-
I think if the situation is true, there is no way, there are three situations: 1, that is, the distribution box of the telecom near your home has been occupied, and each distribution box has capacity, such as 5 pairs, 10 pairs, 20 pairs, if it is really occupied to play, then he has no way to help you sign. This kind of you can discuss with a neighbor who has a fixed line near your home, and through his home's ** installation of broadband, you use the broadband, ** still use it.
You pay the cost, not the phone bill, and you negotiate the phone bill. 2.That is, the data port of the telecom room has been occupied, in this case, you have no way to solve it, and the installer has no way to solve it, so you can only wait for him to report the expansion of the data port.
3.It's a matter of distance, don't underestimate more than 100 meters, if more than 100 meters away from your home that should be the limit (general telecom broadband installation is within 3 kilometers from the computer room at most, but also depends on the quality of the main line), then he will not help you install, because the installation effect is not good, if you often drop the Internet line, you are not comfortable, and will trouble him, you can insist on signing if he will ask you to sign a disclaimer clause, then you have no guarantee for Internet access, there is no way to get on it, he will not give you maintenance, Surely you wouldn't choose this either. It is recommended that you call** ask the installer what kind of situation it belongs to, if the first one then depends on whether you can solve it yourself, if the second one is only waiting, if the third one is no way, but you can share it with your neighbor who has broadband, buy a router, pull the line.
If the situation is true, it will be considered invalid, because you do not have a landline and you are not a telecom customer. I used to do maintenance in telecom for a year and encountered this situation. Everyone is making money, the business hall wants a growth rate, and the maintenance staff wants to get a commission, and there is nothing that can't get along with money, right?
-
Call 10,000 to complain, if it can't be resolved, you can go to the court for public interest litigation, but it has little practical significance; Finally, there is another trick, give a gift to the installation master, 99% of which can be solved. It's not a nice word, but it's practical in a real society.
-
Find the ** of the installation master, just negotiate and deal with it privately, and it is not good to get stiff about anything.
Until you become a telecom user, it's useless for you to complain.
-
Summary. If the operator has accepted the user's application, but has not given the door-to-door installation, it is generally the local network has been covered, but the port may not be enough to expand the capacity, or some local operators in order to promise the user unconditional acceptance, after acceptance, it is found that the network coverage is not in place, which requires engineering construction, and the waiting time is long, if the user can not wait, the application can be revoked, or the operator can complain, to see if it can use its WLAN service first or use the reduced traffic card, etc.
If the operator has accepted the user's application, but has not been to the door-to-door installation, it is generally the local network has been covered, but the port may not be enough to expand the capacity, or some local operators have promised the user to accept the unconditional acceptance, and the network coverage is not in place after acceptance, which requires engineering construction, and the waiting time is long, if the user cannot wait, the application can be revoked, or the operator can complain. Check whether you can use the WLAN service or use the traffic branch card that reduces the fee.
I opened the account in the month of Siyou Chang was not at home at the time I looked for him to pull the network cable after a month, and he said that there was no port for me to wait, and so on until 7, in August, the bridge held me directly Min Moqing complained, saying that the expansion would be expanded in the past few days, and it has not been installed until now.
That has to be sent to the operator and they can complain that it must be installed by them.
Usually I also hit **, but it's dragging.
He didn't dare to delay <> complaint
You can only rush hard. The local business hall asked me to find a wire puller, and he also delayed today and tomorrow and the day after tomorrow.
It's just that the complaint has been delayed until now.
Ten days ago, I called ** to pull the net cable, he said that this Friday to expand the capacity and catch up with many days of heavy snow, this is not sincere to fool me.
Got an idea? Tell me to think about it.
Which Unicom do you use, Telecom or Mobile.
Or press another company.
-
Summary. Broadband has been delayed to install a broadband solution for me:
Go to the local business hall by yourself, find a staff at the counter, and apply for unsubscription or early installation.
How to solve the problem of not installing broadband.
Call customer service **10000, transfer to manual service, provide the address, and ask the customer service to help urge the staff to handle it; 2.Go to the local business hall by yourself, find a staff at the counter, and apply for unsubscription or early installation.
Call 10086 to move.
Unicom calls 10010.
-
There may be several reasons why telecom broadband installation does not come to the door for five days:
1.Complicated wiring engineering: The installation of telecom broadband needs to go through multiple devices, including optical fiber transmission, switches, etc., and this process may involve the planning and configuration of lines, so it takes a certain amount of time to complete.
2.Device limits or failures: If a telecom operator doesn't have enough equipment to meet the needs of users, or if some of the equipment fails, it can cause installation delays. At this point, telecom operators need to deploy equipment or repair faults in time to achieve a smooth installation.
3.Weather factors: Adverse weather conditions, such as heavy snowfall and heavy rain, may affect the installation progress. In this case, the installer may not be able to arrive at the installation site in time, resulting in a delay in installation.
Because the installer needs to go to the maintenance center to pick up the equipment and go to the user's location for installation, the distance will affect the timeliness of the installation.
5.Other factors: There are a few other factors, such as holidays, unexpected maintenance tasks, etc., that can also cause installation delays.
If your broadband installation has taken longer than expected, it is recommended that you contact your telecom operator's customer service directly to find out the specific installation progress and reason. If you are not satisfied with the technician's service, you can also apply for a replacement technician, or make complaints and suggestions so that the problem can be resolved in a timely manner.
-
Yes, if Telecom has a single broadband, a single broadband** does not require the user to have a Telecom mobile phone card, and the user can go to the telecom business hall with an ID card if he needs to handle it.
respective advantages: 1. Unicom's tariff is relatively low, but the network speed in the 3G era is fast, which can reach 21M, and even 42M in some cities;
2. The tariff of mobile is relatively better among the three operators, with good service and wide signal coverage, whether it is urban or rural signal;
3. The tariff of China Telecom feels comparable to that of China Unicom, the signal coverage is between China Unicom and China Mobile, and the CDMA2000 Internet speed at 3G is also between China Unicom and China Mobile. Triple Network Big Data is a leading Internet big data accurate customer acquisition access service provider in China, focusing on the application of accurate customer acquisition and providing accurate marketing value-added services. At present, the three networks big data connects tens of billions of accurate resources and user data in the data source database of communication operators, establishes a 9000+ interest tag system, and covers 90% of the mainstream consumer groups.
China Unicom's 5G advantages:
The industrial ecology is relatively mature, and the compatibility test between the terminal and the network is relatively sufficient, and the current compatible terminal brands include Huawei, ZTE, OPPO, vivo, Xiaomi, Nubia and other mobile phones. Moreover, China Unicom's 5G network supports concurrent services, and you can continue to watch movies while playing **. <>
-
Hello, please confirm the type of broadband is China Telecom Mobile or China Unicom broadband, and then contact the staff of the business hall. Then make sure that your home has the conditions to install broadband, that is, whether there is optical fiber to your building. Do you have a router in your home that goes through fiber?
1) Xunli oak line construction. If you don't have fiber in your building, you need to lay fiber to your building. If the business hall runs it, know whether your home is suitable for installation, and if it is an online and mobile service, they only charge money, regardless of whether they are qualified or not.
Line construction is not something that the installer can do, it is the construction and laying of the bureau. (2) Entrance routing, that is, how to wear optical fiber from the floor into your home, if there is a route, the installation master will bring the equipment, optical fiber laying, installation, and commissioning.
Standard wiring method: ** wire cat (wireless) router network cable in each room, because there is a distribution box, ** wire can reach each room, so any ** socket can directly use the splitter to connect the cat. >>>More
This is not necessarily, if you don't need to use a mobile phone card, you can directly choose to be broadband**, if you don't mind handling a telecom card, you can choose to fuse**, relatively speaking, the comprehensive tariff of fusion** is cheaper. >>>More
If users need to handle telecom broadband, they first need to know whether there are telecom broadband resources in the area, and users can go to the telecom business hall to understand, if there are telecom broadband resources, then directly in the business hall for broadband**, after the processing, there will be staff to install broadband, you can also handle broadband through the telecom online business hall. >>>More
Dear Telecom users, Hello!
According to your description, a wired broadband network cable is plugged into the wireless router WAN port, and then a network cable is used to connect directly to your laptop (or desktop) from the LAN port. Then open the browser, enter generally, or, (see your manual) enter the management and password, generally admin, enter the setup wizard, fill in step by step, according to your broadband** to make a choice, if it is adsl, you need to fill in the username and password, if it is a fixed IP address or not a fixed IP address of broadband, you have to fill in the necessary information, fill in all the way, very simple. For the security of data and wireless network, you go to the special wireless column to start the key, generally choose the wep method, fill in the key you want to set, pay attention to the number of key bits, see your page prompt, and then select the route in the route to restart, not manual power off, and then it's OK, search for the routing signal, enter your preset password everything OK! >>>More
At present, Shanghai Telecom has a high cost performance of 5G integration**, which can choose 129 gears, 169 gears, 199 gears, 299 gears, 399 gears, 599 gears, mobile phone** + broadband combination. >>>More