In terms of construction cost, there are a few questions for seniors to answer

Updated on educate 2024-05-28
8 answers
  1. Anonymous users2024-02-11

    1. National cost officer examination, professional title examination, national cost engineer examination (you don't need to take the national cost officer exam after taking this test), if you feel that you still have energy left, you can take the construction engineer and the like. Also, be sure to remember to get your English and computer over in time.

    2. There are basically requirements for working years, you are still a student, the number of years is definitely not enough, the so-called exemption conditions are very harsh, and your major has little to do with it, I remember that it is required to work for many years, what outstanding contributions have been made, what projects have won what awards, etc., etc., etc., etc.,

    4. It seems that the civil engineering budget CAD is used more. Commonly used software, I know Glodon, Zhiduoxing, Ruite, etc.

    5. It is really not suitable for women to go to the construction site. But if you want to learn real skills, it's best to spend two years on the construction site.

  2. Anonymous users2024-02-10

    1.Cost engineers, consultants, and builders, who are now very popular, are all registered in the country, and you must have the energy to study when you go to school now.

    2.There shouldn't be an exemption from the exam, but if you can take the exam in school, it should be very advantageous, because most people don't have the time and energy to read books, so the pass rate is not high.

    3.The cost engineer does not need it, and the cost engineer recommends that **buy some global courseware to listen.

    4.It's better to be able to strengthen it, but it's still a bad thing to have a high starting point.

    5.The construction site is not so scary, where you can learn a lot very quickly, wealth, you weigh it, hehe!

  3. Anonymous users2024-02-09

    1. You can only take the cost clerk exam now.

    2. At present, your qualifications are not enough to exempt the subject requirements!

    3. Look at yourself, you can find it if you want to!

    4. Most of the software is carried out on the basis of CAD assistance!

    5. Don't go to the construction party, the rest is fine! Party A, auditing, cost consulting, are all good!

  4. Anonymous users2024-02-08

    Constructor (Level 1 and 2) Cost Engineer (Nationally Registered) Supervising Engineer (Nationally Registered) Auditor Constructor (Difficult) Appraiser.

    At this stage, you can go to the school to take the cost officer, data clerk, construction worker, safety officer, quality inspector, these are okay.

    The cost of the cost of the test can only be exempted from the multiple-choice part (must be fresh graduates), you can not be exempted from the test through other methods.

    The training institution does not use it at all, just read the book.

    CAD must be strengthened, practice often, use shortcut keys for Glodon, Daswei, Luban, Hongye, and Zhuye.

    Those who do engineering are not hard, and those who learn the cost can only say that they can end up without being exposed to the wind and sun, but I advise you that it is best to go to the construction site first and follow at least one or two construction sites.

  5. Anonymous users2024-02-07

    It's in any direction, and whatever work you do is what you do.

    The work content is broadly divided into several types.

    Estimated project budget of the design unit.

    The construction unit pre-settles the bid**.

    Bidding control price of the consulting unit.

    Financial evaluation by the competent department of finance.

    Audit unit audit.

    The research is divided into industries such as civil engineering, water conservancy and highways.

  6. Anonymous users2024-02-06

    PO is the amount of the completed project that the contractor should have, that is, the contract amount of 20 million.

  7. Anonymous users2024-02-05

    This is the formula of the adjustment: PO - the progress payment of the project budget in the contract price (that is, the price when the contract is signed, 20 million in the question);

    p - the contract price or the actual settlement of the project after the adjustment;

    For example, a project signed a contract price of 10 million yuan on May 1, 2008, and when the contract agreed that the fixed coefficient was settled on May 1, 2008, it was found that the price of steel rose by 13% and the price of cement increased by 16%, of which steel and cement accounted for 25% and 30% of the adjusted part respectively. Asking for a settlement price?

    Answer: p=1000(

    Hope that helps.

  8. Anonymous users2024-02-04

    The time value of the capital is not considered in the static investment period: 4000 900 = the value of the capital in the dynamic period should be considered in the period, and i is substituted into the formula p = a (p a, i, n) respectively, and p is calculated2. The cumulative net cash flow for each year is .,

    2. It can be seen that its dynamic ** period is 6 7 years, and the dynamic ** period is 6+ years when calculated by linear insertion method.

    There is a detailed introduction in the textbook of the first-level constructor.

    900 times (1+10%) to the power of -7 means that the 900 at the end of the 7th year is split into the present value, because the net income at the end of each year in this problem is equal, it is easy to calculate the present value of the equal payment series, if you want to use 900 times (1+10%) to the -n power to calculate and then add up the result is the same.

    is the denominator calculated by the linear insertion method, and the linear insertion method is the principle of similar triangles, then there is x

Related questions
8 answers2024-05-28

Hello, I am a student of cost, I can't be a senior, but I can provide a little advice; >>>More

13 answers2024-05-28

1.Electrical appliances or wires must ensure that the limit current is not used for a long time, do not use electrical appliances where there are flammable gases such as gas or gas, and there is no problem with the connection of the line, and the joints must be connected. >>>More

7 answers2024-05-28

I will definitely ask if I have done some design in school, and what type of design have I done? For example, a commercial office building? Or is it a residential one? Which one does a little more, and it is not likely to ask for details (fire spacing or something, this is not an exam), these are generally not mentioned. >>>More

17 answers2024-05-28

Hello. I'm sorry to tell you that your chance to retake the test is gone. However, you may be hired directly by the company. >>>More

3 answers2024-05-28

Mexico! Belgian and French chocolates are better! Because they have great mechanical grinding skills, they can grind chocolate to an extremely delicate degree! Dark Chocolate, White Chocolate, Milk Chocolate! >>>More