-
There should be no scientific research, but the ancient craftsmen were very powerful, and there would still be drawings or something before workmanship.
-
A project must be studied, whether it is the size of the project, the cost, the investment, the operation, etc., as well as the impact on the surrounding people, the environment, the economy, the social atmosphere, whether the project can be planned for several months or even two or three years.
-
Answer: 1. Determine the basis for project construction.
2. The basis for applying for a bank loan.
3. The basis for the design of the construction project.
4. The basis for the competent department of the construction project to negotiate the contract and agreement with the relevant departments.
5. The basis for the development plan of new technologies and new equipment.
6. The basis for the construction project to supplement the topography, geological work and supplementary industrial test.
7. Arrange the plan and carry out the reference of the preliminary work of the construction.
8. The basis for applying for a construction license from the local ** and environmental protection departments.
-
A feasibility study report is the development of a construction or research project.
Previously, a written report was written on the feasibility and effectiveness of the implementation of the project, as well as the technical scheme and technical policy, in order to determine a technically reasonable and economically cost-effective optimal scheme and the best timing.
The main content of the feasibility study report is to require a comprehensive and systematic analysis as the main method, economic benefits as the core, around the various factors affecting the project, the use of a large number of data to demonstrate whether the proposed project is feasible. Propose a comprehensive analysis and evaluation of the entire feasibility study, and point out the advantages, disadvantages and suggestions. In order to meet the needs of conclusions, it is often necessary to add some attachments, such as test data, demonstration materials, calculation charts, drawings, etc., to enhance the persuasiveness of the feasibility study report.
Feasibility study report is to determine the construction project before the decisive work, is before the investment decision, the proposed project for a comprehensive technical and economic analysis and demonstration of the scientific method, in investment management, feasibility study refers to the proposed project related to the natural, social, economic, technical and other research, analysis and comparison and social and economic benefits after completion. On this basis, the necessity of project construction, financial profitability, economic rationality, technological advancement and adaptability, as well as the possibility and feasibility of construction conditions are comprehensively demonstrated, so as to provide a scientific basis for investment decision-making.
-
First of all, we must figure out what is a project establishment? What is a feasibility study?
Project approval is actually an old saying, now the state has carried out investment system reform on investment, the project is divided into three ways of approval, approval and filing according to the investment subject and funds, and the national investment and the use of state-owned funds to invest in the project to implement the approval system, the implementation of the approval system of the project needs to submit a feasibility study report to the development and reform department, such as municipal road projects; The approved projects are mainly private investment, and the projects in the very quasi-catalogue issued by the state are very accurate, and such projects do not need to be submitted for feasibility study, but only need to submit project application reports, such as real estate projects; Filing projects do not require feasibility studies and do not need to apply for reports, which is the most lenient type of projects, such as some industrial projects.
A project can only be called completed if it has been approved, approved or filed according to the above three types.
If you are a first-class investment project, you need to prepare a feasibility study report first, and then add some other attachments, such as land pre-examination opinions, environmental impact assessment, energy assessment, site selection opinions, etc., and submit them to the development and reform department for approval. Without a feasibility study report, the development and reform department will not approve it.
Therefore, the project is established after the feasibility study, and only when it is proved that your project is feasible, the *** department will review and agree to the implementation of the project.
-
Engineering Project Issues...The feasibility analysis should be carried out before the project is initiatedBefore the project was established.
-
From an investment point of view
To speak: any construction project must do a feasibility study of the project, if you are the boss of the dao, do you not carry out a feasibility study, will you invest?
From the perspective of project management: competitive investment projects (enterprise investment projects) do not need to prepare a project feasibility study report (some require a project application report, and some only need to be registered for the record).
**The project feasibility study report must be prepared for the investment project.
-
As long as you have the know-how for a technically mature small-scale production project and understand its market situation, then such a construction project can be carried out without a feasibility study.
-
The main contents of the feasibility study report can be:
Project Brief Introduction. Market analysis.
Product introduction and product process.
Project site selection plan and construction plan.
Investment estimates. Financing options.
Financial analysis. Project implementation schedule.
Conclusions of the analysis of the economic and social benefits of the project.
-
In fact, you can go to the e-project international service platform to publish, this platform is very good, if you want to do feasibility research, you can directly publish your needs in it, there will be a very professional company or individual to give you the best, and then you can choose a cost-effective unit or individual to help you write. It's really convenient.
-
There are a lot of people who always have a preconceived idea when doing a feasibility study report, and my project must be feasible. In fact, the feasibility study report is a systematic thinking method. Any feasibility study report contains elements that are not feasible.
From what the author has done and combined with the experience of relevant peers and friends, I only put forward four key decisions. Take a look at market viability. The current market status quo or market**, i.e., the existing value and future value space.
Second, look at the feasibility of management, whether the current management ability can be matched, or what level can be achieved after adjustment, and whether the project can be completed. Third, look at the technical feasibility, the current level has reached the first, and whether it can be achieved after improvement. Fourth, looking at economic feasibility, to realize this project, it is not worth it from the perspective of cost-effectiveness, and it is not economical from the perspective of time cost.
-
Feasibility study, environmental assessment, energy assessment, safety assessment, and health assessment are generally in this order.
-
The work of the whole process of the project generally refers to:
1. Prepare project proposals according to the current situation of the enterprise, development plan and project research;
2. Demonstration of the project proposal, and preparation of the feasibility study report on this basis;
3. Conduct safety assessment and environmental impact assessment of the project and complete the project;
Fourth, according to the approved feasibility study report, prepare the preliminary design report;
5. According to the preliminary design of demonstration and approval, carry out construction drawing design;
6. Organize construction according to construction drawings, control construction progress, and ensure construction quality;
7. After the construction is completed, the linkage test will be carried out as required;
8. The trial production experience was qualified and officially put into production and delivered.
Safety assessments, environmental assessments and health assessments are all completed before the project is initiated, and are generally completed before or during the feasibility study report.
-
Yes, at least the EIA must be.
-
Generally, it is the order of feasibility study, environmental assessment, energy assessment, and peace.
-
Yes, without this preparation, the project could not have started.
-
Because of the feasibility analysis report of the project, you can directly know: "the necessary conditions for the project in management, technology, economy, social adaptability and many other aspects". It can minimize all kinds of unnecessary losses caused by project investment, and can lay a solid foundation for the ultimate success.
-
Because it is the foundation, it is the foundation, and without a feasibility analysis, it is impossible to determine whether the project can be carried out, whether it is worth carrying out, whether it will waste resources, whether it can be successful, and so on.
-
If there is no feasibility report, the project itself is plagued by various uncertainties and unrealistic factors.
Modern people are accustomed to three meals a day, in fact, the Qin and Han dynasties. >>>More
The ancients were usually very elegant, and when it snowed, they would be full of poetry. Write a song for hours in the middle of the snow and ice to entertain yourself. Many of the masterpieces that have been handed down in this way are related to snow. >>>More
Solution: For this project, it takes 24 days, 20 days, and 30 days for A, B, and C to do it separately. >>>More
A, B and C completed a project together, completed all 1 5 in 3 days, and then A rested for 3 days, B rested for 2 days, and C did not rest, if A's workload in one day is 3 times that of C's workload in one day, and B's workload in one day is 4 times that of C's workload in one day, then how many days does this work be completed from the beginning? >>>More