What conditions should the cost engineer have before he can be handy in the future work?

Updated on workplace 2024-04-16
9 answers
  1. Anonymous users2024-02-07

    Shandong Provincial Cost Engineer Examination: September 20 to September 21, 2008 For more information, please refer to the registration details.

  2. Anonymous users2024-02-06

    Reading drawings is the most basic, you have to form a 3-dimensional building in your mind, and you have to build it in your own mind. Next, memorize the rules of calculation, and read them, not rote memorization

  3. Anonymous users2024-02-05

    Learn the process of engineering cost officer:

    1. Basic drawing recognition: be able to read drawings, understand engineering drawings, be able to find the required data and other information from drawings, and master the skills of reading construction drawings and structural drawings; Proficient in reading construction drawings of architectural professions; Accurately comprehend the design intent; Learn to read structural drawings and architectural drawings and understand design instructions.

    2. Reinforcement calculation: master the reinforcement calculation methods such as columns, beams, plates, walls, foundations, stairs, etc.; Learn to correct quantities and modify nodes; Manual quick counting;

    3. Quota list and construction area: master the calculation method of formwork and concrete; Learn the rules of quota calculation, and compare the list quantity and the quota amount; Requirements: list pricing, quota group price, price adjustment full flow gauge blind range.

    4. Glodon software: master manual drawings; Proficient in CAD drawings for rapid import and drawing recognition; Sensitive and trapped fiber modeling calculation, group price adjustment.

    5. Fleishman software: master the basic operation of Fleish's bridge imitation software; Proficient in quota pricing, list import, compilation, **.

  4. Anonymous users2024-02-04

    Cost officer refers to the person who has passed the cost officer examination and obtained the qualification certificate of construction project cost and is engaged in project cost business.

    Cost Engineer Job Responsibilities:

    Prepare the material master plan of each project, including the specifications, models and materials of materials. In the material master plan, the main materials should be prepared according to the parts, and the consumables should be prepared according to the project.

    Responsible for the preparation of construction drawings of the project, settlement and quantity analysis, compilation and review of project subcontracting, settlement of labor layer.

    Prepare monthly project progress budget and material adjustment (according to the market ** or financial provision of the actual **) and timely report to the relevant departments for approval.

    Review the project progress budget of the subcontractor and labor layer (the technician approves the project quantity).

    Assist the finance department in cost accounting.

    Adjust budgets in a timely manner based on on-site design changes and visas.

    In the bidding stage of the project, make the budget in a timely and accurate manner and provide the best basis.

    Grasp the accurate market and budget, and adjust the forecast and settlement in a timely manner.

    Provide timely information on the work content of each labor layer as the basis for decision-making.

    Participate in the preparation of bidding documents, bidding documents and contract review, collect the cost information of each project, and provide a basis for bidding.

    Be familiar with the drawings, participate in the review of the drawings, raise questions, and be responsible for the remaining undiscovered problems.

    Participate in the review of labor and sub-contract contracts and provide comments.

    Establish a unit project pre-settlement, settlement and progress report ledger, and fill in the relevant reports.

  5. Anonymous users2024-02-03

    Cost clerk is a very professional position, but also a very comprehensive position. First of all, we must understand the construction, and secondly, we must be sensitive to the market such as materials and labor, and we must also have a financial foundation and good eloquence (just know how to talk about it). Of course, the most important thing is the ability of the project cost.

  6. Anonymous users2024-02-02

    1) Preparation and review of construction project investment estimates and project economic evaluation;

    B) the project estimates, budgets, completion (final) accounts, bills of quantities, project bidding (or control price), the preparation and review of bids;

    3) Adjustment of project changes and contract prices and calculation of claim costs;

    D) the construction project cost control at all stages of the project;

    5) Appraisal of project economic disputes;

    F) other matters related to the project cost business.

  7. Anonymous users2024-02-01

    The cost clerks are rotten on the street, and many undergraduate cost workers can't find jobs this year.

  8. Anonymous users2024-01-31

    You can go to the online school forum to communicate with everyone.

  9. Anonymous users2024-01-30

    In the project cost, there are many things that need to be paid attention to, which will affect the construction of the project and competition, so let's take a look at the details that the engineering cost engineer should pay attention to.

    1. Prefabricated slab beam concrete: slab girder head concrete, transportation and installation;

    2. a ridge line and a cover plate; Mostly sporadic parts!

    3. Some sporadic and small components of concrete are easy to miss;

    4. Calculation of concrete for structural column ring lintel formwork;

    5. Quick and easy closing nets set up when pouring different concrete grades;

    6. Some code requirements are also easy to miss, such as: when the wall length is more than 5 meters, a structural column should be added, and a pressure beam should be added when the wall height is more than 4 meters;

    7. Concrete flanging on the wall such as the bathroom.

    8. There is no detailed layout drawing, but the items mentioned in the drawing description. Such as structural columns of infill walls, masonry reinforcement, etc.;

    9. It is easy to leak the metal heat conduction pipe set in the large-volume concrete;

    10. The negative reinforcement distribution rib of the plate is easy to leak, because the drawing does not reflect it at all;

    11. There is another thing in the steel frame that is easy to forget, that is, the stool used to support the steel bar, which is also a large number in the actual construction.

Related questions
16 answers2024-04-16

1. Ideological and moral quality: love and dedication, dare to command correctly, dare to take responsibility, strictly abide by professional ethics, strengthen personality charm, honesty and self-discipline, improve the realm in self-examination, create a reputation in self-cultivation, people-oriented, honest and practical.

4 answers2024-04-16

An investigation report is a report written for a certain scientific research or social purpose, to go to a certain area to observe and understand, to study, think, and find out the essence and regularity. >>>More

11 answers2024-04-16

The first is to have an accepting unit, and the second is to have a high school (or equivalent) diploma. >>>More

6 answers2024-04-16

Now the conditions are relatively relaxed, and only need to register with the industrial and commercial bureau. As for the registration of the tax department, you can entrust a regular ** company to help you do it, the cost is cheap, and the time is short. >>>More

7 answers2024-04-16

I think that if you want to study abroad, you must first have an academic degree, and secondly, you must have money.