-
There are too many,,Hehe,There are a lot of them on the Internet.,Look for it yourself.,,The main thing is to match the actual situation.,It's not very useful to copy it.
-
Design Institute, Hangzhou Geological Exploration Institute, is also in our company to do 9001 certification, our company in Hangzhou, if you are interested in you can find us, or Q2495238043, in addition, the documents you need are to be done with the actual situation of your company, it is impossible to find exactly the same, the general manual, the program file is relatively simple, the operation document is to refer to, the usual work of the things to describe in words. I have time to sort out the old ones myself. Hope it helps.
-
ISO9001 certification, you can contact me. The screen name is my phone number. I am here as a issuing agency, and the whole process is a one-stop service.
1. Application form: 1 copy, which needs to be signed and stamped with the official seal of the enterprise and the seal of the enterprise;
2. Contract: 2 copies, signed and stamped with the official seal of the enterprise and the seal of the enterprise;
3. The business license of the enterprise needs to be stamped with the latest annual inspection seal;
4. The first certificate of enterprise organization needs to be stamped with the latest annual inspection seal;
5. Enterprise qualification license (if any), which must be within the normal validity period;
6. Company profile;
7. Enterprise organization chart;
8. Enterprise product process flow chart;
9. Enterprise quality manual and procedure documents (electronic version).
-
Hello brother, are you **? If you're in Chongqing, we can talk to each other in person, and my work is related to that, but we're in Chongqing, so if you need it, you'll be close to me.
-
I work in an architectural design institute, and recently the leader asked me to be responsible for what ISO9000 certification, which needs to be done quality. The top management of the enterprise shall assume full responsibility for the quality of the products produced. Hence the operation of quality management.
-
The content comes from the user: Tianliang loves every day.
First, the design program.
Second, the design department of the daily management rules.
Article 1 Attendance on time, the company implements clock-in and clock-in. Those who are late for work and meetings and leave early will be dealt with according to the attendance system.
Article 2 Document Management.
1. Unify customer documents and data and back them up in the same folder;
2. After the customer information is sorted, a fixed separate folder is established, and the project is completed, sorted out by the designer, and backed up to the server as needed.
3. When the design project is completed, the final CDR file and related original and modified files are backed up to the server or disk, and the backed up product must be the final version of the trimmed, and the rest of the valuable files can be left in the machine, but they need to be placed uniformly;
4. When the project is completed, all the project information transferred by the customer department must be returned with a document bag, and the project name must be indicated on the document bag.
Article 3, after the use of books, color codes, gallery and other departments and other departments of the staff should be returned to their original positions, repeated teaching and failure to change the penalty of 50 yuan each time.
Fourth, after getting off work or working overtime, do not turn off printers, computers and other equipment, department employees will be fined 10 yuan per person.
Fifth, the output artwork is wrong, depending on the circumstances, the person directly responsible for the economic punishment.
Sixth, when the customer puts forward the design requirements that do not conform to the content of the work order, it should be dealt with with by the general manager.
Article 7 Any copy must be received from the general manager before copying.
Article 8 Economical and effective use of printing paper, if there is a printing error, the available paper will be cut for reuse.
Article 9 Before getting off work every Saturday afternoon, sort out the personal design materials of the week and the personal written work summary of the week. 8
-
It is difficult to find a specific quality management system on the Internet, only the quality management system classified by enterprise, business and so on.
Our company's quality management system belongs to the mechanical category, and it is estimated that it will be of little use to you.
-
Table of Contents In order to strengthen the management of the company's engineering process and ensure the orderly operation of the enterprise, this procedure is specially formulated, and the table of contents is as follows: 1. Verification procedures for the settlement of construction staff bonuses 2. Quality assurance management system 3. Implementation rules for the management of construction personnel risk fund and responsibility system 4. Regulations on the use of emergency problem reports 5. Relevant documents and ** Construction task responsibility letter (construction personnel) Construction instructions (see Annex - Engineering Construction Manual) Construction Task Responsibility Letter (Work Class) (See Annex - Engineering Construction Manual) Construction schedule (see Appendix - Engineering Construction Manual) Acceptance Form of Major Concealed Works (See Attachment - Engineering Construction Manual) Memorandum of Dimensions of Materials (Products) Purchased by the Owner (See Attachment - Engineering Construction Manual) Record Form of Rectification Required by the Owner (See Attachment - Engineering Construction Manual) Registration Confirmation Form of Main Material Brands and Varieties (See Attachment - Engineering Construction Manual) Owner's Choice of Materials Registration Form (See Attachment - Engineering Construction Manual) Deferred Change Orders (See Attachment – Engineering Construction Manual) Design Change Order (See Attachment - Engineering Construction Manual) Construction Diary (See Attachment - Engineering Construction Manual) Construction Increase and Decrease Project Change Contact Form Decoration Project Warranty Certificate Decoration Project Income and Expenditure Card (See Attachment) Retest Project Table Residential Decoration and Decoration Quality Acceptance Record Form Construction Operation Flow Chart List of Distribution Scope of Materials Department in Various Regions The company's internal work contact form; Penalty form for project management and construction staff questionnaire for urgent problems.
-
Just look for some security systems on the Internet. That's how I got it.
-
I'm sorry, these involve some information within our company, and I don't have the authority to inquire about it, so I can't give it to you, I'm really sorry.
Qualifications are licensed to Xiaozhuang.
Take an example, a box of apples and a seed. At present, a box of apples is indeed tempting, it can be eaten or sold, it is indeed profitable, and others are not willing to sell a seed to others. But you plant the seed, and how many apples will it produce in a few years? >>>More
The main reason is that the architecture major has a plan stage of design, and the ratio of the building structure that we specialize in drawing construction drawings here is basically 1:1, and there are an equal number of architectural professionals doing the plan. >>>More
Henan Kuanxin Li Gong: Provide certificate affiliation and qualification agency. >>>More
Go to your local construction authority and buy it!
Qingfeng was chosen because he specialized in interior design, immersive teaching in the color and lighting laboratory, more than 1,000 new materials and technology research and development training bases, teachers from the Academy of Fine Arts, and cooperation with the well-known design company DOP, so there are many practical opportunities. Where to study interior designers? At present, there are many interior design training institutions in the market, resulting in many students not knowing which one to choose? >>>More