The house I bought has been capped, so it won t be finished, right?

Updated on society 2024-06-17
14 answers
  1. Anonymous users2024-02-12

    In fact, no matter whether your building is capped or not, it may become an unfinished building.

    All public facilities are a must.

    It has been done, and the owners are already ready to move in, and there is no problem with the property, so it is impossible to become an unfinished building, otherwise just the capping of the real estate is not enough to prove that the real estate will not be unfinished.

    First of all, everyone must understand that there are degrees of unfinished buildings, and there are some off-plan properties.

    Some unfinished buildings may be unfinished after the foundation of the house is laid, and some unfinished buildings are built, but the public facilities are not done, that is to say, the greening, underground garage, etc. promised by the developer at the beginning have not been done.

    In addition, most of them are actually high floors, so the elevator is also a very important part, if the house is built, but the water and electricity are not done, and the elevator is not installed, this is still an unfinished building, and some unfinished buildings do not even have windows, the whole building is completely in a blank state, and there is no way to move in such a house, which is also an unfinished building.

    Therefore, don't look at the house you bought has been capped, it will not become an unfinished building, as long as the community should have something not done, then it may become an unfinished building, so you should pay attention to see if the house you bought is fully equipped, such as the underground garage is done, the waterproof test is done, and the property is not done, if the house is occupied, but the property has not been in place, then it is still not possible to call it a qualified community, after all, there is no property management, Then the safety of the community is a problem.

    Finally, I also hope that everyone will keep their eyes open when buying a house, and if you can buy an existing house, don't think about buying an off-plan house, because the off-plan house may end one day, and now Evergrande and Sunac are thunderstorming.

    Who can guarantee the rest?

  2. Anonymous users2024-02-11

    It will not be unfinished, and the remaining part of the house will not cost much after the house is capped, and if it is unfinished, it will be a big loss for the developer.

  3. Anonymous users2024-02-10

    No, it won't. If such a situation occurs, you can go to the court to solve it, or you can complain directly, and in the end you will get a very good result, and it is impossible to take your money directly.

  4. Anonymous users2024-02-09

    I don't think it's going to end badly under normal circumstances, don't be so pessimistic, and look at the good in everything.

  5. Anonymous users2024-02-08

    After the house is capped, there will still be a bad finish. And want to avoid buyingUnfinished building, you only need to buy a quasi-existing house.

    For most people, they usually choose to spend all their savings to choose to buy a house that they like. But there are many people who may have a bad house after buying a house. As a result, these people will have a particularly anxious feeling in their hearts, and they will also feel a lot of pressure.

    After the house is capped, there will still be a bad finish.

    First of all, many people will think that after the house is capped, it can basically be handed over in a short time. But from a practical point of view, even after the house is capped, there will still be a situation of unfinished. For example, after the house is capped, the developer's funds are relatively short.

    In this case, the handover date of the house will be postponed indefinitely. Therefore, this phenomenon is what we call unfinished buildings. <>

    Purchase of a quasi-existing home.

    Secondly, if you want to avoid buying an unfinished building, you only need to choose to buy a quasi-existing house when you buy a house. Because the quasi-existing house can be delivered at any time. There are even quasi-existing houses, and after the consumer pays the relevant amount, they can get the keys to the house.

    Therefore, choosing to buy a quasi-existing house is a more correct choice. However, you can also choose to buy a second-hand house, and you can also avoid buying an unfinished building by yourself. <>

    Buying a home requires a cautious approach.

    Anyone who is buying a house should keep themselves in a sane mind. In the process of viewing the house, it is necessary to ask the salesperson to show the relevant documents. And it is also necessary to certify relatively large real estate developers, because relatively large real estate companies will have a relatively high reputation.

    And in the process of building a house, the speed of possession is also very fast. After all, most people basically spend all their savings after buying a house.

  6. Anonymous users2024-02-07

    I think that there will still be unfinished houses after the cap, but the probability is relatively small, generally at 5% or 10%; First of all, we must choose a developer, try to choose a developer with relatively high qualifications, and we must find the right time to buy a house, and also pay attention to whether the developer of the real estate has five certificates.

  7. Anonymous users2024-02-06

    Of course it is, because in the case of capping, it is possible that the walls on all four sides have not yet been built. When buying a house, be sure to buy a house that has already been built and has been sold.

  8. Anonymous users2024-02-05

    If the house is capped, the possibility of unfinished is relatively low, and the unfinished house is generally due to the broken capital chain, and there is no money, so there is no unfinished house, so we must choose a large real estate developer.

  9. Anonymous users2024-02-04

    It's going to be unfinished. When buying a house, don't try to be cheap, but look good before buying.

  10. Anonymous users2024-02-03

    Generally, the probability of unfinished houses after the capping is about 5% or 10%.

    Because it is impossible for the developer to end the house after it has been topped out, it will have a huge squeeze on its economy.

    1. The main reason for the unfinished is the lack of capital chain, if you choose some large developers and brand developers, they have strong financial strength.

    2. The so-called near-existing house does not mean that it is already an existing house, but that the delivery time of the real estate is relatively short, generally three months to one year, of course, the shorter the better.

    3. In fact, many real estate projects have some signs or some gossip before they are unfinished, so you can learn more about them before buying a house.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  11. Anonymous users2024-02-02

    In fact, whether it is unfinished or not has nothing to do with the back cover of the house, mainly affected by factors such as the developer's financial ability, house type, location, and project quality. If the developer owes too much debt, or the project advances too much, it is very likely that it will be finished. There is also the fact that the developer's strength is not good, and when it encounters a financial bottleneck, the probability of the house being unfinished is getting bigger and bigger.

    1. What does capping mean?

    Capping means that the main part of the building has been constructed to the highest position according to the pre-designed drawings, and the main part has been completed at this time, and only the roof needs to be sealed; After the building is topped out, it is time to carry out interior and exterior decoration, water and electricity renovation, installation of ventilation facilities and construction.

    Second, what kind of work is there after the building is capped?

    Generally, after the building is capped, the construction of the secondary structure needs to be done.

    1. The distribution of building parts needs to be leveled to make thermal insulation layer, waterproof layer, and waterproof protective layer. Install the droppipe, add details, do waterproof water storage experiments, etc.

    2. The decoration part is also very important, such as the decoration of indoor and outdoor walls, plastering, floor, ceiling, decoration of doors and windows, installation of glass windows, construction of kitchen waterproof facilities and water storage experiments, etc. It is also important to have information on the distribution of drainage and heating.

    3. The information of building electrical should be checked.

    4. Information on building energy conservation and other related experiments, intelligent information, elevator information and construction of outdoor projects, etc.

    5. After that, it is necessary to collect, sort out and archive, and hand over all these materials to the construction unit, and then send them to the urban construction archives, and then carry out acceptance after the construction is completed.

    6. Carry out the decoration project according to the construction plan designed in advance, and then carry out the installation and commissioning of household appliances. After the capping, it is the exterior decoration of the building, the installation of water and electricity, the installation of public areas, and so on.

  12. Anonymous users2024-02-01

    Unfinished and connected real estate can be bought. It is also possible to buy the real estate after the unfinished and the listing, and the house itself can be bought without problems. But it's better to buy what has already been built.

    Some of them are unfinished buildings.

    During the revitalization, some project shares may be chaotic, and if it has not been built, there may be a risk of stopping work again. In addition, due to the delay in the completion of the house, the property rights of these houses are generally much less after the revitalization, although the impact is not great, but it is inevitable that there are still people who care.

    How to deal with buying an unfinished building:

    1. Find out the ownership of the house.

    Due to the different ways of buying a house, it can be divided into two situations: buying a house with a mortgage loan and buying a house with installments to the seller, which will have different effects on the ownership of the house. Therefore, buyers should first seek professional legal advice to find out their ownership.

    Because the property status of unfinished buildings is particularly important to buyers.

    In the case of a mortgage, it is recommended to consult a professional lawyer to find out the mortgage period and how to release the mortgage. In addition, if the property has not been completed at the time of the declaration of bankruptcy, it will result in a situation where the developer will not be able to meet its responsibilities to the buyer; If the house has been completed after the developer goes bankrupt, the buyer can apply to the housing management department for the real estate certificate and real estate certificate in accordance with the procedures.

    2. Class Action Lawsuits.

    Initiation is to be united.

    If it is necessary to find out the ownership of the property and decide to sue the developer, the home buyer should work together with the many home buyers to avoid a situation where some people receive compensation and some do not. As the saying goes, everyone gathers firewood and the flame is high, and the owners speak with one voice and work hard in one direction, and the momentum and formation alone attract more attention than a single business.

    Moreover, in the process of rights protection, it is necessary to hire a professional lawyer, because whether it is to negotiate with the developer or coordinate assets with **, banks, construction parties, etc., real estate lawyers need rich experience in handling cases to maximize rights protection.

    3. Reduce your own losses as much as possible.

    Generally speaking, every property has a complex debt relationship, and the developer owes not only the owner's house, but also the bank loan.

    The construction party's project payment.

    Buyers should not easily check out, just imagine, if the developer is unable to continue to recommend the project, it is very likely that there is no money to repay the owner, and at this time to quit the house, the owner and the developer will become a debt relationship, according to the relevant regulations, the institution (bank) with the right to mortgage the real estate has the priority to repay, and ordinary consumers do not have the priority to be repaid.

  13. Anonymous users2024-01-31

    After the capping, the quality of the real estate that is not finished, and is later taken over and renovated, will generally not have problems. A renovation is a design change issued by a qualified design unit.

    There is no problem with the program. The lower layers have less impact on the quality. Unfinished building

    It refers to a real estate project that has gone through land use and planning procedures, but after the project starts, the developer is unable to continue to invest in construction or falls into debt disputes, and the construction is suspended for more than one year. There are many reasons for the formation of unfinished buildings, such as the bankruptcy of the developer of the real estate under construction, the lack of construction funds, the project involves economic disputes, and the developer's violation of laws and regulations leads to the suspension of the project, most of which are due to the rupture of the capital chain, the project is not completed, the developer has no money, the bank is unwilling to continue the loan, and the project cannot be transferred to other investors.

    Civil Code of the People's Republic of China.

    Article 799:After the completion of a construction project, the employer shall carry out the acceptance in a timely manner in accordance with the construction drawings and specifications, the construction acceptance specifications and quality inspection standards issued by the state. If the acceptance is qualified, the employer shall pay the price in accordance with the agreement and accept the construction project.

    The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

    Article 800 If the quality of the survey or design does not meet the requirements or the survey or design documents are not submitted within the time limit and the construction period is delayed, causing losses to the employer, the surveyor or designer shall continue to improve the survey and design, reduce or waive the survey and design fees, and compensate for the losses.

    Article 801:Where the quality of the construction project does not conform to the agreement due to the reasons of the constructor, the employer has the right to request the constructor to repair, rework, or reconstruct the project free of charge within a reasonable period of time. After repair, rework or reconstruction, if the delivery is overdue, the constructor shall bear the liability for breach of contract.

    Article 13 of the Interim Measures for the Investigation of Lifetime Responsibility for the Quality of the Project Leader of the Five Parties Responsible for Construction Projects shall be held accountable in the following ways:

    1) If the project manager is a relevant registered practitioner, it shall be ordered to stop practicing for 1 year; Causing major quality accidents.

    , the practice qualification certificate shall be revoked.

    Not registered within 5 years; where the circumstances are particularly heinous, they will not be registered for life;

    2) where a crime is constituted, transfer it to the judicial organs for investigation of criminal responsibility in accordance with law;

    3) Give a fine of between 5% and 10% of the amount of the unit's fine;

    4) Publish to the public**.

  14. Anonymous users2024-01-30

    Maybe 30, the later stage is greening, fire protection, as long as the real estate developer does not mess around, it will be fine, there should be no problem, otherwise the capital chain will be broken, or it will be deceived and lead to unfinished, generally not, especially large developers.

Related questions
10 answers2024-06-17

The housing signed online in the name of the party is counted as the real estate in the name of the party, and the number of housing units is calculated on a family basis. Online signing can effectively prevent the situation of multiple sales of one house, maintain the stable order of Beijing's second-hand housing market, and make real estate transactions more transparent. >>>More

7 answers2024-06-17

New and second-hand homes have their own advantages and disadvantages, and understanding your needs is the most important. Generally, new houses have advantages in terms of down payment ratio, taxes, loan terms, house types, etc., and second-hand houses are lower, the school district is stable, and the occupancy is faster. If the price of a second-hand house in the city is upside down, give priority to buying a new house, and if you are in a hurry to move in or your children go to school, then buy a second-hand house.

10 answers2024-06-17

1. To find out the ownership of the house, you must go through legal legal consultation to determine your own property ownership. Buyers should go to the administrative department for industry and commerce to check whether the commercial housing development enterprise has published it in accordance with legal procedures; If it has been legally published, the buyer can go to the housing management department to request the processing of the real estate certificate with the certificate of legal publication of the developer issued by the industrial and commercial department, as well as the original commercial housing sales contract, personal ID card and other materials. 2. If the purchased real estate is only "unfinished", you can try to give the developer a little time, if it can raise funds in a short period of time and complete the follow-up project, the loss of the buyer can be minimized. >>>More

8 answers2024-06-17

Start by drawing up a contract. Such as heating bills, water and electricity bills, property fees, etc., are stated in the contract which one pays, when to move, when to vacate the house, the time should be clear, and the party responsible for the transfer fee is all indicated. When handling the transfer, bring your ID card, real estate certificate, and land use certificate. >>>More

37 answers2024-06-17

It's not that bigger is better... First of all, it depends on whether you have sufficient funds, and secondly, it depends on how many people you add... If you add a family of 3, and the funds are sufficient, it is recommended that you buy about 120 square meters, not too big, not too small... It's too big, and you'll feel like the whole house is empty, and when it's small, it's depressing. So 120 square meters is just right... This is my personal opinion... The most important thing is to see what you like... It doesn't matter if it's bigger if you like it...