The processes required for decoration are also interlocking, what is the order of interior decoratio

Updated on home 2024-04-23
17 answers
  1. Anonymous users2024-02-08

    The interior decoration first smashes the wall, installs water and electricity, and finally paints the wall, lays tiles, and cleans the hygiene.

  2. Anonymous users2024-02-07

    Interior decoration is generally to decorate the floors and walls first, and then choose furniture.

  3. Anonymous users2024-02-06

    Interior decoration is generally to install the lights and wiring first, and then the overall design.

  4. Anonymous users2024-02-05

    Interior decoration is generally the first installation of lights, measurements, and inspection and installation of water circuits.

  5. Anonymous users2024-02-04

    It should be the most common thing to do from the inside out, because it's the most convenient.

  6. Anonymous users2024-02-03

    Let's go from the outside to the inside, so that the next step of decoration can not be hindered.

  7. Anonymous users2024-02-02

    Generally, it is cleaned first, and then the measurement and inspection and installation of the water circuit are carried out.

  8. Anonymous users2024-02-01

    Please, don't ask the Internet about people who can be found in the real world. Because even if you ask, it is a group of people who are no different from you to ask your questions, and in the end you still need to find the relevant personnel for decoration!

  9. Anonymous users2024-01-31

    The process of interior decoration is very cumbersome, and the processes required for decoration are also interlocking.

  10. Anonymous users2024-01-30

    The general order of renovation is as follows:

    1. Demolition and reconstruction of the main body.

    The main demolition and renovation is the first project in the decoration, mainly including wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows and so on. The garbage after demolition and modification should be cleaned out in time to ensure the cleanliness of the room and make it more convenient for future construction.

    2. Renovation of waterway circuits.

    Before the water and electricity renovation, the cabinet designer should come to the door to make the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate a renovation plan. It is also best to send someone to design the location of the power supply and interface according to the model you choose. The air conditioner and its power supply should be placed on the wall at the head of the bed as much as possible to avoid the situation where the air conditioner is blowing directly at people.

    3. Paste wallpaper.

    After the wall paint is painted, the oiler will brush the base paint in the place where the wallpaper needs to be pasted, and it can generally dry the next day, and then you can paste the wallpaper.

    4. Install the socket panel.

    The socket panel can be installed in about half a day, and it should be noted that the socket is best bought with a switch function, especially in the kitchen, so that the rice cooker and microwave oven can be plugged and unplugged from the power supply, and it can be controlled with a switch.

    5. Install cabinets.

    The cabinet is a matching project, and the range hood, stove and sink should be purchased in advance, and it is best to send it on the same day and install it together with the cabinet.

    6. Install the finished door.

    The finished door should be installed before the floor, mainly because of the complex steps of installing the door, hinges, door locks, door stoppers, door frames, etc., there are many tools used.

    7. Install hardware.

    It is recommended that before installing the floor, the drying rack, curtain rod, lamps, sanitary ware, bathroom and other fragmented items with a lot of ash scattered during installation are installed, if the procedure is reversed, it is likely to cause wear and tear to the floor.

    8. Install the floor.

    Before installing the floor, it must be leveled, and the ground must be cleaned, and it must not be cleaned with water. It is better not to cut the floor in the house, but to cut it in the hallway, so that you can clean the hallway at the end.

  11. Anonymous users2024-01-29

    First, the preliminary design.

    To decorate a house, the first thing is to start with the design, the designer has a detailed understanding of your entire family situation and the house type, and their own ideas and opinions should be clearly communicated with the designer to avoid some unnecessary troubles in the later stage. In addition, after the design is out, it should be checked, and the unsatisfactory places should be adjusted in time.

    Second, the main body of demolition and reform.

    At the beginning of this step, even if the construction stage is officially entered, the main demolition and modification should be carried out in accordance with the design plan, and the framework of the construction site should be built first. The main body demolition and renovation package Dongqing wheel includes wall demolition, wall building, shoveling wall skin, etc.

    3. Hydropower transformation.

    Hydropower renovation is the most important step in the decoration process, and many houses in life will have hidden dangers left by hydropower projects that are not up to standard. Therefore, this part of the construction must be careful to avoid unnecessary troubles in the later stage.

    4. Carpentry engineering.

    Carpentry is a complex process, of course, carpentry can also be handled as a key part of the main modification, and there is no conflict with the hydropower transformation, and sometimes there will even be some cooperation. Carpentry is the type of work to complete various wooden works in the house, and the labor cost accounts for 40-60% of the entire decoration labor cost.

    5. Masonry engineering.

    Masonry engineering is the tile step that everyone is more concerned about, as well as the wall, the ground, the area of waterproof engineering, etc., the poor construction quality of this project is also directly related to the appearance of the decoration, and the waterproof quality is directly related to the quality of life after moving in.

    6. Painting works.

    When it comes to the painting project, it generally marks the end of the hard decoration part, which mainly includes wall surface treatment, batch scraping putty, grinding, brushing latex paint, etc. The painting project is a face-saving project, but if it is not done well, there will be various troubles in the later period, such as wall cracking, paint peeling, etc.

    7. Finished product installation.

    This step is to install various furniture and household appliances, such as switch and socket installation, lamp installation, hardware and sanitary ware installation, curtain installation, household appliance installation, etc.

  12. Anonymous users2024-01-28

    Under normal circumstances, the construction sequence of the decoration project is: building structure transformation, water and electricity wiring, waterproof engineering, tile paving, carpentry production, wood painting, wall finishing, floor paving, water and electricity installation, equipment installation, pollution control, sanitation and cleaning, auspicious day occupancy. The construction sequence of each type of work in home decoration is:

    Bricklayer, Plumber, Plasterer, Carpenter, Painter, Plumber, Equipment Installer, Pollution Control Worker, Cleaner. When formulating specific construction procedures, attention should usually be paid to basic principles such as overall arrangement, finished product protection, and safety and environmental protection.

    Customary procedures during construction——

    1) Civil renovation stage.

    Enter, tear down the wall, build the wall;

    Customized doors, cabinets, bath cabinets, furniture, radiators, etc. for initial measurement and design;

    chiseling trunking, hydropower transformation;

    Concealed hydropower renovation project of buried trunking;

    Do waterproof engineering, and do a 24-hour closed water test on the bathroom (kitchen) floor;

    Bathrooms and kitchens are attached to walls and floor tiles;

    Custom-made doors, cabinets, bath cabinets, furniture, etc. are measured.

    2) Grassroots treatment stage.

    carpentry entry, hanging ceiling, gypsum line;

    Wrap door covers, window covers, and make wooden cabinet frames (except for custom-made);

    Synchronous production of various wooden doors and modeling doors (except for custom-made);

    Wooden panels brushed with dustproof paint (clear oil);

    window sill marble countertop leveling;

    Wood veneer pasting, line making and fine installation;

    wall base treatment, grinding, leveling;

    Furniture, doors and windows are pasted with stickers (protective edges) on the seams.

    3) Detailing stage.

    Paint the wall at least three times, first two times;

    Furniture paint entry, nail holes, paint;

    treatment of corners, laying floor tiles, doorway stones;

    Flooring and underfloor to prevent formaldehyde, mold, and germ contamination of the floor;

    Custom-made doors, cabinets, bath cabinets, furniture, radiators, etc.;

    installation and commissioning of lamps, switches, sockets, sanitary ware, handles, door locks, pendants, etc.;

    The last pass of wall paint;

    Cleaning and sanitation, floor tile repair, and withdrawal;

    Preliminary acceptance within the decoration company;

    The three-party appointment time is formally accepted and delivered to the owner.

  13. Anonymous users2024-01-27

    1.Choose coatings with excellent performance.

    When choosing coatings, we should be clear about what requirements we want to achieve when choosing coatings, such as water resistance, high gloss, don't blindly choose, there is also a big gap in the types of water-based coatings.

    Shuaike chemical interior wall coating resin.

    2. Estimate the dosage before buying paint.

    Many consumers do not estimate the amount of paint used in advance, for fear of buying less paint, and always buy more when purchasing. This may cause a waste of materials, increase the cost of home improvement, and at the same time, the accumulation of too much paint will also have a certain impact on construction safety. Therefore, it is recommended that consumers must look at the area of the construction area before construction, so as to estimate the amount of materials purchased.

    3. The construction preparation process needs to be done well.

    Water-based building exterior wall paint resin.

    Paint dripping will stain the furniture during construction, so paste color separation paper at the junction of doors, window frames and furniture before painting to protect it from dripping paint that is difficult to clean.

    4. Wall paint construction tips.

    Different tools will bring different effects, for example, the roller brush is divided into two kinds of thickness, and the bristles are also different from wool and chemical fiber, and the painting effect of different brushes varies greatly.

  14. Anonymous users2024-01-26

    Hello dear, I'm glad to answer for you, I'm your exclusive ** answer teacher, thank you for your patience! Decoration is to ask which link to do or which process to do, is to ask which link. The steps and processes of decorating a house can be roughly divided into four links, which are:

    Design, construction, installation and finishing. There are seven important steps in the decoration of a new house: the first step is to measure the design of the house and determine the best design scheme; The second step is to smash the wall and build a new building, so as to maximize the use of space; The third step is to determine the location of water and electricity in the room; Fourth, the masons enter the site, lay the floor sock board tiles, etc., and pay attention to the waterproofing of the kitchen and bathroom balcony; The fifth step, carpentry into the field, ceiling and make cabinet frames; Sixth, the painter enters the site and paints the furniture; The seventh step, the installation process, the home with the group into the field.

    <> you can click on my avatar to follow me, and if there are new questions in the follow-up, you can consult me again, if my answer is helpful to you, please also give a thumbs up (in the lower left corner of the evaluation), look forward to your like, your efforts are very important to me, and your support is also the driving force for my progress. Looking forward to serving you again. Good luck to you:

    Have a good life and all the best! Peace and joy!

  15. Anonymous users2024-01-25

    Decorating a house is a very complex project, so let's take a look at the order of decorating a house.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  16. Anonymous users2024-01-24

    Decoration sequence: the first step is hydropower renovation and waterproofing, please plumber, look at your new house, put forward your intentions, talk about **, he provides pipes and wires and other materials variety quantity, and then they start hydropower transformation, water transformation is basically the same, electrical transformation is diverse, mainly including moving or increasing switch sockets, lighting, one lamp double control, etc., after the completion of water and electricity to do kitchen and bathroom waterproofing. The second step is to ask the bricklayer to stick bricks, walls, etc., the bricklayer provides the amount of cement, sand and tiles, and prepares the materials themselves, and the bricklayer sticks the bricks, including some plugging leaks, anyway, all the work belonging to the bricklayer is completed.

    The third step is carpentry, the carpenter proposes the variety and quantity of materials according to your requirements (renderings, intentions, opinions), and prepares the materials by yourself, which starts after the bricklayer finishes the work and the room is dry. During the period, window sills and kitchen covers can be customized. The fourth step is that the woodworkers make putty and spray paint the furniture, and there is no such process for using oil-free boards.

    The walls of the room are putty leveled, or scraped or sprayed with latex paint or pasted wallpaper. Step 5: Install the switch and socket lamps after they are dry. It's a general process, and there are some details in between, so let's learn by doing, it's not difficult, and I wish you success.

  17. Anonymous users2024-01-23

    The decoration process is generally to change the plumbing and electricity first, including the adjustment of the position and layout of the kitchen and bathroom water pipes, and then it is necessary to pave the floor tiles and wall tiles, and then the ceiling of the house includes the living room, bedroom, study, dining room, kitchen and bathroom and the ceiling of the balcony, and then the door and mouth of the wall are painted, and the last step is to install lighting.

Related questions
9 answers2024-04-23

If you are looking for company 1, the designer will go to the site with you to measure the room, if you have a floor plan and you really want to find a company to decorate, then you had better take the designer to the site to have a look. 2, the designer will give you a plane plan + budget (the budget depends on the water and electricity, the house with 100 square meters of water and electricity is about 8,000 to 10,000, and the guerrillas will be cheaper than this), and you can also ask for the budget to be the master. (Some companies also give you the renderings, the general company has to charge for the renderings, because there is a kind of draughtsman's profession) 3, if the negotiation is done, the budget is accepted, the basic plan is also done, you want the company to decorate you, then you have to pay a little deposit (2000 5000 yuan) 4, and then the designer gives you the renderings, the construction drawings to you confirm, and so you finally confirm that you have to sign on the drawings, if the company wants to construct, it will be constructed according to the company you signed 5, If you are ready to decorate, you can ask the decoration company to give you construction, the company is divided into plumbers, masons, carpenters, painters in turn, and you also need to pay about 40% of the budget for the first time. >>>More

12 answers2024-04-23

The process of wall treatment for the decoration of new houses: >>>More

6 answers2024-04-23

Spread it first, and spread the collected fresh leaves evenly on the bamboo plaque or bamboo mat, with a thickness of no more than 2cm, and the time is 3 4 hours. At the same time, old leaves, single leaves, scales, sundries, etc. should be removed to ensure the clarity of raw materials. >>>More

3 answers2024-04-23

Electronic Kanban is a new type of electronic Kanban composed of LEDs, electronic Kanban adheres to the design idea of Kanban in JIT, breaks through the traditional way of kanban white paper and black letters, adopts electronic methods, integrates single-chip microcomputer technology, optoelectronic display technology, fieldbus technology, flexible layout, content can be changed at any time, is one of the main equipment in the real-time production management system of Shanban, It is fully applicable to the production management of all walks of life. >>>More

7 answers2024-04-23

Summer is here, and it's time for tofu flowers to shine Here is an introduction to the production process, friends who like it can try it Ingredients: soybean water gluconolactone, which is sold in domestic chemical raw material stores or flavor and fragrance stores, white crystals, similar to coarse salt. 1. The practice of tofu brain If you have a soymilk machine, it is really not difficult. >>>More