being put into use if they have not been accepted for fire protection or are unqualified for fire protection acceptance; If other construction projects fail to pass random inspections in accordance with law, they shall be stopped.

    Article 14 The specific measures for fire protection design review, fire protection acceptance, filing and random inspection of construction projects shall be prescribed by the public security department.

    Article 15: Before public gathering places are put into use or operated, the construction unit or user unit shall apply to the fire department of the local people's ** public security organ at or above the county level where the venue is located for fire safety inspection.

Related questions
7 answers2024-04-09

Suppose a bottle of sewing agent is 400ml, and the house is paved with 800*800 bricks, and a bottle can hit 20 square meters, then 100 square meters need 5 bottles of 400ml sewing agent. It is recommended to use Keshun home waterproof M200 green dazzling sewing agent, which has the following advantages: high-quality raw materials, clear taste and environmental protection; The color matching is fashionable and the color lock is long-lasting; Stain-resistant, easy to clean, bright and beautiful. >>>More

3 answers2024-04-09

Hello, the demand of the dehumidifier is not allocated according to the power, and the specific situation has specific requirements. It is not that the greater the power, the better the dehumidification effect, the dehumidification effect of the dehumidifier and the quality of the dehumidifier are inseparable, and the power of each brand will be different in the case of the same dehumidification amount. (The dehumidifier of the electric tiger brand can't afford to hurt it). >>>More

7 answers2024-04-09

First of all, it is necessary to emphasize that the landlord, scientifically speaking, is called the fire resistance grade, not the fire rating Then I am also pleased that you can have such a fire awareness, because in this way our work will be reduced, if every boss is like you. Hehe, I've been in the fire brigade for almost a year I'll briefly explain it below, there are two ways to get a very authoritative answer 1Ask your local fire department directly (before the construction work opens, this is an unconditional free consultation) 2 >>>More

13 answers2024-04-09

The material of the ventilation duct is not the same, the ventilation duct has a white iron sheet with single-sided galvanized and double-sided galvanized, **are not the same, they are all made of the size of An, **look at the material, one square meter is not expensive more than 70 packages of public package materials. The labor cost of ventilation duct installation is determined according to the difficulty of on-site construction How much is a square meter, it is recommended to find the manufacturer to ask for specific **. Generally, it is necessary to combine their own needs in order to determine the specific**. >>>More

11 answers2024-04-09

The cost of renovating a house of 50 to 60 square meters varies depending on the region and the style of decoration. Generally speaking, decoration costs include design fees, construction costs, material costs, furniture costs, etc. >>>More