Carpet laying construction standards, carpet paving construction technology

Updated on home 2024-05-13
5 answers
  1. Anonymous users2024-02-10

    The carpet laying construction standard is based on the standard:

    Unified Standard for Acceptance of Construction Quality of Construction Projects GB50300-2001 Code for Acceptance of Construction Quality of Building Ground Engineering GB50209-2002 The details of the standard are too long.

    Ask me questions about the Ask Me Building Integrated Service Platform, if it is helpful to you.

  2. Anonymous users2024-02-09

    1. Clean up the grassroots level.

    1) The base layer of the carpet is required to have a certain strength.

    2) The surface of the base must be smooth, free of pits, textures, cracks, and kept clean. If there is oil stain, it must be scrubbed with acetone or turpentine, and the uneven places should be filled with cement mortar in advance.

    2. Cut the carpet.

    1) Depending on the size and shape of the room, cut the carpet from the long roll with an edger.

    2) The length of each section of carpet should be about 20mm longer than the length of the room, and the width should be calculated according to the size after cutting out the edge of the carpet. Pay attention to whether the direction of the carpet texture is consistent with the design.

    3. Nail the wooden card strip and the door pressing strip.

    1) When the carpet is fixed with a wooden strip (barbed board), the strip should be fixed on the base layer at a distance of 1 2cm along the foot of the wall around the room.

    2) At the door, in order not to make the carpet kicked up and the edge damaged, to achieve an aesthetic effect, aluminum alloy card strips and antimony strips are commonly used to fix. There are barbs in the card strip and antimony strip to fasten the carpet. The long side of the antimony strip is fixed to the ground, and after the carpet is laid, the short side is laid down and pressed against the carpet surface.

    3) The clamp strip and pressing strip can be fixed on the base layer with nail strips, screws and nails.

  3. Anonymous users2024-02-08

    One-year-old fiber, .Before the carpet is laid, the interior decoration must be finished. All heavy equipment in the room has been in place, commissioned, operated, and verified to meet the qualified standards.

    IIThe base layer of the floor blanket is required to be smooth, smooth and clean, and if there is oil, it must be wiped clean with acetone or turpentine. If it is a cement floor, it should have a certain strength, and the moisture content should not be more than 8%.

    Socks respectfully III. After entering the site, carpets, linings and adhesives should be checked to see if the quantity, variety, specification, color, pattern, etc. meet the design requirements, and if they do, they should be stored in a dry warehouse or room according to their varieties and specifications. Before use, it should be pre-paved, matched with flowers, numbered, and the design to be paved should be taken according to the number.

    Next, make the skirting boards around the rooms and corridors where the hotel carpet will be laid in advance. The lower mouth of the skirting board should be about 8mm away from the ground, so that the raw edge of the carpet can be hidden under the skirting board. Four.

    Before large-scale construction, the construction sample should be released first, and the model should be made, and then the construction should be carried out according to the requirements of the model. As a professional hotel carpet manufacturer, Yorkshire provides customers with professional carpet paving services, carpet laying by a professional installation team with rich carpet laying experience, and provides free return visits twice a year, lifelong maintenance services.

    You can get it for free

  4. Anonymous users2024-02-07

    Nowadays, many home floors will use carpets, which are both beautiful and practical. Next, PCHOUSE will talk to you about how to lay the carpet.

    1. Treatment of the ground.

    Carpets are generally laid on wooden floors or cement floors, and in order to ensure the quality of carpet laying, the ground should be treated clean and flat in advance. The pockmarked or uneven places on the ground should be smoothed with sandpaper, then filled with putty, and then rinsed with water.

    2. Laying method.

    Non-fixed: The non-fixed carpet laying is to cut and splice the carpet into the desired shape, spread the whole piece on the ground, and repair the corner of the wall, and do not need to be fixed on the ground. This type of paving is suitable for places where the carpet needs to be rolled up frequently or where heavy objects are not moved.

    Fixed: The fixed method of paving is to cut the carpet and splice it into a whole piece, and then fix it around the carpet. There are two ways to fix it:

    One is to stick the carpet to the ground with adhesive or double-sided tape; The other is to install wooden strips with nails with nails pointing upwards around the perimeter of the floor of the room, and then fix the carpet to the wooden strips.

    3. Carpet seams.

    Method 1: Use a needle and thread to connect the edges of the two carpets.

    Method 2: Place the adhesive tape at the seam of the carpet, one person takes the iron and dissolves the glue on the paper, and the other person immediately presses the carpet on the adhesive tape of the sol.

    4. Sequence of operations.

    1) Measure the size of the room and cut the carpet. Measure the size of the room with a box ruler and then assemble the carpet according to that size. It is important to note that the length of each section of the carpet should be 5 cm longer than the length of the room, and the width should be removed from the size of the thread buckle that needs to be cut off from the edge of the carpet.

    When cutting the blanket, the wool weaving direction of the interface carpet should be consistent to avoid the yin and yang sides.

    2) Splice carpets. After cutting the carpet, use one of the above two methods to splice the carpet. When splicing, pay attention to fixing one end of the carpet, and then straighten the carpet with a tensioner and then splic.

    3) Fix and clean. The carpet at the corner of the wall should be trimmed to the size of the corner with a wall knife, and then the carpet should be fixed with a flat shovel into the nails of the wooden card strip, and then sealed with a pressing strip, so that the carpet laying is completed. When you're done, remember to vacuum the carpet to clean the dust.

  5. Anonymous users2024-02-06

    Now, laying carpets is becoming more and more popular in home decoration, but many people don't know the correct way to lay carpets

    1. Treatment of the ground.

    The carpet is generally laid on the wooden floor or cement floor, and the pockmarks and pits on the ground should be flattened with sandpaper, filled with mud, and then rinsed and dried with clean water.

    2. Laying method.

    Not fixed:Cut and glue the carpet into a whole piece, pave it directly on the ground, do not bond with the ground, and repair it along the corner of the wall. This method is suitable for carpets that are often rolled up or room floors that are infrequent and heavy.

    Stationary:The carpet is cut, bonded and stitched together, and fixed around it with the floor of the room. There are two ways to do this:

    One way is to use adhesive or double-sided tape to stick the surrounding area of the carpet to the ground; The other is to install a wooden strip with a nail-facing nail on the floor around the room, and fix the back of the carpet on the wooden strip facing the small spike.

    3. Two methods of blanket seam

    (1) Connect the bottoms of the two carpets with a needle and thread.

    (2) Glue together

    The glue on the adhesive tape must be heated before it can be melted and pasted. You can first have an iron to melt the glue and put it on. When pasting, the adhesive tape is placed on the seam of the carpet, and one person takes an iron to melt the glue on the paper, and the other person presses the carpet on the freshly melted adhesive tape.

    4. Sequence of operations.

    1) Attach the size carpet of the room. The length of each section of carpet is about 5cm longer than the length of the room, and the width is calculated by the size of the edge buckle of the carpet and the carpet is test-laid.

    2) Spread the cut carpet on the ground, fix one side first, then tighten the carpet with a tensioner, and then use the above seam method to stitch.

    During the laying process of carpet, attention should be paid to making the wool weaving direction of the carpet consistent with the direction of the main light, so as to reduce the adverse effect of leaving reverse hair marks on the carpet when walking, resulting in messy marks irradiated by the light.

    3) After trimming the carpet with a wall knife, you can use a flat spatula to drive the carpet into the nails of the wooden card strip to fix it, and finally seal it with a pressing strip and clean the dust on the carpet with a vacuum cleaner.

    5. Precautions:

    1) The ground should be cleaned first, leaving no debris such as stones, wood chips, etc.

    2) The glue used in the carpet must be laid flat, and the interface should be glued firmly. If double-sided tape is used, it is simple, economical, practical and effective. This kind of double-sided tape, glued on both sides, cover the adhesive layer with plastic film, when using, remove the film and stick it on the sticky object.

    3) Pay attention to the junction between the carpet and the corner of the wall edge, etc., and there should be no seams and edge warping.

    4) The carpet interface should be coherent and consistent in color, and the seams should be hidden and not revealed.

    You can get it for free

Related questions
2 answers2024-05-13

The installation process of underfloor heating is as follows:1) Before the installation of floor heating, the floor screed should be inspected. >>>More

2 answers2024-05-13

Floor heating is a more complex construction project, because floor heating is a hidden project, so it is very complicated in construction, there are many precautions, so let me introduce to you, floor heating installation bright noise standard and floor heating installation precautions! If you want to install floor heating, you must first determine the type of floor heating, which can be selected according to your own needs. In the process of installation, it is necessary to ensure the flatness of the ground, otherwise it will seriously affect the use effect. >>>More

4 answers2024-05-13

Kiss! Hello, happy to answer your <>

The pro-construction process is as follows: 1. Preparation of virtual work, which includes quality inspection of raw materials, material preparation, confirmation of construction mix ratio, site cleaning, equipment status confirmation, etc.; 2. Measurement control, the process includes surveyors according to the requirements of the specification and equipment parameters to make points and lofts, generally marked with steel nails and red cloth; 3. Transportation, the process includes centralized mixing of mixed materials, and transportation of qualified vehicles to the site for paving after unified management; 4. Paving and shaping, the process includes the equipment entering the predetermined point, paving at a uniform speed, continuous and uninterrupted, rolling the roller to the surface without traces, process inspection and trimming; 5. Joint treatment, which mainly refers to the cleaning of the increased transverse joints due to construction interruption; 6. Health preservation, the process includes the setting of signs, sprinkling water to nourish the tung tree, etc. Points to note in the construction of water-stabilized layer 1, in the design of the mix ratio, in the case of meeting the strength requirements, choose a smaller amount of cement. >>>More

9 answers2024-05-13

Hello dear<>

Thank you very much for your question. The requirements of the road test sampling specification are; 1.Sampling Locations: >>>More

5 answers2024-05-13

The laying method of floor heating is: 1. Before the water and electricity enter the site, the owner + home decoration designer + home improvement project manager + heating technician will carry out on-site positioning and disclosure; 2. Clean up the garbage on site after the completion of hydropower construction; 3. The first phase of heating is used for construction and distribution of pipelines (a, laying insulation benzene board, b, laying mirror reflective film on the insulation benzene board, laying insulation edge strips on the edge of the corner, c, laying pipes on the mirror reflective film, d, fixing the nail on the pipeline, e, carrying out pressure test, the standard of pressure retention is: the minimum experimental pressure shall not be lower, generally can be raised, and then stabilized for 30 minutes, the pressure reduction does not exceed, and there is no water leakage, that is, it is qualified. >>>More