What books should I read if I want to learn about self installation budgeting?

Updated on educate 2024-05-02
9 answers
  1. Anonymous users2024-02-08

    Get rid of the words all over, what "learn from" is self-taught.

    Basically, it's a bit difficult to understand, isn't it the same as being confused?

    Don't care about anything else, install water, electricity and HVAC, and then how you will first look at the drawings to do the cost.

    I'm from Jiangsu, you first go up**above** to read the legend with some basics. Another ** good, introduced to you, there are many novices in it who can communicate, and the division of labor in the professional forum is also very clear. Starting with hydropower, water must be simple.

    You'll have to memorize the legend first, and then find some people to start talking about how to read the diagram.

    Then you should be able to find the quantity calculation rules above. You have been counting according to the above for a long time.

    Then there are the quotas. This is a book that needs to be bought. Go to the quota station and sell a set of quotas.

    It is the price of materials and the price of equipment.

  2. Anonymous users2024-02-07

    Construction project pricing (installation), 03 installation quota.

    The above books can only be bought at the cost station, and cannot be bought in general bookstores.

    Budgeting is to calculate the quantity first and then set the price, so you must first learn to calculate the quantity of work, and then be familiar with the set of quotas.

    Hope it helps!

  3. Anonymous users2024-02-06

    Go to your local construction bookstore to buy the BCA's cost officer training materials or attend training.

  4. Anonymous users2024-02-05

    <>What is an installation project and budget? What are the contents of the installation project and budget book? The following is an introduction to the main contents of the installation project and budget book brought by Zhongda Consulting for reference.

    The budget is the final outcome document of the project budget or construction drawing budget. It is an important basis for the implementation of design drawings.

    The installation works and the budget book are generally covered by the budget book; Instructions for budget preparation; Project cost calculation table; Quantity summary table; Project budget table of each division; The design modification change notice consists of several parts.

    The cover form of the installation project and budget is generally designed by the preparation unit itself. It shows the essence of the entire budget in a simple and straightforward form. There is no uniform provision for the specific type, but the display content should include the name of the project and the construction area; project cost and unit cost; construction units and construction units; reviewers and preparers; What is the time of review and preparation time?

    Instructions for budget preparation;

    The preparation note is a supplementary description to the budget document. It provides a supplementary basis for the reviewer and the completion of the final (final) accounts. The content of the description is as follows:

    1) Basis for compilation.

    The full name of the design drawings and design units of this budget.

    The name and period of the quota on which the budget is based (including the budget quota and the cost quota).

    The name and symbol of the other document on which the calculation is based.

    The qualification level and project category by which the bill is billed.

    2) Changes in drawings.

    Change the location and name in the construction drawing.

    The name of the construct that is pending for some reason.

    Because it involves the review of drawings or the relevant issues that need to be explained on the construction site.

    3) Issues related to the implementation of quotas.

    Related issues that have been and have not been considered in the present budget in accordance with the quota requirements.

    A statement of the supplemental or borrowed quota made in the present budget due to the shortfall of the quota.

    Relevant issues negotiated by Party A and Party B.

  5. Anonymous users2024-02-04

    Summary. You can buy a set of installation budget quota to see. In addition, other books on project cost must read "jump out of the cost to do the cost", and others want to see the 2013 list pricing specification (no need to buy, to an electronic version).

    You can buy a bucket to dismantle the set of installation budget quota royal relatives to see. In addition, other books about the cost of the project must read "Jump out of the cost to do the cost", and if you want to see it, you can see the 2013 list pricing rules (no need to buy, you want an electronic version).

    Is this book okay?

    This is also possible.

  6. Anonymous users2024-02-03

    First of all, you have to start by looking at pictures, which basically doesn't need to be learned, it's not difficult. The company must have drawings for the project, the plane façade, look at it, and see it. You know how each part looks in the plan, how it looks in the façade.

    The plane looks at the length and width, and the façade looks at the height. Cross-sectional look at the content. Get the diagram and look at the index chart, which is a detailed representation of the indexes of the various parts of the above subject to other graphs.

    Look at one or two drawings and probably no problem.

    Secondly, try to calculate the amount of work, before you should master some construction technology. In other words, you have to understand the construction process to know which ones to count. What materials are used in each part of the construction process, only by knowing these, you can know the amount of what to calculate (and understanding the construction drawings is the key).

    There is also a look at the engineering quantity calculation rules, and then, to the set of quotas. The quota should be looked at carefully first (look at the calculation rules, pricing specifications). This has been a long time, and you will know if you count one or two projects. And now the quota is set with software, which is very simple.

    In fact, when you start making a budget, you can only calculate the amount of work on the premise of understanding the construction drawings.

    If you have the opportunity, it is recommended that you take some training on cost.

    To put it simply, the basis of learning the budget is to read the map, you want to calculate it if you can't even understand the map, and then there are the calculation rules, the budget is actually in accordance with the rules, no one can calculate how they want, the budget can be simply divided into three steps, the amount, the price, the fee, now the budget is used software, so it is also very important to learn the budget software. If you have the opportunity, you will get in touch with the actual things on the construction site, and you will make rapid progress.

  7. Anonymous users2024-02-02

    It is more difficult to learn by yourself, or find a master to take it, and then buy a set of cost software, the better cost software is Glodon and Zhulai.

  8. Anonymous users2024-02-01

    The local consumption quota is to be seen (need to understand and understand the composition of the unit price of the quota), the architectural drawing is to be seen (understand this to understand the drawings, the calculation), excel must be able (and very proficient), the software depends on the region, because now there are local budget software in various places (such as: Glodon, Pengye, Shenji, etc.).

  9. Anonymous users2024-01-31

    Look at the calculation rules, quotas, and list pricing specifications.

    Learn Glodon, New Pentium, PKPM, and other software.

Related questions
7 answers2024-05-02

The pooling coefficient = the sum of the common floor area to be pooled divided by the sum of the floor area of each unit participating in the pool; >>>More

7 answers2024-05-02

The two "payables" of the budget payable and the special financial account payable have both similarities and differences, and the similarities are: the funds of the budget payable by public institutions in accordance with the provisions of the financial department, and the non-tax income payable from the special financial account are all fiscal funds, which should be settled on a daily and monthly basis, and must be fully settled and paid at the end of the year, leaving no balance. Differences: >>>More

3 answers2024-05-02

First of all, you have to do a good job of anti-static electricity, because they are easily static"Killed".Second, if it is software installation, at least ensure that the system disk has 2G free space, if it is not enough, please change the installation location to other disks when installing other software, such as def, etc. >>>More

8 answers2024-05-02

If you want to learn systematically, you can consider signing up for a live online class, and recommend CGWANG's online class. The teacher speaks carefully, you can watch it back after the class, and there are also the same type of recorded classes that you can learn for free (give away lifelong VIP). >>>More

12 answers2024-05-02

How should I maintain my heart stent after acute myocardial infarction? The installation of cardiac stents in acute myocardial infarction is one of the effective measures to alleviate myocardial ischemia, however, the installation of cardiac stents is not a one-time thing, but the beginning of a first-class way, that is to say, the disease is not good, and it needs to be carefully maintained in the future. So, how to maintain it in the future? >>>More