The hanging basket must be carefully inspected and recorded during the daily inspection, and each inspection item is specified below
1. Safety belts and helmets: All those who work at height must wear safety belts and helmets, otherwise they are not allowed to operate.
2. The safety rope used in the hanging basket must be fixed together with the main body of the building alone, and the fixation should be firm and reliable, and it cannot be placed above the big arm, with a safety rope and a safety lock for each person.
3. Counterweight: 1 hanging basket with 40 pieces, which must not be broken and sealed firmly with iron wire.
4. After the boom is installed, the front triangular support should be set up for the parapet, and the boom connecting screws should not be less than 2.
5. Wire rope: no loose strands, disorderly strands, bending, broken wires, broken strands.
6. Rope card: the number of rope cards at each contact point is not less than 4, the opening direction of the rope card is towards the load-bearing rope, and the wire rope contact has a protective ring.
7. Check the safety lock: let the hanging basket rise about 2 meters, let one end fall and tilt, loosen the safety lock pulley, and the safety rope on the safety lock work, so that the safety lock is safe, and then level and check the other end.
8. Limit inspection: 1 person operates the switch box, one person presses the limit collision point, the hoist does not rise, and the limit is safe.
9. Check whether the hanging basket is equipped with a fire extinguisher, and the construction personnel are strictly prohibited from smoking.
10. Check whether the wires and cables are broken and leakage, the distribution box should be hung off the ground, and the cables in the building should be hung on the wall.
The above answers are compiled and released by Q&A, hope.
-
Security measures should be checked.
-
1. We need to do some load testing on its gondola, and to some extent, this is actually in various components to see if everything is normal and safe.
2. It is also necessary to test the safety lock and safety of the hanging basket, because, if there is an abnormal situation, we must immediately close the maintenance.
3.If the test passes, we will start the overload detection, the electric gondola overload refers to the principal amount, if the overload source load capacity is or. If an unsafe condition is detected during this process, then we should immediately stop the test and find out the cause to solve it.
-
The learning on the building gondola will be involved today, the main ones are:
Content 1: What parts and components should be inspected for safety before the hanging basket equipment is shipped out of the warehouse?
Content 2: Construction hanging basket, in its actual use, which should be regularly inspected?
1.What parts and components should be inspected for safety before the gondola equipment is shipped out of the warehouse?
Before the hanging basket equipment is out of the warehouse, the parts to be inspected for safety are mainly as follows:
Safety locks, lifting devices, limiting devices, braking devices, wire rope anti-loosening devices, fasteners, reduction gearboxes, and transmission devices.
2.Construction hanging baskets, in their actual use, which should be regularly inspected?
The construction hanging basket, which should be regularly inspected in actual use, are:
1) Check the wire rope for serious wear or damage.
2) For each part, check how it is worn, deformed and damaged.
-
You have to go to the relevant department to issue a test report.
-
Before the construction of the construction gondola, the construction needs to be carried out by professional operators. At the same time, it is necessary to do a good job in the routine inspection and maintenance of the construction gondola to ensure the normal operation of the gondola during construction. For some hanging baskets that are idle for a period of time after new installation or overhaul, they should be tested and passed by professionals before they can be put into use again.
So, what inspections should be done before the construction gondola is put into use?
1. It is necessary to focus on checking whether the main stressed components such as suspension platform and suspension hanger are deformed and whether there are cracks in the weld;
2. Whether the fasteners at the joints of the components are lost or loose;
3. Whether the suspension mechanism is installed reliably and securely, and whether the counterweight meets the requirements;
4. Whether the wire rope is seriously corroded, loose, kinked or seriously broken, and whether the operation of the wire rope is safe and reliable;
5. Whether the operation of the electrical control system is flexible, and whether the unlocking and locking functions are normal
6. Check whether the gap of the electromagnetic brake meets the requirements for whether the lifting and lowering operation functions of the building gondola are normal;
7. Check whether the piecework operation is normal, observe whether the operation is blocked, and whether there is abnormal noise, such as: motor heating or smoke, burnt smell, etc.;
8. Whether the reducer and transmission device are filled or replaced with lubricating oil as required;
-
1.Daily maintenance: It does not involve the replacement of construction gondola parts, and the operator will carry out the oil change, cleaning, cleaning and maintenance of the hoist and the inspection and adjustment of the electromagnetic brake clearance on schedule.
Remove dirt from the wire rope and remove rust as much as possible. Remove dirt from the surface of suspended platforms, hoists, and safety locks.
2.Daily inspection: Before daily use, the operator should check according to strict requirements, especially the safety lock of the construction gondola, hoist and wire rope.
Professional maintenance personnel shall carefully inspect in accordance with the "Daily Inspection Items and Contents of Construction Hanging Baskets", and the projects that need to be repaired should be completed in a timely manner. It is strictly forbidden to work with sick in the construction basket.
3.Regular maintenance: The maintenance cycle is clearly defined by the user unit according to the use and working time (generally 1 2 months).
After the end of the use of the construction hanging basket machine, a comprehensive maintenance and overhaul work should be carried out. Professional maintenance personnel check the wear and tear of parts, replace wearing parts and damaged parts, disassemble and clean, and replace lubricating oil and grease. Check the wiring status of the electrical control box, the wires are not damaged, and there is no leakage of the whole machine.
Do a good job in the maintenance of the construction gondola and prolong the service life of the construction gondola.
What to do if the following situations occur in the electric gondola.
The electric gondola operator must fasten the qualified safety belt, the safety belt is hung on the safety rope to ensure that the safety lock is intact, the safety belt should be connected with the safety rope above the electric gondola guardrail, and the safety lock is synchronized with the rise of the electric gondola at any time, and the use method should be correct. During the use of the electric hanging basket, the main load-bearing rope and the safety rope must be guaranteed to be straight, and the safety rope cannot be bent above the safety lock of the electric hanging basket to ensure that the safety rope falls above the ground.
The wood, sundries or muck on the electric gondola should be cleaned up in time, and the tools and materials used should be stacked smoothly to prevent falling, and it is strictly forbidden to throw any materials down from a height. After the completion of each shift, the electric gondola will be reduced to the lowest point up and down the electric gondola, it is strictly forbidden to enter and exit from the high window, the electric gondola is shaking in use, the electric gondola should be temporarily reinforced, and the operation should be stopped in windy weather. In case of power failure or electric gondola failure, the operator stays in place and waits for rescue, and pays attention to the cable when the electric gondola is lifted and landed.
If you are asking MCU.
Programming. subb is subtraction with debit. >>>More
When using ozone to disinfect the workshop, there are four things that need to be paid attention to. >>>More
Gel Gel Precautions:
1.Do not mix gel with other adhesive materials. >>>More
1. The rated voltage of the diesel generator must be consistent with the voltage level of the external power line. >>>More
I don't think the pencil grip for elementary school students can be corrected, because the children's hands are not the same size, but the aligners are the same size, so they are not suitable.