What conditions are required for the installation of charging piles in the community

Updated on Car 2024-03-17
10 answers
  1. Anonymous users2024-02-06

    The conditions for the installation of charging piles in the community are: authorization letter issued by the property to agree to install charging equipment, and proof of use of fixed parking spaces (rental contracts are required for rented parking spaces);

    The original ID card, parking space**, and self-use charging pile electricity application provided by the individual (you can go directly to the business hall of the power supply station); 4S shop: car purchase contract, invoice; If the residential community implements meter reading to the household, the self-use pile shall be installed by telegraph by the user or its entrusted person (including the charging pile operator) to apply to the regional power supply enterprise;

    The utility pile shall be installed by the property service enterprise or the charging pile operator entrusted by it to submit an application for telegraph installation to the regional power supply enterprise. If the residential community does not implement meter reading to the household, the user shall submit a demand to the property service enterprise, and the property service enterprise or the charging pile operation enterprise entrusted by it shall submit an application for telegraph installation to the power supply enterprise in the area;

  2. Anonymous users2024-02-05

    If your electricity address meets the installation conditions and the information is complete, you can install it, and the specific installation matters are subject to the on-site investigation by the staff. According to the current policies and business rules, if you are a customer within the service scope of Guangdong Power Grid Company, the information required for charging pile installation business is as follows:

    1. Identification information of the electricity user;

    2. Proof of property ownership of the property at the electricity address;

    3. If the bank deducts the electricity fee, the relevant payment information must be submitted;

    4. If you entrust others to act on your behalf, you need to provide the identity certificate and power of attorney of the agent.

    5、(1).For projects that occupy public places in the community, such as community parking lots, etc., it is also necessary to provide a consent letter issued by the owners' committee or the property for the construction of charging infrastructure.

    2) If the user only rents a parking space, the consent materials of the owner of the parking space, the identity certificate of the owner, the guarantee of electricity charges, and the customer's statement must be provided at the same time.

    The Customer's Statement includes:

    A statement that I am legally renting the dwelling;

    Declare that the electricity charges incurred in the dwelling are borne by the tenant himself/herself;

    In the event that the power supply enterprise cannot contact the tenant, it agrees that the owner of the property or the original housing leasing enterprise may go through the relevant procedures for closing the account or changing the name of the power supply enterprise.

    Note: If it is a civil air defense parking space, the property owner needs to issue a property certificate or provide a certificate of use of the civil air defense parking space.

    6. If it is in a public place, such as a roadside, etc., it is necessary to obtain the planning and construction certification materials and permit materials of the urban construction management department.

    The required information shall provide the original, as well as one copy verified by the customer to be consistent with the original and signed, and the customers of enterprises and institutions shall sign and affix the official seal in the copy. When handling business, resident customers need to sign and confirm on the "electricity business bill", and enterprise and institution customers must affix the official seal on the "electricity business bill".

    Due to the differences in information in different cities, please refer to the staff for specific information or call the 24-hour power supply service **95598 to inquire about the specific situation.

    Handling channels: WeChat follow the "China Southern Power Grid 95598" public platform My electricity business handling Electricity application Select the type of new business that needs to be handled, fill in the basic information and upload the relevant information according to the prompts, and then submit.

    After completing the application for installation, the power supply department will arrange staff to make an appointment with you for on-site service, complete the on-site investigation and collect the information, and then you can install the meter and send electricity.

    We hope you find ours helpful.

  3. Anonymous users2024-02-04

    The following conditions are required for the installation of charging piles in the community:

    1. The site meets the access conditions stipulated by the relevant departments such as electric power and communications.

    2. The site has a power supply and site space to meet the operation and maintenance of the equipment, and reserves the corresponding interface position.

    3. There is no high-voltage line corridor around the site, and sufficient safety distance is maintained from residential areas and important buildings.

    4. The site area shall not be less than 30m2 and not less than 10m2, of which there shall be no less than 5 fixed parking spaces.

    5. Sufficient power supply capacity (single power 50kw).

    6. Power distribution system with three-phase five-wire 380V alternating current or single-phase 220V alternating current.

    7. There is a reliable grounding device.

    8. Have lightning protection measures in line with relevant national standards.

    9. Have good drainage facilities, and the depth of the drainage ditch is not less than 0 7m.

    10. Possess the necessary fire-fighting equipment and fire extinguishing equipment, as well as emergency broadcast and communication facilities.

    11. When building in the special parking lot, it should also meet the requirements of the "Urban Public Parking Lot Planning Guidelines".

    12. Provide charging services, network interface agreements and other related documents and technical support documents according to user needs.

    13. Other conditions to be met. (e.g., special vehicle use environment, emergency plan under special weather conditions, etc.).

  4. Anonymous users2024-02-03

    Generally speaking, to apply for the installation of charging piles, you need to prepare application materials, and then apply to the power supply bureau. After the power supply bureau passes the audit, it will come to the site to investigate and install the electricity meter. After the meter is installed, you can call the master to install the pile.

    It sounds very simple, but in fact, many car owners and friends are already stumped in the first step, preparing the application materials.

    When applying for the installation of charging piles, customers need to provide the identity certificate of the electricity user, the property right certificate of the electricity address, the ownership certificate of the electric vehicle and the proof that the property agrees to the construction. The hardest thing to get here is the last thing that is ruin, called the "Property Consent Form". When the owner installs the charging pile, the resistance encountered mainly comes from the property, accounting for more than half.

    Asking these questions first can greatly reduce the communication cost when installing charging piles later. After all, the installer and the property owner need us to coordinate and communicate as intermediaries.

    If there is a problem when it is installed, it will be tiring to communicate, time-consuming, laborious and costly.

    In addition, we should ask in advance what additional materials we have, we can buy them in advance, and we can save some money.

    For example, the wiring, what casing is needed, many of these things can be bought in ordinary stores.

    The master said: "The front 3m doesn't cost money, and the 38m behind the letter mountain costs how much money." "Is it okay to buy it yourself? Generally it works, we can negotiate and prepare.

  5. Anonymous users2024-02-02

    The conditions required for the installation of car charging piles are as follows:1. Confirm the charging conditions, or whether the installation conditions are met. This one is the most basic, if the installation is not allowed, the rest does not need to be considered.

    First of all, it is necessary to clarify whether there is a fixed parking space in the community, and then it is necessary to see whether the parking space can be connected to the line of the national grid.

    2. Consent and cooperation of the property are required. If you want to install a charging pile, you must go through the consent of the property. This mainly depends on the communication between the owner himself and the property. If the property agrees and meets the installation conditions, it will apply to the power supply station where the community is located.

    3. Installation and construction. There is no need to say much about this point, it has nothing to do with the owner. After the construction of the charging pile is completed, you can submit an acceptance application to the power supply company, and after the acceptance is qualified, the power supply company will complete the work of installing the meter and connecting the electricity, and then it can be charged.

  6. Anonymous users2024-02-01

    The conditions required for the installation of charging piles in the community are as follows:

    1. The operation of charging piles requires a large number of electric vehicle users, and the charging utilization rate of the community reaches a certain level, if the usage rate is not high, the possibility of installation is small. If there are cars in this community and there are few electric vehicles, it means that the charging demand is not large, and the usage rate will definitely not be very high;

    2. The community meets the electricity requirements of charging facilities, and all management conditions are in place. To install a charging pile, it is necessary to confirm the charging conditions, or whether there are conditions for the installation of Anxiaomu. This one is the most basic, if the installation is not allowed, the rest does not need to be considered.

    3. In addition, there must be a letter of authorization issued by the property to agree to install charging equipment, a certificate of use of fixed parking spaces, etc. If you want to install a charging pile, you must get the consent of the property. This mainly depends on the communication between the owner himself and the property.

    If the property agrees and meets the installation conditions, it will apply to the power supply station where the community is located.

    Work Safety Law of the People's Republic of China

    Article 29.

    Production and business operation units that adopt new processes, new technologies, new materials or use new equipment must understand and master the characteristics of their safety skills and fighting techniques, take effective safety protection measures, and conduct special safety production education and training for employees.

  7. Anonymous users2024-01-31

    Hello, according to personal experience, the following conditions are required to install charging piles in the small branch leakage area: 1. The confirmation of new energy car purchase conditions is very easy to get, as long as you buy a new energy vehicle, go to the 4S store to stamp a seal, to prevent some people from not buying new energy vehicles, but also install charging piles. Second, the property right certificate of the parking space If you want to install a charging pile, you must have the property right of the parking space, after all, the installation of charging piles is also a transformation.

    Third, the property application materials prove that this is the most critical, because you take this application to find the property, the better property will directly stamp you to finish, but most of the property will reject you, the reason is nothing more than that the community leaks early capacitance is not enough, the community does not allow the installation of charging piles, charging piles have potential safety hazards and other reasons to reject you, you can't refute it. When encountering this kind of situation, it can only be known with affection, moving with reason, saying that now the country has a policy, not allowing the property to block the owner from installing charging piles for any reason, or buy some cigarettes and alcohol in the past, usually look up and don't look down, the property will loosen up at this time, will let you standardize the charging Ha, don't mess around, or write a letter of responsibility, generally speaking, this time will become. After you prepare the above materials, ** a State Grid app to apply for charging pile installation, 1-3 working days, there will be staff to come to the site to investigate, install the meter, everything is ready, you can call the master to come over to install the charging pile.

  8. Anonymous users2024-01-30

    The process of installing electric vehicle cycling charging piles in the community is more complicated, it is best to have someone from the power sector involved in the application process:

    The installer needs to bring the original ID card (need to have a name with the real estate ownership certificate), the house ownership certificate (need to have a name with the ID card), the application report for the electricity use of the self-use charging pile, the purchase and purchase of the car contract and invoice, the certificate of use of the fixed parking space, the written document of the property approval god charging pile and other information, and go to the power supply business office or business hall to report for installation.

    The function of the charging pile is similar to that of the fuel dispenser in the gas station, which can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations, and can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected to the AC power grid, and the output end is equipped with a charging plug for charging the electric vehicle.

    People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging pile, and carry out the corresponding charging method, charging time, cost data printing and other operations, and the charging pile display screen can display the charging amount, cost, charging time and other data.

    As of the end of June 2020, there were 10,000 charging piles of various types in the country, of which 10,000 were public charging piles, ranking first in the world.

  9. Anonymous users2024-01-29

    The requirements for installing a charging pile are as follows:

    1. You need to go to the property center to sign the commitment letter for the installation of electric vehicle self-use piles.

    2. The circuit of the charging pile: the shell needs to be set with galvanized iron pipe or plastic pipe, and the wiring needs to be neat according to the specified line.

    Cable. 3. Installation of electricity meters: It should be installed at the designated position confirmed by both the power supply bureau and the property owner.

    4. Installation of charging piles: It should be installed at the designated position confirmed by the construction party and the property owner. The location cannot affect other rows.

    5. A suspended dry powder fire extinguisher of no less than 6kg must be installed above the parking space of the charging pile. In addition, two more than 4kg should be placed on the ground.

    Dry chemical fire extinguishers, which also need to be packed in a suitcase.

    Installation process:

    Prepare documents: ID card, real estate certificate, real estate ownership certificate, etc.

    Submit an application: Submit an application for installation online or at the business hall of China Southern Power Grid.

    On-site investigation: The staff will go to the site to investigate and judge whether it can be installed.

    Preparation materials: You need to purchase your own charging pile.

    Complete the installation: China Southern Power Grid staff will install the meter (free of charge), and the charging pile installation needs to find another person to install it (generally find charging.

    pile manufacturer arrangement). Silver.

  10. Anonymous users2024-01-28

    The process of installing electric vehicle cycling charging piles in the community is more complicated, and it is best to have someone from the power department intervene in the application process:

    The installer needs to bring the original identity certificate of filial piety (one name with the real estate ownership certificate), the house ownership certificate (one name with the ID card), the application report for the electricity consumption of the self-use charging pile, the car purchase contract and invoice, the certificate of use of the fixed parking space, and the written documents of the property approval of the god charging pile, etc., to the power supply business office or business hall to report for installation.

    Scheme of charger in ground charging station:

    The scheme of the charger in the ground charging station, the charger is composed of a rectifier that can convert the input AC power into DC power and a power converter that can adjust the DC power, and the DC power is inserted into the matching socket on the electric vehicle by inserting the plug with the wire, and the DC power is entered into the battery to charge it.

    The charger has a locking lever to facilitate insertion and removal of the plug, and the lever also provides a signal to confirm that it has been locked for safety. According to the communication between the charger and the on-board battery management system, the power converter code can adjust the DC charging power, and the charger can display the charging voltage, charging current, charging amount and charging fee.

    The above content reference: Encyclopedia - Electric Vehicle Charging Pile.

Related questions
14 answers2024-03-17

Those with the following diseases or physical defects will not be admitted >>>More

7 answers2024-03-17

Norway has set more detailed criteria for admission to foreign students, and the academic requirements for foreign students to apply for admission also vary. However, the usual admission requirements include educational background, study plan, English (or Norwegian) proficiency, and proof of funds. Norway is now a good university**, and it is possible to apply on your own. >>>More

25 answers2024-03-17

It mainly depends on what store you want to open, if it is a catering, you can choose a large number of communities nearby, commercial streets or schools, and a fixed ** is guaranteed.

9 answers2024-03-17

Just one condition: you must be a master!

The key reason why Microsoft has been able to "produce" thousands of loyal millionaires is that Microsoft has established a mechanism to recruit and cherish top tech talent, as well as a "rather scarce than abundant" model for selecting tech talent. >>>More

6 answers2024-03-17

1. Grade A qualification for water pollution prevention and control. >>>More