What will be the impact of the shutdown of the main material supply on the project?

Updated on society 2024-04-09
29 answers
  1. Anonymous users2024-02-07

    The impact is very large, on the completion of the project, the funding of the project, and the legal responsibility.

  2. Anonymous users2024-02-06

    Of course it has an impact, but don't you do it next? How do you produce the raw materials next or what's next?

  3. Anonymous users2024-02-05

    What kind of impact will the president's shutdown have on the project?

    This will definitely have a very serious impact, such as delays or stoppages of workers during the construction period.

  4. Anonymous users2024-02-04

    It will definitely affect the overall progress of the project

  5. Anonymous users2024-02-03

    In the management of engineering construction, in order to ensure the quality of raw materials, reduce the risk of market fluctuations to the contractor, and reduce the project cost to a certain extent, it has become a common practice to supply major building materials such as steel bars, cement, fly ash, and oil. In this process, there may be over-consumption and under-consumption of A's supply materials, and strict risk management is required.

  6. Anonymous users2024-02-02

    The shutdown of the project team will have an economic impact on the project, and the project cannot be completed smoothly, and the economic loss caused by us is very large, so we should make adequate preparations in advance.

  7. Anonymous users2024-02-01

    The suspension of the main material of the project will have an impact on the shutdown of the project, affect the smooth progress of the project, and even fail to complete the specified tasks due to the lack of main materials.

  8. Anonymous users2024-01-31

    Filling in the blanks of the main material of the project will have a great impact on the project, and these things are very normal and meaningful.

  9. Anonymous users2024-01-30

    In the case of a stoppage, it will have a great impact on the project and will affect the construction.

  10. Anonymous users2024-01-29

    The main materials are gone, which will seriously delay the construction period, and this is the impact.

  11. Anonymous users2024-01-28

    If the main material is stopped, then I think the whole project will definitely be forced to stop, and the impact will be decisive!

  12. Anonymous users2024-01-27

    What kind of impact will the project team have on the project? It will lead to the shutdown of the project and complete bankruptcy.

  13. Anonymous users2024-01-26

    The suspension of the project team will cause the project to be suspended and delayed, and the work will not be delivered on time.

  14. Anonymous users2024-01-25

    Chu Material Control listens to the impact that employees should calculate, that is, it has caused some very adverse effects on them, and I hope that these will not be stopped.

  15. Anonymous users2024-01-24

    The current project, its main material, and its platform will still have a great impact on the project, and we should pay more attention to and understand.

  16. Anonymous users2024-01-23

    President Mu's suspension will affect the progress of the entire project and the progress of the project, which will have a great impact.

  17. Anonymous users2024-01-22

    If the project is stopped, the project will definitely have an impact, and if there are no materials in the afternoon, the project will definitely be stopped.

  18. Anonymous users2024-01-21

    What will be the impact of the shutdown on the project? If the project team is suspended, it will have a fatal impact on the project.

  19. Anonymous users2024-01-20

    For details, please refer to the Order No. 56 jointly issued by the State and the Ministry of Finance on November 1, 2007, in which the third section of Chapter II of the Standard Construction Bidding Documents "Bidding Instructions" and the fifth article of the first section of Chapter IV "Materials and Engineering Equipment". You can also refer to the Model Construction Contract for Construction Projects (GF-1999-0201) issued by the Ministry of Construction and the State Administration on December 24, 1999.

  20. Anonymous users2024-01-19

    As long as Party A wants to, you can do it.

  21. Anonymous users2024-01-18

    Friend, you go to "Other Projects" and adjust the rate of "Employer's ** Material Fee" to"0"and your problem is solved!

  22. Anonymous users2024-01-17

    When entering the quota, choose not to enter the main material, so that the cost is the price without the main material.

  23. Anonymous users2024-01-16

    A material supply project can choose the simple tax calculation method, 1 million Liangpai collapse project should pay Hewu value-added tax = 1 million (1 + 3%) 3% = 29, should pay additional tax = ,

  24. Anonymous users2024-01-15

    1. A for materials: refers to the owner, that is, the construction unit (the construction unit is not the construction unit, that is, the unit that pays the money) directly ** materials, and the owner carries out the material plan according to the construction unit. When the owner and the construction unit settle, they will deduct the cost of materials from the project payment.

    2. A control materials: most of them are mentioned in railway construction, which means that the owner has formulated a first-class business scope for some materials, that is, these materials must be products provided by some first-class merchants approved by the owner, and the products provided by the first-class merchants without the approval of the owner are not allowed to be used in the construction of the project even if they meet the requirements of engineering technology. The control here refers to the scope of Party A's control.

    3. B purchase and self-procurement: to the effect that the construction unit allows the construction unit to purchase by itself, but the requirement is that the design and construction technology needs must be met. For some construction units with complex organizational structures, there may be two-level or multi-level project management, for example, there is a project manager department (bureau level), and there are several branches (company level), so that it is two-level management, which may produce a situation

    The procurement of the bureau-level project department is called B purchase, and this "B" is called for Party A's "A", because after all, it is the bureau-level project department that can deal with Party A, and the subordinate branches are not qualified to deal directly with Party A. The materials that can be purchased directly by the branch can become self-picking, called self-procurement, and if there is its own construction team (contractor team) under the branch, it may also produce self-procurement by the construction team.

    4. Main materials: refers to the main materials in the main body of the project, which are some bulk materials, materials with greater value, and key materials that affect the cost of engineering materials. Generally includes:

    Steel (including steel bars and section steel), cement, local materials (river sand, gravel, etc.), in addition to some materials determined by some special engineering structures, such as steel strands and tensile tools required by large-scale prestressed structures, Bailey sheets used in large-scale steel structure bridges, mainly for large-volume concrete structures and admixtures and fly ash, waterproof materials such as waterstops and waterproof plates should also be considered in tunnel construction, and the cost of fuel materials and accessories must be considered when earthwork excavation projects are the mainstay. Whether it is classified as the main material can be determined according to the specific situation of the project.

    5. Low value: It is the abbreviation of low value consumables, which basically refers to materials other than the main material. It mainly includes some hardware, electrical materials, plumbing parts, accessories, tools, small machines, labor protection supplies and so on.

    The above A supply, A control, B purchase and self-procurement are divided from the perspective of who will purchase and provide, and the main material and low value are from the value level, that is, the impact on the cost of engineering materials.

  25. Anonymous users2024-01-14

    A for the supply refers to the designation of your project by Party A, your unit can not participate in the contract, Party A refers to the contract, Party A stipulates a number of **business, your unit from these designated bidders, the winning bidder** B purchase, self-mining, this does not know, it may be that you choose your own **business, your own bidding, the winning bidder**, the main material is not very clear, there are steel, floor materials, pyrotechnics, what else to forget.

  26. Anonymous users2024-01-13

    Party A provides the main material, Party B supplies the secondary material, and the VAT invoice is issued by itself.

  27. Anonymous users2024-01-12

    Do you do the bidding as a construction company** or do the budget estimate for the entire project as Party A?

  28. Anonymous users2024-01-11

    The main materials suitable for the first supply are mainly the equipment with a clear quantity and easy to control. Such as: fire pumps, fire fans. For example, galvanized steel pipes, wires and cables are more variable and are not suitable for a supply.

  29. Anonymous users2024-01-10

    1. Fire pump and control cabinet; 2. a valve; 3. Hot-dip galvanized steel pipe; 4. a fan; 5. a fire hydrant box; Alarm host and field equipment.

Related questions
6 answers2024-04-09

The main materials include: floor tiles, floors, lamps, sanitary ware, cabinets, wallpaper, wall coverings, stone, curtains, doors (including wardrobe doors, bookcase doors), large hardware (door locks, pendants in the kitchen and bathroom), stair handrails. >>>More

3 answers2024-04-09

When decorating, the order of the main material needs to be carried out in accordance with the decoration process. First of all, it is usually the water and electricity renovation materials, including wires, switches and sockets, water pipes, etc., which are the work that needs to be completed after the wall renovation and before the wall treatment. Secondly, it is waterproof materials, such as waterproof coatings, waterproof tapes, etc., which are mainly used in toilets, kitchens and other areas that need to be waterproof. >>>More