  1. Anonymous users2024-02-08

    Approval by the technical person in charge of the enterprise.

    The project manager is responsible to the company manager and to the project department.

    Responsible for the quality of the construction undertaken. Implement the company's quality policy.

    and the goal of fully fulfilling the project contract. Participate in the contract review organized by the company's management office, and make contract disclosure to the project business personnel. Report to the company's business department to propose major changes to the contract review requirements, and be responsible for the implementation of the review.

    Organize and formulate the progress of the project.

    and labor, materials, construction machinery and equipment use plan, respectively, reported to the relevant functional departments of the company for review, approval of material procurement plan. According to the construction machinery and equipment use plan, organize the construction machinery to enter the site, arrange the personnel with the operation certificate to work, and establish a list of qualified operators.

  2. Anonymous users2024-02-07

    Construction plan. It is first reported to the technical person in charge of the enterprise for approval, and then reported to the director for review; For special construction plans that exceed a certain scale, they can only be implemented after being approved by the expert group. That is, the technical person in charge of the enterprise will first approve it, and then report it to the director for review and then demonstrate.

    Divisional Engineering. The degree of construction danger is divided into three categories: general construction risk, large construction risk, and major construction risk. The project management department should be based on the engineering characteristics of the project, combined with the unit project.

    The characteristics of the middle division project define the degree of construction hazard.

    Each project management department shall establish a branch project account with greater construction risk and major significance.

    For dangerous branch projects, special safety construction plans should be prepared, including foundation pit support.

    and dewatering engineering, earthwork excavation engineering, formwork engineering, lifting and hoisting engineering, scaffolding.

    engineering, temporary power engineering, etc.

  3. Anonymous users2024-02-06

    The general construction plan is first submitted to the technical person in charge of the enterprise for approval, and then submitted to the director for review; For special construction plans that exceed a certain scale, they can only be implemented after being approved by the expert group.

  4. Anonymous users2024-02-05

    First approved by the technical person in charge of the enterprise, and then submitted to the director for review and certification.

  5. Anonymous users2024-02-04

    It should be demonstrated first and then reported to the superintendent.

  6. Anonymous users2024-02-03

    It is not a foundation pit enclosure, of course, the foundation pit construction area must be enclosed, and the enclosure does not need to be demonstrated by experts to be a deep foundation pit support.

    It is not a plan review, but a demonstration of a special construction plan for safety, and a demonstration of a 'special plan' that has reached the content scope of Annex II of the construction quality [2009] 87 document "sub-projects with greater risk than a certain scale".

    The process of demonstration is clearly stipulated in the article [2009] 87: first, the spirit of the document is thoroughly understood, and according to the content and order specified in the document, the technical person in charge of the project department shall prepare a special safety construction plan according to the actual situation on site, and submit it to the enterprise (company) technology, quality, safety and equipment department for approval, and shall be approved and signed by the chief engineer of the enterprise; Then, according to the provisions of the document, more than five experts from the expert database are invited to demonstrate, and the relevant personnel participating in the meeting shall comply with the provisions of the local housing and urban-rural development commission; After the demonstration is passed, the "plan" shall be revised and improved and then submitted to the enterprise for approval, and after being submitted to the construction party and the director for review and signature, it can be disclosed for implementation, and reported to the safety supervisor for the record before implementation. The expert argumentation is also in accordance with the requirements stipulated in the article [2009] 87.

    I am a member of the expert pool, and I have conducted it nearly 200 times, if you have specific questions that you don't understand, please call and answer by name!

  7. Anonymous users2024-02-02

    The members of the expert group are determined by random selection from the list of experts in relevant specialties in the bid evaluation expert database. The construction unit cannot designate itself or designate the expert members to participate in the bid evaluation committee in disguise.

    Provincial-level people's and relevant departments shall set up a comprehensive bid evaluation expert database.

    Article 46 In addition to the special bidding projects specified in the third paragraph of Article 37 of the Tendering and Bidding Law, the expert members of the bid evaluation committee shall be determined by random selection from the list of experts in the relevant professions in the bid evaluation expert database. No unit or individual shall designate or indirectly designate the expert members to participate in the bid evaluation committee in any way, whether explicitly or implicitly.

  8. Anonymous users2024-02-01

    Generally, Party A's supervision is responsible for the organization, and the specific situation is referred to.

  9. Anonymous users2024-01-31

    2. The project leader or technical person in charge of the construction unit, the project director engineer of the supervision unit, the technical person in charge of the project of the survey and design unit and related personnel are invited to participate.

  10. Anonymous users2024-01-30

    1. Design disclosure, that is, design drawings. This is under the auspices of the construction unit, by the design unit to the construction units (civil construction units and professional construction units) to make a disclosure, mainly to explain the functions and characteristics of the building, the design intention and requirements and the building in the construction process should pay attention to the various matters.

    2. Construction design disclosure. Generally, it is organized by the construction unit, and under the guidance of the professional engineer of the management unit, it mainly introduces the problems encountered in the construction and the parts that often make mistakes, so that the construction personnel understand what to do, and how to stipulate the specifications.

    3. Disclosure of special plans, sub-projects, quality (safety) technology, operations, etc.

  11. Anonymous users2024-01-29

    The role of the technical disclosure is mainly to let the construction personnel understand the technical points, operation content, quality standards, safety precautions, etc., in the form of written, oral, pre-shift meetings, individual notices in various forms.

  12. Anonymous users2024-01-28

    The same category is divided into: overall technical disclosure, unit engineering technology disclosure, branch engineering technology disclosure, and sub-project engineering technology disclosure; Different types are divided into: construction technology disclosure and safety technology disclosure.

  13. Anonymous users2024-01-27

    Encyclopedia of construction engineering technology.

  14. Anonymous users2024-01-26

    Before the start of the construction project, it is necessary to prepare the construction organization design, prepare a special plan for the sub-project with greater risk, and conduct expert demonstration for the sub-project with greater risk than a certain scale.

    After the construction plan is approved, the technical person in charge should make a safety technical disclosure and sign by the person who receives the bottom, so that the work is carried out according to the procedure, and once there is a problem, you can reduce the greater responsibility.

  15. Anonymous users2024-01-25

    The plan needs to be reported to the supervisor and the owner, and then the on-site engineer will make a technical disclosure to the construction team according to your plan.

  16. Anonymous users2024-01-24

    It can be organized and implemented only after being signed by the technical person in charge of the construction unit, the project director and the engineer of the construction unit, and the project leader of the construction unit. If the general construction contracting is implemented, it shall be signed by the technical person in charge of the general construction contractor and the relevant professional contractor.

    According to the "Measures for the Safety Management of Sub-projects with Greater Risk".

    Article 8 The special plan shall be reviewed by the technical department of the construction unit to organize the professional and technical personnel of the construction technology, safety, quality and other departments of the unit. If it is qualified after review, it shall be signed by the technical person in charge of the construction unit. In the case of general construction contracting, the special plan shall be signed by the technical person in charge of the general contractor and the technical person in charge of the relevant professional contractor.

    The special plan that does not require expert demonstration shall be submitted to the supervision unit after being approved by the construction unit, and shall be reviewed and signed by the project director and engineer.

    Article 9 The special plan for the sub-project with greater risk exceeding a certain scale shall be organized by the construction unit to convene an expert demonstration meeting. If the general construction contracting is implemented, the general construction contractor shall organize and convene an expert demonstration meeting.

    Article 12 The construction unit shall revise and improve the special plan according to the demonstration report, and shall be signed by the technical person in charge of the construction unit, the project director and the engineer of the project, and the project leader of the construction unit before it can be organized and implemented.

    If the general construction contracting is implemented, it shall be signed by the technical person in charge of the general construction contractor and the relevant professional contractor.

  17. Anonymous users2024-01-23

    It will be implemented after the approval of the chief engineer.

  18. Anonymous users2024-01-22

    First of all, it is not procedurally legal.

    For critical projects exceeding a certain scale, expert argumentation shall be organized, and construction shall be organized according to the conclusions.

    If there is no organization of experts to demonstrate unauthorized construction, in addition to the responsibility of the problem, the first is the management responsibility, and the organizer is derelict in his duties.

    Of course, I have also done more than the scale of the dangerous project, 9 meters of high-level cross-sectional area of the beam (gymnasium, steel structure roof), without organizing expert demonstration, measures in place, no problems, the consequence is the smooth completion of the construction.

  19. Anonymous users2024-01-21

    For this question, it is necessary to confirm it according to the year in which it is located. If it is true that before 2017, a special construction plan needs to be prepared for a sub-project with a greater risk of exceeding a certain scale, and the special plan needs to be signed by the technical person in charge of the construction unit and stamped by the construction unit after expert demonstration; Then the chief engineer signs and stamps the supervision practice seal; Finally, it also needs to be signed by the project leader of the construction unit, which is the signature of the "three generals" mentioned before. However, after 2018, the relevant specifications are revised, and the signature of the project leader of the construction unit is no longer required, that is, the signature of the "two generals", if the "three generals" are involved after 2018, it is because there is a situation of the general contractor and the subcontractor, if the special project is implemented by the subcontractor, the technical person in charge of the subcontractor is required to sign, the subcontractor seals, the technical person in charge of the general contractor signs, and the general contractor seals; Signed by the director of the supervision unit and stamped with the practice seal.

    So, the above question should pay attention to the year. The domestic construction field is currently very chaotic, there are some regulations changing every year, and the problems in the construction field emerge one after another, the people in the construction management department in order to get rid of responsibility, like ants on a hot pot, both want to obtain vested interests, but also do not want to take responsibility, so the relevant regulations, change back and forth, there is no clear, fixed provisions.

  20. Anonymous users2024-01-20

    No, in accordance with the provisions of the construction quality 2009 [87] document, the construction unit shall organize expert demonstration, and the construction unit supervision unit shall participate, and the opinions of the expert demonstration shall be revised and supplemented and submitted to the director for approval before implementation.

Related questions
12 answers2024-04-22

What kind of high-speed is the new car pulling! Friend, do you want your car to be scrapped early? Don't take the word of those old drivers for it. >>>More

35 answers2024-04-22

With the baby's physical development, giving the baby milk alone can no longer meet the nutrients needed for the baby's growth, at this time parents will choose to add some complementary foods to the baby to increase the baby's body nutrition. >>>More

17 answers2024-04-22

Use loose powder after applying makeup. Because after applying makeup, when used to set makeup, it will make the makeup last for a long time and prevent the makeup from falling off due to the secretion of oil and sweat. Its delicate texture can make ** smooth and smooth. >>>More

26 answers2024-04-22

I think this situation can be taken back because you didn't know that she was in two boats at the time, and she was cheating on your feelings by hiding that you already have a boyfriend and accepting your phone. You buy a mobile phone with invoices and your shopping records, and it's useless for her to cheat if she wants to.

9 answers2024-04-22

The year 1279 B.C. is probably the reign of one of the three kings of the Shang Dynasty, the 18th, 19th, and 20th generations of the Shang Dynasty, because the historical record is inaccurate and ambiguous. More reliable is the 18th king Nan Geng, who reigned for 28 years, around 1279 BC. The 18th king of the Shang Dynasty was Nan Geng, the 19th king was Yang Jia, and the 20th king was the famous Pan Geng