-
Flooring, waterproof, moisture-proof, how well it is done.
-
Many people finish the house after the renovation is completed, in fact, the house has to be accepted after the decoration, how to accept it? So let's take a look at the acceptance method after the house is renovated!
1. Paint. Check the surface of the paint to see whether its color is uniform, whether the surface is bright and smooth, and there can be no wrinkles, blistering, bottom-penetrating and other phenomena, and the boundary of the paint should be straight and neat.
2. Carpentry. 1. The board surface should be smooth, and there should be no blistering, bursting, deformation, scratching, dead joints, etc.
2. The corners of the carpentry should be straight and smooth, and the hands should not be scraped. The surface of the keel and bottom back is neat, not stingy, and no stains.
3. The cabinet drawer should be closed smoothly, and the shelving lever should be smoothly pasted on the four shelves.
4. The door panel is four-square, no bending, and the accessories should be complete.
3. Electrician. 1. PVC pipes should be used for the wall line, not buried wires, and the road box should be connected.
2. The open line should be laid neatly and beautifully, and the distance of the line code should be normal and equal.
3. Electrical equipment with large power should be wired in a separate circuit.
4. A leakage circuit breaker should be set up in the distribution box as the main switch.
5. The wiring of electrical devices should be firm, and the ground wire should be installed on non-live metals.
Fourth, paving. 1. The tile paving should be smooth and the edges should be neat.
2. The kitchen and toilet floor should be made an inclined plane to avoid water accumulation or flooding.
5. Flooring and floor wax.
The floor seam should not be larger than 2cm, and the polishing should be smooth, and there should be no sharp marks or concaves.
6. Water supply, drainage and equipment.
The water pipes should be straight and neat, all copper pipes should be used indoors, and PVC pipes should be used for sewer pipes; To install the faucet and other surface accessories, you need to use cloth tools, and you can't damage the faucet and accessories, and you can't hit it directly with a hammer; When installing basins and toilets, the level and water residue should be aligned. The kitchen and bathroom room should be equipped with a drain, and the kitchen and bathroom room should be tested for waterproofing, so that there can be no water seepage, beam removal mold and water falling.
7. Wallpaper. If the wallpaper is pasted, then the wallpaper should be prepared, and there can be no blistering, let alone the tearing of the paper edge.
Summary: The above is about how to accept the house after the decoration of the relevant content, the house acceptance must pay attention to the above problems, so as not to bring trouble to yourself after moving in, I hope it will help you.
-
Many people may think that the house can be renovated, but in fact, it is not, and acceptance is more important than the decoration process. Most of the owners did not check in after the renovation, and when there was a problem, it was themselves who lost. Next, I will briefly introduce to you how to accept the house after decoration.
First, tile paving acceptance.
The tile surface should be flat, the angle should be accurate, the edges should be neat, and the edges and corners should be complete.
The kitchen and bathroom floor should be treated with a slope to prevent water accumulation.
After the tile is collaged, it needs to be brushed with rattan wire, and no dirt should be left on the brick surface.
2. Acceptance of flooring and floor wax.
The gap between the floors "mm. Skids should be selected larch and pine. The specification must be 45 mm * 25 mm, and the length of the fixing screw is 2 times the height of the grid.
The maple floor must be made of 9-12 mm plywood, and the bottom of the board should be waterproofed with plastic paper, and 10-20 mm gaps should be reserved on all sides, and covered with baseboard edge sealing.
The sanding floor should be smooth, there should be no dents, and the corners should be sanded with a small grinder.
3. Carpentry acceptance.
When inspecting wooden furniture, it is necessary to check whether the structure is straight and flat.
The surface of wooden furniture should be flat, without bulging and damage.
The angle of the carpentry must be 90°, except for special factors.
Fourth, electrician acceptance.
The line into the wall must use PVC pipe or black iron pipe, and must not use the method of digging the wall and burying the wire, and must take the road box.
The laying of the open line must be neat and beautiful, especially in the corners, and the distance of the line code should be equal.
The wires in the cabinet are concealed and fixed with glue wire codes every 200 mm.
High-power electrical equipment, such as air conditioners, electric water heaters, etc., must be wired separately.
The installation height of the switch is meters, and the distance from the door frame is meters.
5. Paint acceptance.
The color of the paint surface is uniform, and there is no wrinkle, penetration, blistering and whitening.
The paint borders are neat and there is no outbounds.
Standing at a distance of 1 meter to look at latex paint, it must be wrinkle-free.
Sixth, wallpaper acceptance.
The wallpaper joint should be precise and conforming, without blistering and tearing.
7. Carpet acceptance.
The carpet joints should be neat.
The edge must be closed with an aluminum angle, and must not be struck with a small hammer, but must be padded with a wooden block and then lightly tapped to avoid leaving dents.
8. Water supply and drainage and equipment acceptance.
The downspout is based on a small interface, and the water pipe should be neat and bent as little as possible.
Copper pipes are used for indoor pipes, rubber-coated copper pipes are used for hot water pipes, and PVC pipes are used for sewer pipes.
To install surface accessories, use cloth bag tools, do not break, do not knock vigorously.
After installation, the water needs to be tested, and there shall be no water seepage, water leakage, etc.
Summary: After reading the above introduction, I believe you have a further understanding of how to accept the house after decoration. If you need to know more about it, please continue to ******, and more exciting content will be presented to you in the future.
-
Fitment. After how to accept the step 1, after the completion of the decoration construction, the decorator and the person in charge of the decoration enterprise jointly submit an acceptance application to the management office.
2. The management office organizes acceptance personnel (supervisors and technicians of the mechanical and electrical maintenance group, supervisors and administrators of the public affairs group) to carry out on-site acceptance of the decoration within the same day. If there is no violation of the rules and regulations, the following procedures shall be followed: if there are violations, they shall be handled according to the violation measures.
3. If the completion acceptance is qualified, the public affairs group of the management office shall be in charge of the decoration application form"Completion acceptance"Column signing"Passed the initial inspection"and sign and date.
4. The security team of the management office will take back the construction certificate, and if it is lost, the decoration company shall give certain compensation.
5. The decoration company cleared the site and left on the same day.
6. After the decoration acceptance is qualified and used for one month, the public affairs group of the management office shall organize a re-inspection of the decoration construction, and there is no problem with the re-inspection, which shall be indicated by the head of the public affairs group in the "decoration application form"."The re-inspection is qualified"After that, it will be sent to the director of the management office for approval, and the finance department will return the decoration deposit of the decorator and the decoration enterprise.
7. When the decoration construction is accepted, the decorator has illegal decoration behavior, the head of the public affairs group shall, according to the situation, make an appraisal according to the regulations, list the amount of deductions, and after the consent of the director of the management office, a copy of the deduction list will be handed over to the decorator, a copy of the financial group, and the financial group will deduct the money according to the following methods:
1. Deduct the money from the decoration deposit of the decoration enterprise first;
2. If the decoration deposit of the decoration enterprise is insufficient to compensate for the deduction, it shall be deducted from the decoration deposit of the decorator;
3. If the deduction of the decoration deposit of the decorator still cannot compensate for the deduction, the decorator shall be required to give compensation;
4. Decoration data are sorted out and archived for long-term storage.
-
You can find a professional third-party acceptance company.
-
I often hear many owners lament that buying a new house has bought a bunch of troubles, such as wall cracks, water seepage, air friends, inconsistent area, inadequate facilities, and other housing quality problems that make new owners a headache. In fact, this is due to the fact that the new owners do not carefully inspect the house before handing over the new home, identify the problems in time, and confirm the solution to these problems with the real estate developer. Because the law stipulates that the confirmation of the receipt of the house represents the buyer's recognition of the quality of the house, and the quality problems found after the receipt of the house should be borne by the buyer.
Therefore, these problems should be paid attention to, and they should not be let go easily. If we do this step well, we can save a lot of trouble in the later decoration process. Therefore, it is very necessary for new owners to supplement the corresponding knowledge of closing before this.
Next, I will introduce you to some relevant knowledge of slag correction.
In a broad sense, the act of handing over the house with the developer after the completion of the house.
The process of closing the house is not complicated. The new owner should bring all the identity documents, relevant information, fees and house inspection tools, etc., and go to collect the house according to the time agreed with the developer, mainly in the following steps:
1. The developer and the property verify the owner's materials. Both parties confirm the closing process.
2. The owner receives the "Completion Acceptance Record Form", "Residential Quality Assurance Certificate", "Residential Instruction Manual" (these three items must be originals) and the "Housing Land Surveying and Mapping Technical Report", and the developer will explain it.
3. The owner does a comprehensive acceptance of the new house, which is also the most important part of the house inspection.
The owner raised questions and improvement suggestions on the problems existing in the acceptance, and then the two parties discussed and came up with solutions. After face-to-face negotiation between the two parties, a written agreement of regret is reached, and the problems existing in the delivery of the house are resolved according to the content of the agreement. If the matter is not resolved within a short period of time, the parties shall renegotiate the solution and the deadline and date, and reach a written agreement again.
5. The developer issues the "Surveyed Area Surveying and Mapping Report", and the two parties will settle the remaining house payment, various expenses and liquidated damages for delayed delivery after confirming the area error.
6. The owner receives the key to the new house and signs the "Residential Key Receipt Letter".
7. Sign the property agreement with the property management company, pay the property fee to the property management company, and ask for the receipt of invoice or stamped confirmation.
8. Handle matters related to property rights certificates. If the owner entrusts the developer to handle the property ownership certificate, the developer can collect the deed tax on behalf of the developer.
You can get it for free
-
The acceptance of the new house is a very important link before the decoration of the house, and the quality of the house acceptance not only directly affects the quality of the decoration in the later stage of the house, but also has an important impact on the safety of the residence, so it cannot be ignored. So, how should the new house be accepted? Let's take a look.
First, the overall survey
When inspecting the house, the first thing to see is whether there are cracks in the house, especially in the bedrooms and on the top and ground near the terrace, if there are cracks and the corners of the wall are inclined more than 45 degrees, the house has serious quality problems, which cannot be remedied, and must not be signed. If there are many cracks, through the entire wall, and through the back of the wall, the house can not be wanted. However, if there is only a slight crack parallel to the beam of the room, it is necessary to coordinate with the renovation company to repair the problem.
Second, start from the subtleties
If you hear a dull knocking sound, it means that it is a stone wall, and if it is a hollow sound, it means that it is a hollow wall, and the sound insulation effect of this kind of wall is very bad, so you need to be careful.
Experience the escrow effect of doors and windows for yourself, and see if the doors and windows are tightly fitted and whether the switch is flexible. Carefully check the places where there are pipes connecting the kitchen, bathroom, and balcony to see if there is leakage and poor drainage, and conduct a waterproof test to see the drainage speed and water pressure.
Check the wiring of the house, pull the switch off, and check whether the opening in the room is useful.
3. Refuse to accept the garbage room
When inspecting the house, if the house has incomplete documents, do not blindly listen to the words of the developer or the signatory, and sign for the receipt after the documents are complete. If the developer does not solve the problem for a long time, he can directly contact the developer and ask the developer to take responsibility, and if the negotiation cannot be done, he can seek legal assistance.
If there is a quality problem when the house is accepted, it is necessary to find the developer or builder to confirm the quality problem in writing, and affix the official seal, and then sign for the receipt after it is solved. If the developer is unable to solve the problem of the quality of the house. Even if it is repaired, it is impossible to live normally, so you can directly terminate the contract and claim compensation, and if necessary, seek legal assistance.
You can get it for free
It's hard to get a lot of questions, but if you're really nice, you shouldn't change your mind because of the number of times you've met, and sometimes it's good that both parties have more time to deal with their own things! Feelings need the test of time and the maintenance of double release. As long as you two truly love each other, I don't think there will be any problems you said. >>>More
A girl gives you a bad look, but don't think she doesn't care about you. Because ah, girls are all mouthful, yes, hehe, really! Try harder, maybe she's already paying attention to you, starting to like you, and just wants you to be more proactive, after all, your performance is not very obvious, and she can't guess whether you mean that or not!
, the belt gradually widened and did not regret it, and made people haggard for Yi. Liu Yong's "Feng Qiwu", the contract between life and death, and Zicheng said. Hold the hand of the son, and grow old with the son. >>>More
You can understand how you feel. However, things still need to be treated rationally. My advice to you is, give him a little more time, and give him more constructive advice, such as temporary part-time work, or apply for a few more similar jobs, in short, the life of the husband and wife should be discussed between the husband and wife, dear friends, don't worry, don't be afraid, believe in your husband, believe in yourself, believe in life, believe in love. >>>More
Total price of game equipment: 1948 yuan.
CPU]AMD Athlon II X2 245 405Ԫ. >>>More