To start construction, it is necessary to submit the commencement report, the general design of the construction organization, and the construction plan.
Of course, the foundation needs to be laid out, earthwork excavation, foundation groove inspection, cushion, earthwork backfill, if there is an independent foundation, it also needs reinforcement, formwork, and concrete.
The foundation groove, steel bar, and formwork should be concealed, and the concrete should be tested as a test block. The foundation, the foundation, and the main body should be separately data, and the final distribution items are also separate, and these two pieces are the most important.
The main body is, of course, formwork, steel, concrete, which are essential.
Is it completed, of course, it is the completion report, the project is introduced! ~
In the specific project, there should be construction technology disclosure, construction records, various test reports, raw materials for review, etc.
It is best for you to buy a book for reference, and go to the quality inspection station to ask what information you want, the quality inspection station wants more information, and the check is more detailed.
-
From the perspective of the information provider, there are information provided by all parties involved in the construction:
Survey unit: survey report, groove inspection record, brazing record, etc.;
Design unit: design change, design drawing, quality assessment report;
Construction unit: geophysical prospecting report, construction permit, quality supervision letter, quality assessment report, etc.
Supervision unit: design disclosure, quality assessment report, etc.
Construction unit: sub-item inspection batch information, raw material manufacturers provide and test data, quality inspection notice reply, etc.
-
The project acceptance data is divided into the following parts: the first part, the preliminary documents of the project 1Feasibility study report and annex 2Approval opinions of the feasibility study report 3
Plan task book and approval 4The application documents for the inclusion of the construction project in the annual plan 5The construction project is included in the approval document of the annual plan and the annual plan item list 6
Approval documents for land requisition, demolition and relocation (including documents for demolition, compensation, etc.), etc. The second part, the project completion acceptance documents. 1.
Project Overview Table 2Project completion summary 3Unit (sub-unit) project quality completion acceptance record 4
Unit (sub-unit) project quality control data verification record) 5.Unit (sub-unit) engineering safety and function inspection data verification and main function spot check records. The third part, construction technical documents; Include.
1. Architectural and Structural Engineering; 2. Building water supply, drainage and heating engineering documents; 3. Building electrical engineering documents. Fourth, intelligent building engineering documents; 5. Ventilation and air conditioning engineering documents 6. Elevator engineering documents. Part IV:
In addition to the above documents and materials, the fifth part of the supervision documents and materials such as material inspection and engineering inspection: as-built drawings; 1. Building as-built drawings; Second, the structure of the as-built drawing; 3. As-built drawings of water supply and drainage; Fourth, the heating as-built drawing; 5. Electrical as-built drawings; 6. Ventilation and air conditioning as-built drawings. Part VI:
All kinds of audio-visual materials related to the project (indicating the text description, project name, location, time, construction site, etc.) and other related materials.
-
You buy a good building software that has examples in it.
-
It is an engineering discipline that builds various facilities and places for human life, production, protection and other activities, covering the construction of buildings, structures and engineering objects in the facilities and places within the scope of aboveground, underground, land, water and underwater, etc., including the construction of buildings, structures and engineering objects within the scope of facilities and places such as aboveground, underground, land, water and water, underwater and other projects, including the survey, design, construction, maintenance, management and other technical activities in the process of engineering construction, as well as the materials consumed in the construction process. Equipment & Items.
Civil engineering and construction projects involve the existence, activities and development of all walks of life in the national economy, and there is no space and place for civil engineering and construction projects to build activities for them, and there can be no talk of the existence and development of all walks of life. All this shows the importance of civil engineering and construction engineering, so it is also called civil engineering and construction of infrastructure.
-
Quality inspection data and safety data.
-
You're a data clerk. There are a lot of civil engineering materials.
-
First of all, be familiar with the drawings
Familiar with the site, familiar with the construction management data, familiar with the construction technical data.
Familiar with the specifications, familiar with the construction process
Familiar with the content of the acceptance of the division: the acceptance specification of the national standard for civil engineering data has nine divisions of the original project, and the existing energy-saving division has been added, a total of ten divisions, foundation and foundation, main structure, roof, decoration, water supply, drainage and heating, electrical, intelligent, ventilation and air conditioning, and elevator. (GB).
Each division has a number of sub-items, and then a number of inspection batches are divided according to the engineering parts, and the data starts from the inspection batch. At the same time, it is necessary to simultaneously carry out the inspection of incoming materials and the sampling and retest of incoming materials. Division, sub-item, inspection batch.
The inspection materials include: commencement report, construction organization design, inspection of incoming materials, sampling and retest of incoming materials, and retest report.
According to the project part of the inspection: production and installation inspection batch, sub-item acceptance, sub-acceptance, unit project completion acceptance.
Construction management data: construction organization design: management personnel, machinery, labor, construction schedule.
Construction technical data: drawings will be reviewed. Design changes, engineering visas, etc.
There is a unified ** fill in according to the unified information **, fill in according to the requirements of the specification.
The civil engineering data you mentioned should be (construction quality acceptance data management regulations) belong to the construction quality management data. Instead of the Technical Data Regulations, construction management data and the Technical Data Regulations are different management data categories. Thank you.
-
p This question is difficult to explain, one of the five members, you have to learn a construction site to almost understand,
-
Drawings are very important, follow others first, you don't have to learn all to do it yourself, and the people who can really learn from the master are a minority after all.
-
The first step is to understand the drawings, know the production process, go to the construction site to see if you have nothing to do, and check the information after you come back**.
-
According to the "Technical Data Regulations", don't go wild.
-
Familiarize yourself with the program, and don't send the wrong experiment.
-
You can go to the 94 Architecture Forum to learn about it.
-
This is a very general statement, specifically to look at the drawings and construction specifications.
Civil construction, right? What civil engineer? It's too big. >>>More
1. First of all, you must learn to read the construction drawings, learn the construction process on the basis of the construction drawings, know the overall process of construction, and you will not miss some details when doing the cost. >>>More
The technician is the one who carries out various technical work under the leadership of the engineer in charge. 2. Cooperate with the engineer in charge to prepare a monthly report on the quality and safety of the monthly construction progress, report the capital budget and specific payment in the field under his management to the engineer in charge, and participate in the contact and coordination between the relevant project and the first department, the design unit and the construction unit before the start of construction. 3. Responsible for the preliminary review of the construction organization design submitted by the construction unit, and cooperate with the supervision during the construction process to be fully responsible for the construction inspection and acceptance of the relevant projects until the completion and acceptance are delivered to use. >>>More
Introduction to Inorganic Non-metallic Materials EngineeringTraining Objectives: This major cultivates senior engineering and technical talents who have knowledge of inorganic non-metallic materials and their composite materials science and engineering, and can be engaged in scientific research, technology development, process and equipment design, production and operation management in the fields of inorganic non-metallic material structure research and analysis, material preparation, material forming and processing. Cultivation Requirements: >>>More
Superwool is super cotton, which is a biosoluble fiber cotton, which replaces ceramic fibers and asbestos, and can be born without degrading. Beijing Fei Pufu.