How to control the budget for hydropower transformation, and how to control the budget for hydropowe

Updated on home 2024-04-28
12 answers
  1. Anonymous users2024-02-08

    The owners love to renovate their homes.

    At the time, it is necessary to be in line with the fact that the place that should not be saved must not be saved, and the hydropower transformation.

    It is a big project, to plan and control this budget, Tuba Rabbit summed up some tips on how to control the cost of hydropower renovation.

    1.Strict budgeting against drawings.

    2.Each gate is well controlled to avoid rework. Such as the kitchen.

    and toilets. of waterproof, ground.

    buried water and electricity pipes, such as floor tiles.

    After the construction was completed, it was found that the waterproof was unqualified and the wire pipe.

    If the road is blocked, the plumbing pipe is not working, or the water is leaking, then you have to rework. Washer.

    Floor drain. It is best not to seal the floor drain with deep water, because the water is too slow to meet the needs of the washing machine. Strong and weak wires.

    Not within the same pipe, there will be interference. The concealed conduit should be fixed firmly, otherwise the wall is easy to crack. The cost of water and electricity renovation is higher than that of the renovation company.

    **, mostly because at the beginning, the decoration company will say that the cost of water and electricity renovation is subject to the actual amount, **is only a rough estimate, that is, the decoration company in order to let the decoration owners choose them, most of them will be very low.

    3.Preparation of the new house before construction.

    Hydropower construction. Previously, consumers can first do an insulation test on the original wire, and if there is no problem with the test, and the wire diameter meets the requirements, it can not be replaced. Consumers should not believe the words of some decoration company construction personnel "developers use inferior wires, which are easy to leak", or ask friends or professionals around them before making their own judgments.

    Hydropower renovation is the largest hidden project in home renovation.

    It is also one of the items that will often increase the cost in the decoration process, so it is necessary to carefully do the homework of water and electricity renovation, listen to your own opinions in your own home, and have a good idea and grasp in your heart. We will do a good job of improving this project in a down-to-earth manner.

  2. Anonymous users2024-02-07

    Hydropower renovation is the largest hidden project in home decoration, and it is also one that will often increase the cost in the decoration process, so we must carefully do a good job in hydropower transformation, listen to our own opinions, and have a number and grasp in our hearts. We will do a good job of improving this project in a down-to-earth manner.

  3. Anonymous users2024-02-06

    The cost of water and electricity renovation is different according to different regions and the difficulty of the room type, and it is necessary to communicate with the repair company of the type shelter. Clause.

    1. Strict budget according to the drawings Before signing the decoration contract, the designer is required to show the water circuit transformation drawings, and strictly calculate the number of wire transformation, power socket transformation, switch panel transformation, waterway transformation, cable TV line transformation, and network cable transformation according to the drawings, and calculate a reasonable cost to avoid excessive additional costs. When giving the bottom, the location of hydropower also needs to be determined one by one at the scene, and it is best to record the direction of the line and water pipe with ** or video. It turns out that the developer will be equipped with some sockets, decide in advance whether to replace them, if not, let the workers remove them and keep them themselves, otherwise they often don't know who damaged them in the end, and they need to buy again.

    The placement of lamps in each room should also be determined first; Leave more power outlets in the kitchen; Think about how many air conditioners to install in advance, whether they are cabinets or hang-ups, so as to decide the location of the sockets; It is necessary to think about the reserved lamp position, bath bomb position, kitchen flue position and future inspection port; If you have surround speakers, you should reserve the exit of the audio cable opposite the TV wall in the living room for the last surround speaker; The bathroom should be set up with a water outlet for washing dun cloth, and if you want, you can buy a dun cloth pool; It is best to determine the overall cabinet before the start of construction, so as to facilitate the transformation of water pipes and gas pipelines in the future. Before starting work, workers should be asked to determine the wall distance between the toilet and wash basin in the bathroom, so that there is enough time to choose the right bathroom facilities. Clause.

    Second, the mid-term acceptance to avoid rework such as kitchen and bathroom waterproofing, ground buried water and electricity pipelines, if the floor tile construction is found to be unqualified, wires and pipelines are not passable, plumbing pipes are not open or leaking, it can only be reworked. It is best not to use deep water to seal the floor drain of the washing machine, because the water is too slow to meet the needs of the washing machine. Strong and weak wires cannot be in the same pipe, there will be interference.

    The concealed conduit should be fixed firmly, otherwise the wall is easy to crack. The cost of water and electricity renovation is higher than that of the decoration company, mostly because at the beginning, the decoration company will say that the cost of water and electricity renovation is subject to the actual amount, which is only an approximate estimate, that is, the decoration company will put the ** very low in order to let the decoration owners choose them. Third:

    Preparation before construction Before the construction of the new house, consumers can first do an insulation test on the original wires, if there is no problem with the test, and the wire diameter meets the requirements, it can not be replaced. Consumers should not believe the words of some decoration company construction personnel that "the developers use inferior wires and are easy to leak", or make their own judgments. Summary:

    Before signing a contract with the decoration company, the designer must calculate the cost of installing water and electricity for a link, and it is always better to have a bottom in mind, and then analyze the specific situation.

  4. Anonymous users2024-02-05

    Recently, I often hear the owners who have renovated complaining there, saying that the actual cost of hydropower renovation is often much more than the original budget, but I don't know the reason, why the hydropower renovation is over the budget? What is the correct opening of the hydropower transformation? Today, let's popularize why hydropower renovation exceeds the budget and the correct opening of hydropower transformation.

    1. Water and electricity renovation in the living room and bedroom.

    The living room and bedroom basically need electrical appliances such as switches, wall lamps, water dispensers, televisions, air conditioners, etc. Among them, the main details of hydropower transformation are:

    1. It is necessary to budget the design location and number of ceiling lamps in advance.

    2. The height of the TV wall hanging, according to the height of the owner and the sofa to determine a suitable position.

    3. If you want to design a bedside wall lamp in the bedroom, you should determine the location of the wall lamp in advance.

    4. The choice of air conditioner should be considered in advance, whether it is a practical cabinet or a wall-mounted form.

    Second, kitchen water and electricity transformation.

    The appliances that are often used in the kitchen are refrigerators, microwaves, rice cookers, range hoods and sinks, among which the details of kitchen water and electricity renovation are:

    1. The style of the range hood is different, and the requirements for the socket are also different, so when choosing a range hood, you must make a short comment in advance what kind of socket the range hood is.

    2. The water heater needs to determine whether it is an electric water heater or a gas water heater, and the specifications of the selected water heater should be determined, and the water heater manufacturer should come to the door to mark the outlet, water inlet, socket and control panel location on the wall in advance;

    3. The water and electricity in the kitchen is determined according to the cabinets, so before the kitchen water and electricity transformation, the location of the cabinets should be determined, and there are design drawings or marked on the wall.

    4. The refrigerator can be considered to leave a separate road from the distribution box, so that when you go out, all the power can be cut off at home except for the refrigerator, which is safer.

    5. The kitchen can not use the plug-in board, so prepare a few more sockets, the main purpose is to facilitate the addition of some small household appliances in the future.

    3. Toilet water and electricity renovation.

    The basic furniture and appliances in the bathroom are clear: water basin, toilet, washing machine, bath bomb mirror headlamp. Among the details that need to be noted are:

    1. To determine the specifications of the bathtub and toilet in advance, if the bathroom is a shower room, you must first figure out whether it is a simple shower screen or a closed shower room in front of the cluster, whether there is a base, whether there is a floor drain nearby, and where the water outlet is.

    2. Is the bath bomb warmed by air or lamp, and whether it has an exhaust fan. Generally, the lamp heats about 5 wires, and the wind heater varies from house to house, generally 3-8 wires. The style function is different, which determines the number of wiring roots, so please ask the merchant in advance.

    3. For the handwashing station, reserve a power supply to charge the hair dryer or shaver.

    4. Whether the toilet is intelligent, the smart toilet needs to be connected to the water pipe (drinking water pipe), and there must be a power socket.

  5. Anonymous users2024-02-04

    It should not be easy to control, at this time we should adjust the entire installation process, and we must control the installation process to control the hydropower transformation.

  6. Anonymous users2024-02-03

    If you want to have good control, then in this case, you should pay attention to the whole process of this installation should be mastered, and then there are some related electricity skills should be understood, so as to save yourself money.

  7. Anonymous users2024-02-02

    Generally speaking, it can't be controlled, unless there are a lot of people in the industry, so there will be this**, there are few people in the industry, so ** will be relatively high.

  8. Anonymous users2024-02-01

    As long as you don't call the decoration company to do it, it will not be resisted very strongly, the most pitted people by meter settlement, if you settle by meter, the wiring method is horizontal and straight, multi-loop, pit to your doubt life, it is recommended to cloth less circuit, point-to-point walking method is more affordable and safe, waterway transformation includes water pipes, hot water pipes and other pipes, among which the water pipe charges are usually about 35-65 yuan per meter; If you punch holes in the load-bearing wall, you will charge about 50-60 yuan each, and about 30-50 yuan for each non-load-bearing wall.

    This kind of billing is in line with the large-scale transformation of hydropower and electricity, and if there is time, you can only contract labor and materials, which can save some material costs. Because of the large changes in water and electricity, it is best to pay attention to the direction of the pipe, it is best to take pictures for the later installation of punches, and there is another point, that is, the girder should not be perforated during the transformation, or it is not suitable for personal living habits, but it is difficult to know how to prepare a budget. Today, let's talk about how to calculate the cost of empty shed decoration and water and electricity transformation?

    First is the cost of labor, then the cost of materials for waterways and circuits.

    Change the drainage pipe, 110, 75, 50 pipes, 110 estimated 10 meters, 75 pipes estimated 20 meters, 50 pipes 10 meters ** in about 300 pieces, elbows, tees, glue, fiberglass mesh about 100! In fact, when many houses in rural areas are renovated, the water and electricity renovation is very simple. Where you need a socket, you can connect it diagonally from the nearest socket opening slot; If you are a little more particular, you may change the dual control switch in the bedroom.

    **: There are generally two ways for decoration companies; First, it is calculated according to the construction area within the room (one square *** construction area), which is more realistic. Second, according to the actual length of the wiring (one meter *** total length) transformation as one of the most important hidden projects in the whole home decoration, it determines the future of water and electricity problems.

    Therefore, the materials in this area cannot be saved, and the project cannot be hastily completed in order to save time. **Second, in the future, the maintenance party Zheng Collapse is the third, all of which are indispensable.

  9. Anonymous users2024-01-31

    If you want to control the transformation of hydropower, you can buy materials by yourself, and then find professional workers to carry out construction, only in this way can you control the transformation of hydropower.

  10. Anonymous users2024-01-30

    The best thing to do is to opt for an all-inclusive model with a renovation company, which has cheaper materials and can save costs.

  11. Anonymous users2024-01-29

    It should be controlled from the material, you can buy some ** cheaper materials.

  12. Anonymous users2024-01-28

    Now the second-hand housing market is hot, which has brought a series of surrounding markets, among which the significant hydropower project transformation. Hydropower renovation is a problem faced by most second-hand houses, some second-hand houses are older, the lines are aging and the replacement is troublesome, so it is more prudent to carry out hydropower engineering transformation at the beginning of installation. So do you know what the budget for the renovation of basic hydropower projects is?

    This issue of Weixiang article will give you a rough introduction to how much is the budget for the renovation of basic hydropower projects, and the specific amount is subject to the actual decoration.

    1. Reconstruction of basic hydropower projects in the spring of mountain oak - waterway transformation.

    Waterway renovation is also a "colorful" part of the water and electricity installation expenditure, and the householder must pay special attention. Among them, the data of waterway reconstruction are: 60 yuan per meter for concealed 20pp-r water pipes, and 45 yuan per meter for 20pp-r water pipes surfaced.

    In addition, the sewer installation of 50pvc pipes** is 60 yuan per meter. It should be noted that the pipe is Weixing or Jinde pipe, and the sewer is Liansu pipe.

    Second, the basic hydropower project renovation budget - strong electricity installation materials and **.

    In the installation of strong electricity, among the materials required, no more than 3 wires are threaded in the flame retardant electrical pipe, otherwise once the number of 3 is exceeded, 5 yuan per meter will be added. At the same time, there is no joint in the wires in the pipe, and the distribution box is used at the branch. The switch socket bottom box is similar to the weak installation material, but more than 4 square wires add 10 yuan per meter, and the excess part should also be added to the home decoration budget.

    In addition, if there is a situation of multiple pipes in the same slot, the construction team will charge according to the number of dark lines. Among them, the general price of the dark pipe is 35 yuan per meter, and the open pipe is 25 yuan per meter. The materials include PVC wire, thickened cold-bent pipe, wire, etc.

    Third, the basic hydropower project renovation budget - negotiate the slotted and non-slotted **.

    In the installation of home improvement water circuits, slotted and non-slotted ** are not the same. Slotting is the opening of a notch where there is no notch, and the line or pipe is placed in it. Without slotting, the wires and pipes are directly installed outside the wall, and then isolated by insulating objects, and the amount of slotting is relatively large.

    Of course, there will also be companies that subdivide the slotting into two types: "non-load-bearing wall slotting and load-bearing wall slotting", so the installation must be determined before laying the line and pipeline, so as to discuss the respective **.

Related questions
8 answers2024-04-28

1.Circuit modification: square single-strand copper core wire for lighting. >>>More

4 answers2024-04-28

Hydropower is a relatively large part of the profit of the double repair company, and it is common to exceed the budget. >>>More

11 answers2024-04-28

Renovation does not necessarily require water and electricity renovation, but if it is a rough house, it is recommended to hire a plumber to carry out water and electricity renovation, because some of the sockets, switches and water outlets set up by the developer are often incomplete or do not meet the owner's preferences. >>>More

9 answers2024-04-28

The space area of the villa is relatively large, so the whole hydropower design process involves a lot of hydropower line transformation, if the location of the hydropower line is not renovated, it will directly affect the normal life of the owners. What are the precautions for hydropower transformation? Let's explain it to you! >>>More