What problems should I pay attention to during the installation of charging piles?

Updated on home 2024-05-26
30 answers
  1. Anonymous users2024-02-11

    The charging pile needs to be re-based in the distribution room, because the electricity load of each cell is calculated before installation, and if a 100-volt voltage is used in the cell, only a 120-volt electric switch will be given to you. Therefore, the high voltage of 380 volts of the charging pile must be charged separately, that is, a switch is laid separately, which involves a cost of more than 8,000 yuan, which is borne by ourselves. Then, the power company pulls the wire from the switch to the charging pile about 200 meters, and the construction cost, including the cost of the hardware facilities of the charging pile, is borne by the power company, about 60,000 yuan, of which the state has a corresponding subsidy policy for the power company.

    At the same time, you also need to pay for the property. Charging pile equipment can choose Wuhan Xinyuan Hongda charging pile, the strength of the manufacturer is more reliable.

  2. Anonymous users2024-02-10

    Wuhan Xinyuan Hongda charging pile equipment manufacturers for you to answer: the charging pile is not to think that in the ground to make a few holes to fix the charging pile, and then pull a wire can be, in fact, the coordination of the workload is quite large, there are mainly four departments, the user himself, automobile companies, power companies and property owners. In terms of application, apply directly to the store company in your city, and then transfer it to the power supply bureau, and then the technical engineer will look at the site and provide the construction plan, if you are installing it in the community, you also need to get the consent of the developer.

  3. Anonymous users2024-02-09

    The requirements for installing a charging pile are as follows:

    1. You need to go to the property center to sign the commitment letter for the installation of electric vehicle self-use piles.

    2. The circuit of the charging pile: the shell needs to be set with galvanized iron pipe or plastic pipe, and the wiring needs to be neat according to the specified line.

    Cable. 3. Installation of electricity meters: It should be installed at the designated position confirmed by both the power supply bureau and the property owner.

    4. Installation of charging piles: It should be installed at the designated position confirmed by the construction party and the property owner. The location cannot affect other rows.

    5. A suspended dry powder fire extinguisher of no less than 6kg must be installed above the parking space of the charging pile. In addition, two more than 4kg should be placed on the ground.

    Dry chemical fire extinguishers, which also need to be packed in a suitcase.

    Installation process:

    Prepare documents: ID card, real estate certificate, real estate ownership certificate, etc.

    Submit an application: Submit an application for installation online or at the business hall of China Southern Power Grid.

    On-site survey: The staff will go to the site to investigate and judge whether it can be installed.

    Preparation materials: You need to purchase your own charging pile.

    Complete the installation: China Southern Power Grid staff will install the meter (free of charge), and the charging pile installation needs to find another person to install it (generally find charging.

    pile manufacturer arrangement).

  4. Anonymous users2024-02-08

    <> about charging piles, some are given when buying a car, and some are bought by the owners themselves, when we buy the piles back, then we must find someone to install them, but the installation also needs to have certain conditions, and the installation must meet various conditions.

    1. Is there a parking space purchased by yourself, and is the parking lot ready for installation?

    2. Does the property agree to the individual installation, and what procedures need to be prepared?

    3. For the line problem, how long does it take to take electricity from the first line, and whether the transformer load can bear it, and how to deal with this kind of problem? What materials do you need to declare for the electricity consumption of the State Grid?

    4. Who will bear the construction costs incurred during the installation process? Is it affordable for individual users to afford the high cost?

    5. Who will do the equipment maintenance after the construction is completed? How long is the warranty?

    These are all things that users need to consider when installing on their own. The relevant certificates required for installation generally include: house ownership certificate (copy), resident ID card household registration book (original and copy), parking space certificate (parking space lease contract or property account opening certificate), parking space property rights), the owner agrees to install charging facilities, local permit (copy).

    After the installation matters are determined, the power company, the property electrician and the owner need to go to the site to confirm whether the installed charging pile is qualified, and sign the relevant coordination and balance instructions.

    Then you need to go to the local power supply station to submit an installation application, and then the fiber chain charging pile installer lays the cable, installs the distribution box, and installs and debugs the charging pile. After the construction of the charging pile is completed, it is also necessary to test charge the charging pile to ensure that the charging pile can work normally in the future.

    When installing a home charging pile, you need to pay attention to these items.

    1. The new electricity meter is used for charging pile metering and charging, and the use of electricity is separated from household electricity. The two are independent, and household electricity is a tiered electricity price, which is generally relatively cheap. The electricity used by charging piles is generally commercial electricity, which is a little more expensive than household electricity, and it is a fixed unit price.

    2. In the process of applying for the installation of home charging piles, communication is very important, because the installation of charging piles involves circuit installation, circuit direction, instrument installation, cost measurement, etc. This is a relationship that owners need to take the time to move around.

    3. In terms of installing and erecting charging piles for home destruction, the most worrying problem is fire safety (large charging stations must be equipped with fire prevention facilities), because most old communities do not have the location of charging piles, so the corresponding supporting facilities are not perfect. Once there is a fire safety hazard, this is a responsibility that the individual cannot afford.

  5. Anonymous users2024-02-07

    What should I pay attention to when installing a charging pile in Anzhen?

    I think the main thing is to install it in accordance with the design standards, and in addition, see if the voltage does not match, the current does not match, and there is no problem with the installation.

    Is it safe to install at the location?

    In a word, you must be calm and depressed.

  6. Anonymous users2024-02-06

    The installation of charging piles requires a lot of attention, the safety of the power supply and his location are very important to pay attention to.

  7. Anonymous users2024-02-05

    The installation of charging stations needs to pay attention to the management of some state safety wires, after all, the wires are easy in summer, and they must do a good job of protective and desensitization measures, so that they are not only safe, but also provide a place for everyone to charge.

  8. Anonymous users2024-02-04

    What should I pay attention to when installing a coarse wheel-mounted charging pile?

    The charging pile must follow the process, and safety is the most important.

    The main thing is to install it in accordance with the standard of the macro plan, and in addition, look at the voltage and current to see if there is a problem with the installation 1Do a good job of checking to make sure that there are no flammable and explosive materials in the car, such as cigarettes, lighters, gasoline, perfume (the stool book contains alcohol), batteries, etc.; 2.Read the charging process of the charging pile carefully and ensure that the charging plug is fully connected to the jack, otherwise it may lead to abnormal charging; 3.

    Check whether the charging pile is normal, check whether the charging pile display screen has a fault, if you find that the charging pile has leakage and other faults, please press the emergency switch button immediately, call the staff in time, and wait for the staff to deal with it.

  9. Anonymous users2024-02-03

    The precautions that need to be paid attention to when installing charging piles are: the consent of the community property, power department, and fire department must be obtained in advance; Pay attention to the power, voltage and current of the charging pile to match the cell transformer; The location of the charging pile should be convenient for the charging pin base, and it should not affect the lead and filial piety traffic.

  10. Anonymous users2024-02-02

    I think the main thing is to install according to the design standards, and in addition, to see if the voltage is not matched, the current is not matched, and there is no problem with the installation.

    1.Do a good job of checking the stool to ensure that there are no flammable and explosive materials in the car, such as cigarettes, lighters, gasoline, perfume (including alcohol), batteries, etc.;

    2.Read the charging process of the charging pile carefully, and make sure that the charging plug is fully connected to the jack, otherwise it may lead to abnormal charging;

    3.Check whether the charging pile is normal, check whether there is a fault in the display screen of the charging pile, if you find that the charging pile has leakage and other faults, please press the emergency switch button immediately, call the staff in time, and wait for the staff to deal with it.

  11. Anonymous users2024-02-01

    When installing charging piles, it is necessary to consider whether the relevant electrical supporting facilities are sufficient and safe.

  12. Anonymous users2024-01-31

    If you want to install a private charging pile in a parking space, you must first obtain the consent of the property in the community where you live. If the property is agreed, the owner of the car still needs to read the beard to the power company to apply. Only after the property and the power company agree, the owner can install a private charging pile in the parking space to accompany the tall man.

    At the same time, car owners should also pay attention to the following materials to apply for the installation of private charging piles: house ownership certificate (copy), resident ID card household registration book (original and copy), parking space certificate (parking space rental contract or certificate issued by the property, property right certificate of the parking space) and proof that the property owner agrees to install charging facilities.

  13. Anonymous users2024-01-30

    Be careful not to have flammable and explosive materials nearby. Gasoline, these are very dangerous. Attention.

  14. Anonymous users2024-01-29

    When we buy the pile and come back, we must find someone to install it, but the installation also needs to have certain conditions, and the installation must meet various conditions.

    1. Is there a parking space purchased by yourself, and does the parking lot have the conditions for Anliang filial piety?

    2. Does the property agree to the individual installation, and what procedures need to be prepared?

    3. For the line problem, how long does it take to take electricity from the first class, and whether the transformer load can bear it. What materials do you need to declare for the electricity consumption of the State Grid?

    4. Who will bear the construction costs incurred during the installation process? Is it affordable for individual users to afford the high cost?

  15. Anonymous users2024-01-28

    To install a charging pile, you need to pay attention to the current and power, and then you need to pay attention to waterproof and electricity-proof.

  16. Anonymous users2024-01-27

    So what do you need to pay attention to when charging piles? If you install a charging pile, you must pay attention to the uh current and which empty voltage, the power supply must be a power supply with a positive Li book, and then you should also pay attention to the installation of insurance. What's at the same time? It is also necessary to pay attention to the facilities that are waterproof and moisture-proof.

  17. Anonymous users2024-01-26

    The installation of the charging pile needs to be corrected: Check whether the charging pile is normal, check whether the charging pile display screen has a fault, if the bureau finds that the charging pile has leakage and other faults, please press the emergency switch button immediately, call the staff in time, and wait for the staff to deal with it. Never do it yourself, or you risk being harmed.

  18. Anonymous users2024-01-25

    The most important thing for charging piles is to make the wires thicker.

  19. Anonymous users2024-01-24

    Hello: There are two types of charging piles: wall-mounted and floor-mounted. When installing, the corresponding wiring should be selected according to its power**.

  20. Anonymous users2024-01-23

    Precautions for installing charging piles: 1. First of all, you must understand whether you have a private parking space; 2. Do you agree to install private pile property, and what materials need to be prepared to submit to the property fraud? 3. Regarding the line problem, can the voltage meet the needs, and how to deal with it if it can't meet it?

    Will the power supply bureau agree to the instructions and what materials do you need to declare?

  21. Anonymous users2024-01-22

    When installing charging piles, you need to pay attention to safety, voltage and power should be safe. There should be leakage protection. It is necessary to prevent rain and damage, etc.

  22. Anonymous users2024-01-21

    If you need to install and charge, you must get the above approval, and you can only install it after you are qualified.

  23. Anonymous users2024-01-20

    1. Is there a parking space purchased by Pi Jing, and is the parking lot ready for installation?

    2. Is the property a friend holding the pat agreeing to the personal installation, what procedures need to be prepared?

    3. For the line problem, it is to take electricity from the first class, how long the line needs to be taken, can the transformer load be sustained, and this kind of problem should be dealt with? What materials do you need to declare for the electricity consumption of the State Grid?

    4. Who will bear the construction costs incurred during the installation process? Is it affordable for individual users to afford the high cost?

    5. Who will do the equipment maintenance after the construction is completed? How long is the warranty?

  24. Anonymous users2024-01-19

    Pay attention to the safe place on the side before installation.

  25. Anonymous users2024-01-18

    When installing charging piles, socks must pay attention to the safety factor, which must be high, thoroughly check the surrounding good and potential safety hazards, and then operate according to the requirements of installing charging piles.

  26. Anonymous users2024-01-17

    Both the product and the installation must comply with national standards and safety specifications.

  27. Anonymous users2024-01-16

    There are many things to pay attention to when installing charging piles. There should be no buildings or flammable materials around the area where it is installed, and it should not cause some disturbance or damage to the residents of the community. What do you need to pay attention to when installing a charging pile?

    I think the main thing is to install it according to the design standards, and in addition, to see if the voltage bridge does not match, the current does not match, and there is no problem with the installation. Is it safe to install at the location? In short, in a word, safety must come first.

  28. Anonymous users2024-01-15

    Hello friends, there are not too many precautions when installing charging piles, you can ask a special installation staff to ask them to know that they are professionals who understand things more messy and can give you very professional guidance.

  29. Anonymous users2024-01-14

    Hello dear <>

    The following requirements and processes need to be followed to install charging piles:1Location Selection:

    The location chosen to install the charger should be safe and have enough space for the charger and the vehicle. 2.Network Connection:

    Charging stations need to be connected to a network for monitoring and remote management. Make sure that your internet connection is reliable and fast enough. 3.

    Electricity**: Vehicle charging requires a lot of electricity, so we need to make sure that the power supply of the charging pile is strong enough to meet the charging needs of all vehicles. 4.

    Generally, it is necessary to have a relevant power engineer or a professional installation company to complete the hail. In summary, the installation of charging stations needs to comply with relevant regulations and standards, and the safety and reliability of the equipment needs to be ensured. If you need to install charging piles, it is recommended to consult and cooperate with local professional companies or businessmen.

  30. Anonymous users2024-01-13

    Installation requirements for charging piles: 1. Confirm the charging conditions: This is the most basic, if you can't install it, then don't think about it.

    First of all, it is necessary to determine whether there is a fixed parking space in the community, and secondly, to determine whether the parking lot can be connected to the national grid. 2. Property: The permission and cooperation of the property must be obtained.

    To install the charging pile, you must obtain the consent of the community. It mainly depends on the communication between the homeowner and the property. After the property company agreed, it also met the requirements of the installation and went to their power supply station to handle it.

    3. Power supply company: When the charging pile is completed, you can submit an acceptance report to the power supply company, and after passing the acceptance, the power supply company is responsible for installation and power connection, and then you can charge it. Precautions for charging piles1

    Please do not place flammable, explosive or combustible materials, chemicals, flammable vapors and other dangerous goods near the charging pile; 2.Keep the charging tip clean and dry. If there is dirt, wipe it with a clean, dry cloth.

    It is strictly forbidden to touch the charging gun core with your hands when charging. 3.It is strictly forbidden to use the charging pile when the charging cable or charging cable is defective, cracked, worn, damaged, or the charging cable is exposed.

    Improper operation may cause damage, imitation water leakage, electricity leakage, etc. Millions of car purchase subsidies.

Related questions
6 answers2024-05-26

Can you enter the BIOS can't? It is to press the del button when you boot up. If you can, you can reinstall the system, is your system installed on a CD, or directly installed on the Internet**? If the disc is installed, the C drive is formatted once and then reinstalled.

10 answers2024-05-26

The conditions for the installation of charging piles in the community are: authorization letter issued by the property to agree to install charging equipment, and proof of use of fixed parking spaces (rental contracts are required for rented parking spaces); >>>More

7 answers2024-05-26

GB 7588-2003 Safety code for elevator manufacturing and installation; GB25194-2010 Safety Code for the Manufacturing and Installation of Sundries Elevators; GB26465-2011 Safety Code for Manufacturing and Installation of Fire Elevators; GB21739-2008 Safety Code for Manufacturing and Installation of Home Elevators; GB21240-2007 Safety Code for Manufacturing and Installation of Hydraulic Elevators; GB Rubber insulated cables with rated voltage of 450 750 V and below Part 5: Elevator cables; GB PVC insulated cables with rated voltage of 450 750 V and below Part 6: Elevator cables and cables for flexible connections; GB 8903-2005 Elevator wire rope; GB T 22562-2008 Elevator T-rail; JG Elevator T-Rail Inspection Rules; JG elevator reuses hollow guide rails; YB T 5198-2004 Elevator wire rope wire; GB T Main Parameters of Elevator and Type and Size of Car, Shaft and Machine Room Part 1: >>>More

9 answers2024-05-26

First, the construction conditions of basketball wood flooring. >>>More

12 answers2024-05-26

The specific application plan for battery car charging piles >>>More