How to judge whether aerated concrete equipment manufacturers have strength

Updated on technology 2024-05-07
15 answers
  1. Anonymous users2024-02-09

    Gassing investment is a lot of investment, so the most effective way to find a professional manufacturer to see the strength of aerated concrete equipment manufacturers is to go to the field. In the production base, it mainly depends on its production equipment and service attitude. Powerful companies will definitely pay attention to the details, and many technical strengths are reflected in the details.

    For example, the ferry car produced by Shanghai Huapre is equipped with a forced positioning system, which has accurate positioning, especially high repeat positioning accuracy, which greatly saves time and improves production efficiency. We warmly welcome your visit and guidance! References for win-win cooperation.

  2. Anonymous users2024-02-08

    The best way to do this is to visit their local factory. Take a look at the area of their factory, the technology, and the machinery and equipment. If you go to a factory, you don't even have a machine.

    Isn't that an empty shell. Hehe. You can call my ** specifically.

    My ** is below. We do this professionally. We can take you to our factory to visit and inspect.

    **Plausible. The quality is absolutely good. **Talk about it in detail.

  3. Anonymous users2024-02-07

    1. Search for information about this manufacturer on the Internet, due to the negative information of the manufacturer.

    2. Field trips. Hearing is virtual, seeing is believing, go to the manufacturer for on-the-spot inspection.

    3. Check the manufacturer's business license, etc.

    4. Check the floor area and plant size of the manufacturer.

    5. Go to its production workshop to see if there is any finished aerated concrete equipment or the site under construction.

  4. Anonymous users2024-02-06

    There are quite a lot of equipment manufacturers of aerated concrete blocks, and the specific popularity and company details are as follows:

    1. Name: Jiangyin Sanjie Machinery and Equipment****.

    Company Profile: It is one of the subsidiaries of Jiangyin Sanjie Industrial Co., Ltd., and is a professional unit specializing in the production of aerated concrete production line equipment, autoclaves and other first, second and third types of pressure vessels and organic heat carrier furnaces. It has a modern production base and three subsidiaries, with a total investment of 100 million yuan and a registered capital of 10 million yuan.

    The company also has a group of scientific and technological personnel and management personnel who have been engaged in the design technology of organic heat carrier furnaces and pressure vessels for a long time, through technical cooperation with dozens of domestic scientific research units and colleges and universities.

    2. Name: Zhengzhou Kaichuang Machinery and Equipment****.

    Company Profile: Zhengzhou Kaichuang Machinery Equipment **** is a new type of wall material equipment enterprises, the main products involve: aerated concrete equipment, aerated block equipment, aerated brick equipment, aerated block production line, ALC aerated concrete plate equipment, hydraulic brick machine, lime sand autoclaved brick production line, hydraulic forming machine, unburned brick machine, sand making equipment.

  5. Anonymous users2024-02-05

    There is a Tianyuan in Changzhou, and there is a new Mingfeng in Wuhu that I have heard of better. In fact, you should be able to see how the quality is, generally around 4 million for cheap, and about 10 million for good. It's hard to say that you trust this thing, and you have to look at it when you do business.

  6. Anonymous users2024-02-04

    1.Basic mix ratio.

    Fly ash Stone cavity ash cement gypsum = 69 20 8 3 sand: lime: cement: gypsum = 67: 20: 10: 3 (blocks are calculated according to 600kg m specifications.)

    Aluminum powder accounts for about the total amount of dry materials;

    Water-to-material ratio:. Note: The specific parameters must also be adjusted according to the actual situation of the raw materials.

    2.Slurry stirring pouring cycle.

    Stirring pouring working cycle: 6 minutes;

    3.The green body is stationary.

    Static stop temperature: about 40;

    Strength of the green body after static stopping: .

    4.The cutting cycle of the green body is 5 minutes.

    The production process of aerated block equipment must follow the fixed ingredient ratio, if the ingredient ratio is not accurate, the quality of the Li hail aerated concrete block produced by the autoclave will also be uneven, which round sail may suffer losses in the production process. Therefore, we must pay attention to the ingredient ratio in production. Gongyi Machinery Factory is a manufacturer specializing in the production of aerated concrete production lines.

  7. Anonymous users2024-02-03

    Looking at the global economic environment, I would like to express my views on the actual situation in China: 1There are too many manufacturers of aerated block equipment, this year will definitely be a cold winter, after the big waves and sand, there will be many manufacturers who cannot make ends meet or even close their doors; 2 Manufacturers of aerated blocks will face:

    If you don't sell it, you don't have a market, you don't have cash when you sell it, the more you sell it, the more difficult it is to settle, and in the end it will crush many manufacturers, which is also the biggest problem faced by many manufacturers of aerated blocks, and some manufacturers are even owed tens of millions; 3 Since the bursting of the real estate bubble in Ordos, Inner Mongolia, I believe that many people can see something, they are all layers of money, and in the end, they are pressed on top of the house, and even due to the rupture of the capital chain, there will be a lot of unfinished buildings, is the latest phenomenon in Ordos an isolated case? Will the crash spread to other cities? This is all unknown; 4 Now that the developers are in a hurry to get the house out of the groom, how many will take it?

    Speculative or those who have the conditions to buy have already been bought, and what if there are many people who want to buy and have no money to buy? It's up to you to think about it.

    In recent years, the state has been very strict in controlling land, especially in the approval of industrial land. The last aerated block plant first faced the problem of land approval, then the problem of environmental impact assessment, and then the problem of funding, all of which were indispensable; The issue of land approval and environmental impact assessment first needs to have a project approval report, and due to the difference between various regions, the smallest approval project has been controlled at an annual output of more than 150,000 cubic meters. May I ask?

    The annual output of 150,000 cubic meters of gas plant at least investment in more than 20 million to normal production, of course, not in accordance with the formal design scheme of about 12 million can also be barely produced, the most critical and most important enterprise is on the aerated block project in the future product sales problem, as mentioned earlier, in addition, now there are not a few factories producing aerated blocks in that city in China, so not on the project want to go on, on the tiger is now more difficult to ride, According to the actual situation of the buyer, the buyer's market is not optimistic this year; On the other hand, in the seller's market, the domestic large and small production of aerated block equipment, refueling equipment manufacturers as many as thousands, can produce good products and a few, the buyer is not not to inspect the market, to inspect and inspect the equipment and a few, so 2012 is the manufacturer of aerated block equipment and the nightmare of the gas plant to be launched.

  8. Anonymous users2024-02-02

    This seems to be the market prospect of aerated blocks, you go to Henan Tai'an Machinery to see, and the introduction of this aspect is above!

  9. Anonymous users2024-02-01

    Aerated concrete equipment can be produced according to the category of raw materials, quality, process characteristics of the main equipment, etc. However, under normal circumstances, fly ash or silica sand is ground into a slurry with water, powdered lime is added, an appropriate amount of cement, gypsum and foaming agent are injected into the mold frame after stirring, and after the static oxygen foaming is solidified, it is cut into blocks or plates of various specifications, and sent into the autoclave by the steaming and curing car, and a porous and lightweight aerated concrete product is formed under the high temperature saturated steam curing.

    The selection and quantity of aerated concrete equipment are determined according to the process design scheme, according to the process design, pouring is divided into two kinds of pouring: fixed and mobile, the cutting method is mainly flipped cutting in China, and other batching systems, autoclaved curing and other equipment are similar.

  10. Anonymous users2024-01-31

    Aerated concrete equipment, as the name suggests, is the equipment for the production of aerated concrete blocks, which is mainly divided into aerated concrete block production sections

    Raw material processing equipment: jaw crusher, ball mill, slurry pool, slurry storage tank;

    Batching pouring section: pouring mixer, mold, side plate, metering scale;

    Flip cutting section: flip spreader, steaming trolley, cutting machine, flipping machine, semi-finished spreader;

    Autoclave curing section: autoclave, finished product fixture, breaking machine.

    The aerated block is a new type of wall material, and aerated concrete is a new type of building material that is light and porous, which has the advantages of light weight, good thermal insulation, processability and non-combustion, and can be made into blocks, plates and insulation products of different specifications, which are widely used in load-bearing or enclosure filling structures of industrial and civil buildings. Hope my answer will be helpful to you, you can refer to the detailed information about AAC equipment.

  11. Anonymous users2024-01-30

    Aerated concrete equipment is used to produce aerated concrete blocks, and the development of aerated concrete products in China is very rapid and the prospects are very broad. Aerated concrete has become a pillar industry in China's construction industry, and China has introduced this technology for nearly 40 years. The aerated concrete equipment is mainly two production processes, fly ash aerated concrete block and sand aerated concrete production line equipment and other aspects of technology to reach the industry-leading level.

    Aerated concrete block is a new type of green and environmentally friendly self-insulating wall material made of river sand, lime and cement as the main raw materials, aluminum paste as the gassing agent, and the raw materials are finely grounded, mixed with ingredients, poured and gased, cut by static stop and autoclaved curing. It has the characteristics of light weight, high strength, durability, thermal insulation, sound insulation, fire prevention, impermeability, and good anchoring performance, and has the advantages of convenient construction, strong machinability, can reduce the comprehensive cost of the building, and increase the usable area of the building. It is also a new type of project promoted by the state.

  12. Anonymous users2024-01-29

    Aerated concrete equipment is used to produce aerated concrete blocks, and the current construction industry basically uses aerated concrete blocks as materials. The development of the construction industry has made the use of aerated concrete blocks more and more large, and similarly, aerated concrete equipment has also received more and more attention. Zhengzhou Baixin Machinery adopts German Weihan technology.

    I recommend you check it out.

  13. Anonymous users2024-01-28

    Hello friends! The following points need to be paid attention to when purchasing aerated concrete equipment:

    First of all, it is necessary to determine a reasonable scale. The scale of production involves the accommodating capacity of the market, the efficiency of the enterprise, and the premise of determining the technical level of the production line. If the scale is too small, the profitability of the enterprise is low, and the scale is too large, and it is easy to cause overcapacity and increase the risk, the general investment in construction should consider the local building scale (within 150km), the development of various local wall materials (wall reform strength) and social development level.

    Secondly, according to the conditions of the construction unit itself, such as the conditions of raw materials and the conditions of the site, the key is the first condition and quality of sand or fly ash lime, and we must not blindly follow the trend regardless of the conditions.

    Thirdly, balance the relationship between investment and technical level, that is, the technical positioning of new projects. The construction of a production line, its investment and technical level has a direct relationship, on the current domestic aerated concrete plant, the highest investment of 14.5 million US dollars (200,000 m3 years), the lowest is only 2 million yuan (50,000 m3 years), converted into a unit cost of 1400 yuan m3 and 40 yuan m3 (both RMB), it should be said that the technical level positioning should be determined according to its own strength, the local social development level, however, the technical level of the production line must determine a basic requirement, That is, the product is qualified, the production efficiency is high, and it has the development room for complete support, and meets or gradually meets the requirements of the "New Building Materials Oriented Catalog". With the current domestic investment level, the general unit investment amount is yuan m3, which can build a production line with a certain technical level and ensure the return on investment.

    According to the scale, the general annual output is less than 30,000 m3, and the process layout should be simple, such as raw materials (mainly fly ash) should not be ground as much as possible, and manual cutting should be used; For an annual production line of 50,000 m3, the production process should be relatively perfect, and domestic shaping equipment can be selected, and mechanical cutting is adopted; The production line with an annual output of 100,000 m3 can increase investment in the control system and adopt computer program control; The production line with a scale of more than 200,000 m3 can go further, and the key equipment is imported equipment.

    Finally, the selection of the host device. The selection of host equipment mainly considers the production balance, the advanced technology and the quality of supporting services, etc.; Among them, the advancement of technology should also include whether it is in line with relevant industrial policies. For example, the indispensable autoclave for aerated concrete production, the specifications are, and, in the selection, should be combined with the construction scale and the mold to be comprehensively considered, the autoclave diameter is too small, because its filling coefficient is small and reduces the efficiency of the kettle, and the kettle type is large, and it is not easy to pour steam in the future production, so that the steam consumption of the autoclave curing process increases.

    The industry recommends the use of the above autoclave, and does not advocate the use of the autoclave.

    The above is a detailed introduction to the equipment scheme of aerated concrete production line, I hope it will help you!

  14. Anonymous users2024-01-27

    It's going to be an on-site inspection, and I've just got on it.

  15. Anonymous users2024-01-26

    If you want to buy aerated concrete equipment, first of all, the funds should be sufficient, the aerated brick is not simply 1 million is enough, and the second is your site, there are many details that need to be paid attention to. Now the concrete brick making machine is also a good financial road, we are doing concrete brick making machine, if you need it, you can contact. There are also problems with aerated bricks that can also help you analyze and analyze!

Related questions
8 answers2024-05-07

Special mortar for aerated concrete block is a special mortar developed according to the porous characteristics of aerated concrete block. >>>More

9 answers2024-05-07

Aerated brick is a new type of lightweight wall brick. Generally, foam concrete is cut into small pieces, which has higher requirements for process and strength, and some of them also need steam curing, so the cost is higher. Our company has additives for aerated bricks, which can shorten the curing time and improve the strength. >>>More

7 answers2024-05-07

Aerated concrete blocks should pay attention to certain specifications and standards in the construction process, and there should be certain requirements for construction details, aerated concrete blocks are widely used in various construction industries, and in order to prevent cracks in concrete during the construction process, the following should be paid attention to: >>>More

13 answers2024-05-07

The release agent and stencil are important, in addition, the material grade is coordinated to achieve continuous wrapping, and the mold is removed after the mold removal strength is reached.

5 answers2024-05-07

1) Surface cracks and bursts.

Crack refers to the appearance of fine cracks on the surface of the green body when it is stationary, mainly due to the large temperature difference between the upper and lower parts of the body, and the expansion and cracking of the surface due to the rise of internal temperature and increased pressure, which can be found from the following factors: a Check the lime quality, too much powder ash or over-burned ash. b Room temperature is too low. >>>More