The first floor is about the construction team model.
Formal enterprises divide labor according to people.
-
<>1. Data software: The current data clerk has the corresponding working software, and the software provides all the information of the travel fiber. Therefore, the first step is to master the use of technical data software for construction work.
I use Hengzhi Tiancheng. The software comes with a tutorial, and you can generally talk and tease after learning for a day. As the saying goes, "sharpening the knife is not the wrong woodcutter", and the data software is the tool in the hands of the data clerk.
Only skillful use can be handy.
2. Data content: that is, what to do. Construction data includes building data and safety data, and we mainly do sub-divisions and sub-projects for building data.
Our unit has a book on information, and I recommend the "Code for Acceptance of Construction Quality of Construction Projects", "Example of Filling in Hebei Data", and "Guide to the Preparation of Technical Data for Construction Engineering". It's not okay to make materials without reading, and you can live and learn. There are nine divisions in total, and I only uploaded the building electrical division.
These nine divisions must be well understood. Each subdivision consists of a number of subdivisions, and a subdivision consists of multiple subdivisions. Generally, the experienced foreman will write the technical disclosure himself, and the average foreman will let the data clerk do it.
Before the start of construction, there will be a review of the drawings, and we will sort out the content of the review.
3. Construction data after the start of construction: The most data is the inspection batch, and the data is synchronized with the construction progress. The completed information is sent to the supervisor for signature and seal, and the construction can be carried out.
4. To do data, you must understand construction knowledge: The data clerk must often go deep into the construction site to understand the progress of the project. When to tie the rebar, when to install the formwork, when to pour the concrete.
The time on the data should be consistent with the construction time. If you are not sure, you can check the foreman's construction log. Of course, not all foremen keep construction logs, and the level varies widely.
You can also see the supervision construction log. The data can be verified layer by layer. Sign the date, the name of the person, and the chapter, and send it to the superintendent after dismantling the imitation.
The information should be done in advance, and the ones left for the supervisor and those to be taken back by themselves will be separated, and a lot of trouble will be reduced in the later stage. Of course, there are also those who lose the information and repay the account due to the long construction period when the supervision project is completed. Then I have to admit bad luck.
5. The supervisor will often give a notice to the superintendent, and the reply work will be done by the data clerk. Be sure to reply to the questions he raised in combination with the construction situation on site, it will not work behind closed doors. If you don't understand something, ask the supervisor and the foreman for advice.
6. When the main body is capped, there will be a completion acceptance. The acceptance content is that the data clerk reads the content of the completion, and the supervisor reads the content of the supervision. The person of the quality supervision station is responsible for the inspection of the acceptance situation. Will go around the building. Fault finding.
7. The information should be sent to the quality supervision station for acceptance, and then sent to the archives for acceptance. These two places should have acquaintances and be easy to do.
8. Acceptance of infrastructure structure and main structure. After the foundation of the project is completed, there is a basic structure acceptance work. After the completion of the main body, there will be the main body acceptance.
-
What does a data clerk do???
Specific things to be done Collect, archive and sort out various materials such as licenses and contracts in the early stage of each development project. Collect, archive and sort out various types of data such as drawings, supporting facilities, budget and final accounts of various development projects. Arrange the sending and receiving of drawings and materials for construction projects.
Collect all kinds of technical books and magazines. Refine workflow documents. The data clerk is responsible for information documents such as:
Organize and keep management documents, notices, relevant technical documents, construction technical standards, process standards, construction specifications, atlases, construction drawings, construction organization design, project quality plans, etc. The information formed in the construction process such as: construction technology disclosure, project contact form, change visa form, project negotiation records, meeting minutes, process checklist, equipment installation checklist, commissioning records, engineering hidden (pre)inspection records, design changes collation, preservation and archiving.
Preparation of data, processing of texts such as project pre-settlements. There are two results of working as a data clerk: one is that the mechanical work is always repetitive, and in your words, there is no future; One is to work hard to fully understand and grasp the work you are going to do in the future through the work of a data clerk.
Data clerk is the most basic and comprehensive job in the construction industry. I think that if a new employee wants to develop, he must start as a data clerk. The work of a data clerk seems to be very trivial, and it seems to be a job that can be done by an individual, but if you want to do a good job as a data clerk, it is definitely not something that anyone can do casually.
The scope of contact with the data clerk is too wide, and there are things related to safety, quality, technology and comprehensive on-site management in the construction industry, such as laws and regulations, construction quality specifications, technical standards, safety standards, etc., you can all come into contact. Especially for new employees who have just entered the industry, as long as you want to do a good job, at least the work of a data clerk provides you with a high starting point for comprehensive learning. In the process of working as a data clerk, you can purposefully and consciously focus on which part of the content to learn, lay a solid foundation for your future development direction, and it is also a process for you to gradually show your talents in a certain field.
1) Work under the leadership of the project manager and the technical director, implement the ISO9001 quality system program management operation, be responsible for collecting the documents and engineering data of the construction site for sorting and keeping, and require the project data to be neat and complete. >>>More
As a construction clerk who has been in the industry for 10 years, I have always thought that the data clerk seems simple and boring, but it actually requires a lot of patience and excellent literacy. A good data clerk can do everything on several construction sites, while an apprentice or a newcomer can only be tired of running around and feeling sorry for himself. This is the same phenomenon as any other management profession. >>>More
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
Responsibilities of the data clerk.
1.Conscientiously implement the Archives Law, and strictly collect and sort out all kinds of original materials. >>>More
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More