What issues should be paid attention to when signing a decoration design contract?

Updated on home 2024-06-16
6 answers
  1. Anonymous users2024-02-12

    1. How much should the liquidated damages be set?

    In order to prevent the designer's deliberate procrastination, a liquidated damages can be set in the contract to restrain the designer. The purpose of liquidated damages is not really to fine, so it is more reasonable to customize it in tens of yuan a day.

    The supervisor reminded that the formulation of liquidated damages is still very necessary, which largely restricts the phenomenon that designers cannot complete the drawings on time due to a large number of orders or other reasons. At the same time, it can also avoid the loss caused by the delay in the construction time.

    2. What should I do if there is a dispute?

    In the process of decoration, if there is friction or disagreement between the two parties, try to resolve it through negotiation. If it can't be solved, it can only be dealt with through the relevant departments.

    Supervisor reminds: Compared with the decoration company, the design work is not responsible for the construction, and the friction will be less. At present, it is rare for the owner to be dissatisfied with the design drawings, and the designer is unwilling to change them. However, it is better to write clearly in the contract the way of settlement.

    3. Are there any restrictions on the free program?

    Accompany the selection of materials, cooperate with the construction, and help pick soft decoration, some design studios of these projects are free, but this free project is also very important to the owner.

    Supervision reminder: You can indicate on the contract that you can accompany the owner to the building materials market several times, inspect the construction site several times, and accompany the selection of soft decoration times. If possible, it's best to feel the market yourself before and know what to expect.

    For example, when matching furniture and curtains, you can go to the store to make proofs first, and then help yourself confirm when the designer is present.

    4. How to prevent design subcontracting?

    In the early stage, I had a good relationship with the designer of the main project, and after paying a not cheap design fee, it turned out that this design plan was not made by the designer, which was a waste of money.

  2. Anonymous users2024-02-11

    1. Pay attention to the area of design charges.

    The designer's fees are calculated by area, and it is necessary to pay attention to the three area concepts of the house, that is, the construction area, the usable area and the construction area of the suite. When signing the design contract, the owners must pay attention to the calculation method of the design fee, pay attention to whether the corresponding area is correct, and do not mistake the concept of these three areas to prevent being accidentally overcharged.

    2. Pay attention to the payment method of the design fee.

    In the contract, the owner should agree with the designer on the payment method of the design fee, generally speaking, the design fee is paid in four times, the first design fee will be paid after signing the contract and before measuring the house, generally 20% to 25% of the total design price or about 1000 yuan in advance. The second design fee is paid after the preliminary plan is finalized, and the cost is 50% of the total design price. The third fee is paid after the drawings are confirmed in the design stage, and the fee is 20% of the total design price.

    The last design fee is paid after confirming the complete set of design drawings.

    3. Determine whether there is an additional charge for the late fruit diagram of the effective stupid number.

    In some informal design contracts, there will be additional requirements for renderings, if the owner wants the designer to produce renderings, must be paid for a fee of a few hundred yuan, which is mainly because the cost of the designer with Li is already low, if you send the renderings, the designer's entire cost will be high. In fact, usually when the total price of the design is not bad, the designer will send the owner 1 to 2 renderings of the main area according to the design concept. The owner should negotiate with the designer whether the renderings will be included or paid for at the time of signing the contract, and then sign them.

    4. Clarify the types of design drawings.

    In the contract, it is necessary to indicate the content of the drawings produced by the designer, because some design contracts have vague requirements for drawings. Generally speaking, a complete set of drawings should include original survey drawings, wall reconstruction drawings, floor plans, top layout drawings, electrical construction drawings, water pipe direction drawings, on-site production of furniture size drawings, elevation drawings and section drawings of each contact drawing. If you don't annotate carefully in the contract, it is easy for some designers to have the opportunity to cut corners, and incomplete drawings are likely to affect the construction quality of the home in the future.

    5. Stipulate the time limit for making drawings.

    After the designer surveys the house, he needs to make a preliminary design plan, and after confirming the preliminary design plan, he needs to make the second stage of the design drawings, and finally make a full set of design drawings and a list of main decoration materials. In these three stages, the owner and the designer should negotiate and determine a deadline for submitting drawings, usually the drawings of apartments are about 7 days, and the requirements for large areas of residences such as villas can be appropriately extended. With the deadline requirement, it plays a binding role for the designer, and the owner can better protect his own interests.

  3. Anonymous users2024-02-10

    Decoration is something that many owners will encounter, but many owners do not know the specific process and details of the need to sign the decoration contract, if you know very little, it is very likely to be deceived or conceal some things, and it will be difficult to solve the problem in the later stage, so we must master some necessary knowledge of signing the decoration contract and the matters that need to be paid attention to.

    1. What should be paid attention to when signing a decoration design contract?

    1. Pay attention to the area of design charges.

    The designer's fees are calculated according to the area, and it is necessary to pay attention to the floor area, usable area and floor area of the house here. When signing the design contract, the owners must pay attention to distinguishing between the three areas, so as not to be mistaken, they will spend more wish money.

    2. Pay attention to the payment of design fees.

    In the contract, it must be clear whether the payment is based on the agreed charge or according to the measurement, and the time limit for payment and celebration, as well as whether it is paid in full at once or in installments.

    3. Clarify the types of design drawings.

    In the contract, the content of the drawings produced by the designer should be indicated, and a complete set of drawings should include floor plans, elevations, and original survey drawings. If you don't annotate carefully in the contract, it is easy for some designers to have the opportunity to cut corners, and incomplete drawings are likely to have various disputes in the later stage, which cannot be said clearly, which will affect the mood very much, and may also lead to spending a lot of money without the desired effect.

    4. Stipulate the time limit for making drawings.

    After the designer surveys the house, he will generally have a preliminary prediction, and the designer will determine the time of the drawings, and must strictly implement it, and do not procrastinate, otherwise many follow-up work will be shelved.

    Second, the decoration contract is greasy to pay attention to.

    1. About breach of contract.

    Whether it is the owner's breach of contract or the decoration company's breach of contract, you can use economic means to compensate and protect your legitimate rights and interests. Generally, the liquidated damages are about 1/1000 to 3/1000 of the total amount of the project.

    2. About management expenses.

    Because there are many socks, the owners do not know what the management fee contains, and they are often deceived, such as maintenance fees, elevator use fees, and access card fees. These costs are a headache for renovation companies, so more and more renovation companies require these costs to be paid by the owner and will not be included in the project budget.

    4. About the signature.

    The signature must be carefully confirmed, so as not to deceive and make it impossible to find the responsible person afterwards.

    The above is what to pay attention to when signing a decoration design contract, and the relevant knowledge to pay attention to when the decoration contract is greasy, I hope it will help you. If you'd like to learn more about renovation contracts, stay tuned.

  4. Anonymous users2024-02-09

    For house decoration, in addition to the later construction, the early design is also very important, many owners will specifically ask the designer to design according to their own needs, the decoration designer according to the needs of the owner through careful and scientific conception and planning, to create a creative process that meets people's ideal functional space environment. However, before the decoration design, it is also necessary to sign the decoration design contract, so what should be paid attention to when signing the decoration design contract? Let's take a look.

    1. The design contract shall stipulate the name of the designer designated by the owner, and require the designer to sign the design work.

    2. When signing the design contract, it is necessary to agree on the scope of the project budget after design.

    3. In the contract, it is necessary to agree that the designer will come to measure the time, and the design time will be calculated from the measurement date, so as to prevent the designer from deliberately delaying the design process.

    4. According to the signed design contract, it is necessary to agree on what content is included in the full set of design.

    5. The contract needs to agree that if the owner puts forward major modifications to the design during the design process, the designer requires an increase in the design time and an extension of the construction period.

    6. In the contract, it is necessary to agree on how many days after the measurement to complete the design plan, plane, top surface, main façade and local renderings.

    7. The contract needs to agree on how long to complete the full set of design plans after the preliminary design plan is determined.

    8. The owner has the right to request the replacement of the designer to re-carry out the preliminary scheme design, and if the result is still not satisfied, the right to terminate the contract, part of the design fee collected can not be refunded, and the owner of the design drawings has retained. So think twice when changing designers.

    9. In the contract, it is necessary to agree that the designer has the obligation to explain the construction plan to the construction personnel, and it is agreed that the designer shall go to the site to guide the construction no less than three times.

    10. After the contract needs to agree on a full set of plans, the designer must hand over to the owner a set of design drawings for the rental section, which must have the official seal of the design company.

    11. The contract shall stipulate that the designer shall bear the liability for breach of contract for completing the design drawings on time, and shall bear 3% of the liquidated damages for each day of delay, and terminate the contract and refund the design fee after 15 days. Don't just talk about it, as long as you break the contract, you have to follow the rules.

    12. In the contract, the unit that needs to agree on the accuracy of the design drawing shall be fully responsible, and the design unit shall compensate in full if the loss is caused by the error of the drawing.

    13. A full set of design and construction drawings: original house plan survey drawing, demolition and renovation project plan, floor plan, top layout, elevation layout (flat, vertical, section), strong current distribution map, weak current distribution map, switch and socket map, decoration construction drawing, ground pavement drawing, waterway drawing, cabinet beam and wall facility layout drawing, local perspective drawing, partial tangent drawing, decoration main material budget estimation table, etc.

    About the decoration design contract, what to pay attention to when signing the design contract is introduced here, I hope it will be helpful for you to sign the contract, if you want to know more about home decoration knowledge, please pay attention to the home improvement network.

  5. Anonymous users2024-02-08

    When looking for a decoration company to do design and decoration, in order to protect our rights and interests, we have to sign a contract first. Only in this way can we protect our legal rights, in case we can have a clear division of responsibilities in addition to the aftermath of the renovation process. So how should the renovation contract be signed?

    1. Determination of Fees.

    We will have a variety of costs when decorating, such as design fees, building materials costs, construction costs, etc. When we sign the contract, we have to know what all kinds of projects are, what the specific charging standards are, for example, whether they are charged according to the actual area or the usable area; We all need to know whether the design fee is calculated according to the area or the content, etc.

    2. Content of the Service.

    Design is an indispensable part of decoration, and some people look for a decoration company to decorate when they take a fancy to the function of its design. Therefore, when we sign the contract, we have to specify what aspects should be included in the design. Generally speaking, the designer's services are available from the beginning of the design to the construction to the soft decoration of the furniture, until the owner moves in.

    3. Pay the money and collect the house.

    Generally speaking, the money we give to the renovation company needs to be carried out in batches. The design fee before the start of construction, how much to pay for the rubber cracking when the construction starts, how much to pay after the completion of the project, etc. These are all things that we need to pay attention to.

    It is also important to note that we have to set a time frame in the contract for completion, and if we exceed the time, we will be compensated for our losses.

  6. Anonymous users2024-02-07

    1. Avoid unclear subjects of decoration contracts. In your decoration contract, you must first fill in the name and contact information of Party A and Party B, and you must carefully verify the relevant information of the decoration party to avoid missing information, Zhang Guan Li Dai and other situations.

    2. Remember to supervise when the renovation is carried out. Many people will no longer care after handing over to the decoration party, in fact, this is very bad, if you feel that the decoration is wrong, it is also until the final acceptance of the time to find out, and at that time whether it is the responsibility of the decoration party or not, you will suffer a certain loss. Therefore, you can stipulate in the agreed contract that the project supervision shall be carried out, and the supervision shall be accurate and effective, so as to ensure the quality of the project and avoid the situation that the engineering materials are inferior and good.

    3. Don't write it in order. That is to say, the project budget and a full set of design, construction drawings, and even the first table can be used as an effective component of the decoration contract, so you must make sure that there are written documents, so that you can reduce the disputes that may arise in the later stage of the project.

    4. Clarify the rights and obligations of both parties as much as possible. You should specify in detail in the contract what work Party A and Party B should do to ensure the smooth progress of the project, clarify what kind of behavior is a breach of contract, and what kind of liability for breach of contract needs to be borne. Only by making this clear can you avoid the situation of neglect on the side of the decorator.

    5. Don't forget to add additions and subtractions to the contract. It is necessary to write the additional construction projects into the contract as much as possible, or make detailed relevant provisions to avoid inexplicable additions in the decoration process, resulting in unexplained losses.

    1. Precautions for housing renovation loan contracts.

    1. The contract text needs to be complete. When signing a renovation contract, be sure to read the contract text of the renovation company. Is it complete?

    I would like to know that a complete home improvement contract will include a master contract, a supplementary contract, design drawings (floor plans, elevations), budget sheets, a list of building materials, etc. A supplementary contract means that there is no main contract, but there are some matters that need to be clearly defined and a supplementary contract should be concluded. If the owner does not know the content very well, it is recommended to invite a professional third-party supervisor to supervise the review work.

    2. Clarify the compensation for the construction period. It is necessary to specify in the contract the time of construction and completion, if the construction period is delayed, the amount of compensation will be required if the delay is made. If the terms of the contract are not binding, it is equivalent to giving some construction teams the opportunity to postpone the construction period.

    3. After the owner signs, it can be added to the budget or change the design. A common problem is that the early and late stages require additional budgets at a later stage. If the budget budget is changed in a previous contract or with the owner's "written consent", the owner will***.

    4. Pay on time and leave more tails. Most of the modern decoration companies implement installment payment, each node only after the decoration of the money accepted, but the focus is on the proportion of decoration, if the ratio is very low, some bad construction team will be easy to pick a child because of the trouble. So you can keep a lot of the final payment, so that the decoration is safer.

Related questions
8 answers2024-06-16

Now many post-80s, post-90s due to work, there is not so much time to decorate the new house, generally will find a decoration company to decorate, when we sign a decoration contract with the decoration company, we must pay more attention, many decoration companies will take advantage of the owner does not understand the decoration industry, set traps in the contract. Let's take a look at what matters need to be paid attention to when signing a decoration contract: 1. After the owner approves the first day, the regular decoration company must sign a construction contract or agreement with the owner. >>>More

8 answers2024-06-16

1. Good ventilation. Whether it is red wine or white wine, in fact, it is necessary to ensure a certain ventilation environment, after all, long-term sealing is not for any wine to enhance the effect of wine. And new wines tend to have a certain flavor at first, which is a must. >>>More

18 answers2024-06-16

Now there are many styles to choose from in the decoration of the restaurant, but there are also many taboos in the decoration design of the restaurant. >>>More

6 answers2024-06-16

1. Pay attention to choosing a reasonable house type, and pay attention to whether the lighting is very good and whether the transportation is convenient. Housing prices in urban areas are often very high and difficult for the average person to afford, while houses in the suburbs are too far away and waste a lot of time on the way to and from them. >>>More

7 answers2024-06-16

Be careful when signing a renovation contract.