Jinshen dry hanging glue is produced there

Updated on home 2024-06-06
6 answers
  1. Anonymous users2024-02-11

    1) Process flow: material selection, wall pay-off, grid plate positioning, widow and widow, Dou Dou live, Cangao apologize for the father's book? 2. Expansion bolts, angle steel welding and installation plate slotting, installation of stainless steel pendants, adjustment and fixing, dry hanging plates, pasting anti-fouling strips, marble glue caulking, cleaning, inspection and acceptance (2) The stone should be selected, the geometric size must be accurate, the color must be uniform, the stone is uniform, the back is flat, and there are no defects such as missing edges and corners, cracks, etc.; (3) The drilling position of the expansion bolt should be accurate, the depth should be in, the ash powder in the hole should be cleaned before the expansion bolt, and the bolt should be buried vertically and firmly.

    The connecting iron parts should be vertical, square, not allowed to warp, and uneven should be corrected; (4) The angle steel drilling must prepare a mold, drill according to the mold, and the stone slotting and angle steel drilling position must be accurate and consistent; (5) The surface of the base layer of dry-hung stone should be solid, smooth and clean. There should be an adjustment gap of 8-9m between the plate and the structural layer. According to the size of the stone plate and the position of the expansion bolt, the line is leveled and divided, and the number is numbered according to the requirements of the drawing; (6) The installation of the stone should be carried out from bottom to top, the stone should be arranged in order of the bottom plate, the side connector should be put on first, and the panel should be fixed with marble dry hanging glue after adjusting the panel; After the stone is finished at the same level, the surface smoothness and levelness should be checked, and then caulked after the plywood, and the surface color of the stone in the same part must be uniform; (7) After pasting anti-fouling strips around the stone, the marble glue should be embedded to avoid pollution.

    Marble glue should be embedded and dense, smooth and smooth, and its color is consistent with the color of the stone; (8) After the dry hanging of a certain part of the stone is completed, it should be inspected and accepted, and the unqualified place should be dealt with in a timely manner.

  2. Anonymous users2024-02-10

    Dry hanging glue; Applicable to, "dry hanging" generally refers to the construction method of connecting the steel skeleton with the stone base layer and then connecting the steel skeleton with the stone with stainless steel pendants.

  3. Anonymous users2024-02-09

    Of course, there are public security checkpoints from Tianjin to Shenyang, the first one at the junction of Tianjin and Tangzhou, Gaojiawei checkpoint. The second is at the Shanhaiguan checkpoint. The Shanhaiguan checkpoint is the strictest.

  4. Anonymous users2024-02-08

    The G1 highway is flat. The freight vehicles along the way are quite good compared to the G3 highway. There are no major repairs along the way.

  5. Anonymous users2024-02-07

    Driving routes: The whole journey is about kilometres.

    Starting point: Tianjin Binhai International Airport.

    1.From the starting point, drive due east and drive straight onto Airport Boulevard.

    2.Drive along Airport Avenue for a kilometer, towards the central city Jingjintang Expressway S40 Jinhan Highway, and turn slightly right into the Airport Bridge.

    3.Drive along the airport bridge for kilometers and go straight into Jinhan Highway.

    4.Drive along the Jinhan Highway for kilometers and turn right into the Jinhan Liaison Line.

    5.Drive 800 meters along the Jinhan Liaison Line and go straight onto the ramp.

    6.Drive along the ramp for kilometers and go straight into the Beijing-Tianjin-Tang Expressway.

    7.Drive along the Beijing-Tianjin-Tang Gaobei Highway for kilometers, exit S1 of Jinzhonghe Street in Jixian County, and turn slightly right into the Jinzhong Road Viaduct.

    8.Drive 160 meters along the Admiralty Road Viaduct, cross the Second Gas Overpass for about 900 meters, and go straight into the imitation Chun Najin Thistle Liaison Line.

    9.Drive along the Jinji Liaison Line for kilometers, towards S2 Jinning Pants Noise Expressway S30 Beijing-Tianjin Expressway, and turn slightly right into Jinji Expressway.

    10.Drive 40 meters along the Jinji Expressway and go straight into the Jinji Expressway.

    11.Drive along the Jinji Expressway for kilometers, towards Shenyang Beijing G1, turn slightly right into Baodi North Interchange.

    12.Drive 930 meters along Baodi North Interchange, cross Baodi North Interchange for about 700 meters, and go straight into Beijing-Harbin Expressway.

    13.Drive along the Jingha Expressway, cross the Baodi Bridge, exit S101 at the east of Baodi District, Xiacang, and turn slightly right onto the ramp.

    14.Drive along the ramp for kilometers and go straight onto the Jingha Expressway.

    15.Drive along the Beijing-Harbin Expressway for kilometers, cross the Baodi Bridge for about kilometers, and arrive at the end point.

    Destination: Beijing-Shenyang Expressway Jinji.

  6. Anonymous users2024-02-06

    On how the protagonist was broken by the system" by Tu Cai (the main orange guess to take the round with Zhaosen).

    Microdisk --- lookout.

Related questions
10 answers2024-06-06

Cyanoacrylate, i.e., instant fast-following glue, ingredient cyanoacrylate glue, is a one-component, fast-curing adhesive synthesized through advanced production processes. Cyanoacrylates are versatile, easy to use, have very fast curing speeds, high bond strength, a wide range of bonding areas, and good adhesion to a variety of substrates such as metals, plastics, rubber, elastomers, paper, leather, fabrics, etc.