What process is required for interior design and decoration

Updated on home 2024-03-23
9 answers
  1. Anonymous users2024-02-07

    If you are looking for company 1, the designer will go to the site with you to measure the room, if you have a floor plan and you really want to find a company to decorate, then you had better take the designer to the site to have a look. 2, the designer will give you a plane plan + budget (the budget depends on the water and electricity, the house with 100 square meters of water and electricity is about 8,000 to 10,000, and the guerrillas will be cheaper than this), and you can also ask for the budget to be the master. (Some companies also give you the renderings, the general company has to charge for the renderings, because there is a kind of draughtsman's profession) 3, if the negotiation is done, the budget is accepted, the basic plan is also done, you want the company to decorate you, then you have to pay a little deposit (2000 5000 yuan) 4, and then the designer gives you the renderings, the construction drawings to you confirm, and so you finally confirm that you have to sign on the drawings, if the company wants to construct, it will be constructed according to the company you signed 5, If you are ready to decorate, you can ask the decoration company to give you construction, the company is divided into plumbers, masons, carpenters, painters in turn, and you also need to pay about 40% of the budget for the first time.

    One of the things to pay attention to is that the budget is to see if there are missing items (missing items, the budget is low, and if the budget is low, you may accept it before, and once you accept the missing items, it will be added while constructing). After the renovation is completed, you can withhold a detention fee, which is generally available in regular companies. Of course, if you're a liar, you don't even think about any of the above...

  2. Anonymous users2024-02-06

    Customary procedures during construction——

    1) Civil renovation stage.

    Enter, tear down the wall, build the wall;

    Customized doors, cabinets, bath cabinets, furniture, radiators, etc. for initial measurement and design;

    chiseling trunking, hydropower transformation;

    Concealed hydropower renovation project of buried trunking;

    Do waterproof engineering, and do a 24-hour closed water test on the bathroom (kitchen) floor;

    Bathrooms and kitchens are attached to walls and floor tiles;

    Custom-made doors, cabinets, bath cabinets, furniture, etc. are measured.

    2) Grassroots treatment stage.

    carpentry entry, hanging ceiling, gypsum line;

    Wrap door covers, window covers, and make wooden cabinet frames (except for custom-made);

    Synchronous production of various wooden doors and modeling doors (except for custom-made);

    Wooden panels brushed with dustproof paint (clear oil);

    window sill marble countertop leveling;

    Wood veneer pasting, line making and fine installation;

    wall base treatment, grinding, leveling;

    Furniture, doors and windows are pasted with stickers (protective edges) on the seams.

    3) Detailing stage.

    Paint the wall at least three times, first two times;

    Furniture paint entry, nail holes, paint;

    treatment of corners, laying floor tiles, doorway stones;

    Flooring and underfloor to prevent formaldehyde, mold, and germ contamination of the floor;

    Custom-made doors, cabinets, bath cabinets, furniture, radiators, etc.;

    installation and commissioning of lamps, switches, sockets, sanitary ware, handles, door locks, pendants, etc.;

    The last pass of wall paint;

    Cleaning and sanitation, floor tile repair, and withdrawal;

    Preliminary acceptance within the decoration company;

    The three-party appointment time is formally accepted and delivered to the owner.

    4) Move-in preparation stage.

    Furniture entry; All kinds of electrical products and curtains, fabrics and other accessories enter the market;

    Preliminary sanitation and cleaning;

    Remove the remaining decorative materials and wipe off the volatile decorative substances, such as paint, glue, etc.;

    Indoor air quality testing will be carried out 7 days after the completion of all decoration or before moving in;

    Carry out the necessary comprehensive indoor air pollution control;

    The use of charcoal in charcoal to assist in removing air pollution and odor inside furniture;

    overall hygiene and cleaning;

    Choose an auspicious day for the zodiac to move into your home.

  3. Anonymous users2024-02-05

    1. Geotechnical: wall, tile, floor tile, etc.

    2. Electrician: wiring, water pipes, switches, etc. (You can follow up in three or four days after the earthwork enters the site) 3. Carpentry: furniture.

    4. Painter: furniture painting, wall painting.

    These are the 4 major processes, and the rest can be done according to your preference.

  4. Anonymous users2024-02-04

    First of all, it is best to ask a professional and good character friend or decorator to check for you, which is the best. Let him give you a good quality.

    The water and electricity are installed, are you sure that all of them are installed? All the lines that should be taken? Strong electricity?

    Weak? Plumbing? Otherwise, it will be very troublesome to change it in the future.

    Then you can call the plasterer to lay the floor tiles and the kitchen and bathroom tiles. Install everything in the kitchen and bathroom, and these can be done at the same time.

    Then you can ask the carpenter to come in, the ceiling, the modeling, the background wall. As well as doors, shoe cabinets, wardrobes, computer desks, bookcases, TV cabinets, and window theft lines, of course, if these furniture go to the furniture store to buy, you can wait until the renovation is completed before moving in.

    After the carpentry is finished, the painter enters the field, including scraping putty on the top of the wall, rolling wall paint, and pasting wallpaper. If the furniture is made by a carpenter, you have to paint the furniture. Remember, if you buy the door, you can install it before the painter rolls the wall paint.

    Don't install the door before the painter comes in, as the door will get dirty from the painter.

    When the painter is done, he can install lights, switches, sockets, and lay wooden floors. I hung [curtains and furniture.] There may also be some touch-ups by the painter.

    That's pretty much it. Remember, after the completion of each type of work, it is best to do a sanitation and personal acceptance before the next type of work enters the site. Moreover, there is no absolute order between the various types of work, and they must be carried out in cooperation with each other.

    Don't worry, as long as you invite a master with good art, the decoration is not so scary. Keep your eyes peeled. Be sure to hire a master with good character.

    If you arrive, be kind to him, don't put on a show. That way you won't have a headache and you'll be happy because you have a new home.

  5. Anonymous users2024-02-03

    The decoration process is generally to change the plumbing and electricity first, including the adjustment of the position and layout of the kitchen and bathroom water pipes, and then it is necessary to pave the floor tiles and wall tiles, and then the ceiling of the house includes the living room, bedroom, study, dining room, kitchen and bathroom and the ceiling of the balcony, and then the door and mouth of the wall are painted, and the last step is to install lighting.

  6. Anonymous users2024-02-02

    Process:1First out of plan.

    In general, it is best to start decorating only after mastering the process of decoration, after all, decorating a house is a systematic project. When the owner gets the key to the new house, he needs to judge what kind of living facilities he needs through the structure of the house and the general spatial layout. It is worth noting that in the process of making a plan, it is best to express some of your ideas to the designer, so that the house design plan is more in line with your requirements.

    2.Hydropower retrofit.

    The most important point in the process of decoration is the hydropower project, because this is not only related to the convenience and practicality of future life, but more importantly, the water and electricity are directly related to the safe living environment of the family, so when decorating, we must do a good job of water and electricity adaptation according to the location of the electrical appliances in the decoration plan and the place where water is needed, so that life is more convenient and comfortable. In addition, it is necessary to strictly supervise the quality of hydropower projects and some related hidden dangers, detect and solve them as soon as possible, and ensure that life is lived and worked in peace and contentment.

    3.Laying floor tiles or painting walls.

    The second thing to pay attention to is the cleanliness of the ground and wall when laying floor tiles and painting the wall. Because some companies paint the wall first and then lay the floor tiles, from top to bottom, the bricks will not be dirty; And some companies lay bricks first and then paint the walls, so that sometimes I use a cutting machine or the like to dirt the walls when laying bricks. In this way, some irresponsible companies will make some places too dirty or some other problems, resulting in the owners of the later cleaning is very troublesome.

    4.Installation of doors and curtains, bathroom and kitchen supplies.

    In addition, the firmness of the installation of doors and windows, the style of the ceiling and the safety of the decoration are all more important in the decoration, and the owners should pay enough attention and attention. There are also some problems in the installation details should also be paid attention to, and the quality of the installation project should be checked by yourself to avoid problems after installation and use for a period of time.

    Precautions: 1. No matter how environmentally friendly the paint is, there is pollution, and the volatilization of formaldehyde and other pollutants in the paint is a long process, and it may still volatilize after 10 years.

    2. In the process of selecting materials, some details should not be missed, such as hardware and faucets. You can't save where you should spend money.

    3. The necessary documents must be kept when purchasing things, so as to ensure that the possible returns and exchanges in the later stage can be dealt with more easily.

  7. Anonymous users2024-02-01

    1. If there is a need to demolish and rebuild the wall, it will be carried out first; Then modify the water, electricity, and pipes. These include fixed switch sockets, hot and cold water pipes as required, wires, aluminum-plastic pipes for water pipes, and PVC pipes for wires.

    2. After the water and electricity acceptance is qualified, the carpenter enters the site, and the cement workers and kitchen and bathroom walls are waterproofed and tiled. Carpentry includes hanging ceilings, making various cabinets, decorating walls, doors, window covers, etc.

    3. After the carpentry is completed, it is the varnish on the wood veneer and the ceiling wall plaster, and the latex paint is brushed. Wood veneer environmental protection paint about 8 times, ceiling wall plaster to depend on its flatness, the general house is smoother about 3 times, the worse one is 6-8 times, the batch of ash is leveled after brushing environmental protection latex paint, general Nippon paint, ici brush 3 times, Dulux brush 2 times.

    4. After the ceiling wall is treated, start to lay floor tiles or wooden floors. The ground should be leveled first, now the flatness of the general house is enough, if the poor need to do the leveling of cement mortar, in addition to laying solid wood floors to use plywood to lay the base, spread moisture-proof cotton, and then pave the wooden floor, and the composite wood floor generally does not need a large floor, can be paved directly.

    5. After the above projects are completed, the rest is to install sanitary ware and lamps.

  8. Anonymous users2024-01-31

    Enter the area and get the decoration for free**].

    Usually people need to follow the construction process when decorating the house, so as to provide a high-quality living environment for the owners, today I want to share with you what is the interior decoration construction process and what are the precautions for interior decoration, friends who want to know may wish to take a look at it!

    1. What is the interior decoration construction process?

    First of all, according to the interior design drawing, the wall is demolished and the wall is built; The next step is hydropower engineering and ceiling slotting, and at the same time the pipe wiring; After that, carpentry works began, such as ceilings, cabinet installation, etc.; After that, install lamps, switches and sockets; Finally, install the paving, cleaning and sanitation of bathrooms, kitchen supplies, floor and wall materials, and the furniture can be entered.

    2. What are the precautions for interior decoration?

    1. Make a budget for the renovation project.

    According to the floor plan of the room, the owner can roughly determine the decoration requirements and facilities of each room, and make a list, and then estimate it according to the ** provided in the market as a reference.

    2. The decoration grade is different, and the budget is different.

    If you just want to decorate it simply, then several materials such as wall paint, wood flooring, wall and floor tiles can be calculated approximately. If you want to decorate more high-end, in addition to taking into account the basic project, you also need to plan the layout of the interior, and you also need to hire a designer, and the cost of decoration materials will be more expensive.

    3. Determine the budget for decoration materials.

    First of all, the owner and family members need to be consistent about one thing to decorate, such as: what kind of floor material to choose, what kind of function of each room, what kind of furniture to choose, etc. Then go to the major markets to have a general understanding, including:

    Wall coatings, wood floor materials, wall and floor tiles, sanitary ware, kitchenware, etc., so that you can make comparisons from them.

    Summary: The above is to share with you what is the interior decoration construction process and what are the precautions for interior decoration, I believe that you have a corresponding understanding after reading the above sharing, if you need to know more about relevant information, please continue to pay attention to Qeeka Home**, will answer for you one by one.

    Do the math how much it will cost you to renovate your home

  9. Anonymous users2024-01-30

    The specific process of interior decoration design is as follows:

    1. Make preparations before decoration. Preparation requires the preparation of some pre-designed documents. For example, design contracts and other matters must be handled properly. The aspirations and demands of both parties must be understood on the basis of public and fairness.

    2. Make targeted design plans. After fully understanding the relevant market conditions, it is necessary to collect the effect that the owner needs to decorate, and at the same time, the designer needs to investigate the posture environment of the construction site, make accurate judgments and start designing. The design here includes deepening, drawing drawings of the initial idea of the solution.

    At the same time, there should be more than one design scheme.

    3. Enter the construction drawing design stage. In the process of interior decoration and design, it is necessary to pay attention to the design of construction drawings. At this stage, the design scheme is revised and improved.

    In interior decoration and design, it is necessary for Wang Xiao to consider the production of construction drawings, and each professional proofreading can be implemented without any problems.

    4. Enter the construction stage. During the construction phase of the design drawings, the designer needs to let the construction party know how the design plan should be carried out to achieve the desired effect. During implementation, if there are some doubts in the process, the designer should save in time.

    Designers should make appropriate modifications according to the actual construction situation to ensure that the construction progress can be carried out normally.

Related questions
6 answers2024-03-23

Rural idyllic style, European and American, Chinese and Korean, Mediterranean, modern and simple.

6 answers2024-03-23

A lot of people have been asking this question lately!

Design Concept Style 2Consideration of house type analysis (environmental lighting, streamline, behavioral psychology, etc.) 3Spatial division and layout (explain the principles of spatial division and the benefits and rationale for such division) 4 >>>More

19 answers2024-03-23

The difficulty is not difficult, I am from Baotou Steel Design Institute, and I have cooperated with President Xiao Li of Hengxin on some projects. He is a person who pursues quality, to be precise, the quality of life. >>>More

15 answers2024-03-23

1. If it's just a personal hobby, learn a few commonly used software, generally ps cad 3dmax is enough, if there is a professional interior design software such as Yuanfang, you can fool people in about half a year. >>>More

23 answers2024-03-23

It can be said that interior design is mainly decoration design. Interior design encompasses and has a wider range of meanings. >>>More