First we need to lay the foundation, then dig a huge pit, then build them with bricks, and finally connect the sewage that needs to be discharged.
-
The sewage sink well can be laid with bricks close to the ground, and the bricks can be glued into a circle with mortar.
-
First we need to lay a foundation, then dig a huge pit, then build them with bricks, and finally connect the sewage that needs to be discharged.
-
Summary. How to build a sewage well when there is water all around: 1. The foundation at the bottom of the well should be poured at the same time as the pipeline foundation.
2. When building the well chamber, after washing the foundation with water, first lay a layer of mortar, and then press the bricks to build the masonry, it must be fully paved and squeezed, and the ash joints between the bricks and bricks keep the drainage pipeline The flow groove in the inspection well should be masonry at the same time as the well wall, when the stone masonry is used, the surface should be compacted and wiped with mortar layers, the flow groove should be connected with the upstream and downstream pipelines, and the elevation of the inner bottom of the pipe should meet the requirements of the process quality standards. 4. When the brick circular inspection well is built, the diameter size should be detected at any time, and when it is necessary to close, if it is closed on all sides, it should not be greater than 30mm each time; If it is retracted on three sides, each retraction should not be greater than 50mm; The inner wall of the masonry inspection well should be made of raw slurry joints, and when there are requirements for plastering, the inner wall plastering surface should be compacted in layers, and the outer wall should be compacted with mortar rubbing joints. 5. The stepping of the masonry inspection well should be with the masonry, the position is accurate, and the stepping shall not be stepped on before the masonry mortar or the specified compressive strength is not reached after the installation of the step.
6. The reserved pipe of the masonry inspection well should be safed with the masonry, the diameter, direction and elevation of the reserved pipe should meet the design requirements, the connection between the pipe and the well wall should be tight and not leaking, and the reserved branch nozzle should be smoothed with low-strength mortar masonry sealing.
How to build a sewage well when there is water all around: 1. The foundation at the bottom of the well should be poured at the same time as the pipeline foundation. 2. When building the well chamber, after washing the foundation with water, first lay a layer of mortar, and then press the bricks to build the masonry, it must be fully paved and squeezed, and the ash joints between the bricks and bricks keep the drainage pipeline The flow groove in the inspection well should be masonry at the same time as the well wall, when the stone masonry is used, the surface should be compacted and wiped with mortar layers, the flow groove should be connected with the upstream and downstream pipelines, and the elevation of the inner bottom of the pipe should meet the requirements of the process quality standards.
4. When the brick circular inspection well is built, the diameter size should be detected at any time, and when it is necessary to close, if it is closed on all sides, it should not be greater than 30mm each time; If it is retracted on three sides, the sedan chair should not be greater than 50mm each time; The inner wall of the masonry inspection well should be made of raw slurry joints, and when there are requirements for plastering, the inner wall plastering surface should be compacted in layers, and the outer wall should be compacted with mortar rubbing joints. 5. The stepping of the masonry inspection well should be with the masonry, the position is accurate, and the stepping shall not be stepped on before the masonry mortar or the specified compressive strength is not reached after the installation of the step. 6. The reserved pipe of the masonry inspection well should be safed with the masonry, the diameter, direction and elevation of the reserved pipe should meet the design requirements, the joint between the pipe and the well wall should be tight and not leaking, and the reserved branch nozzle should be smoothed with low-strength mortar masonry sealing.
How to solve the problem with water.
Sewage sluice shafts can be constructed with concrete pouring. Build a circular brick well on the foundation, the diameter of the well is usually 1250mm, the upper part is shrunk to 700mm manhole cover seat, and the surrounding area is fixed with concrete. The inner wall of the well is generally 20mm thick, and the inlet and outlet pipes pass through the well wall to fill with mortar to prevent seepage.
When there is groundwater, the outside of the well also needs to be smeared with cement mortar to bring the plum surface to 250mm above the groundwater level, and the bottom of the well is paved with gravel and then poured concrete foundation. Generally, it is required that the sewage sluice well itself cannot seep water, and its sealing must be ensured, and the connection method must be reliable, and the water cannot seep into the well chamber because of heavy rain or stagnant water.
-
Hello, dear, I am happy to answer for you: how to do the bottom of the pure water well dust in the household dirt hand Answer: dear, hello, method:
1. The bottom of the well foundation should be poured at the same time as the pipeline foundation. 2. When building the well chamber, after flushing the foundation with water, first lay a layer of mortar, and then press the bricks to build it, it must be full of squeezing, the ash joints between the bricks and the bricks keep the drainage pipeline inspection well The launder should be built with the wall of the well at the same time, when the stone masonry is used, the surface should be compacted and wiped with mortar layers, the launder should be connected with the upstream and downstream pipelines, and the elevation of the inner bottom of the pipe should meet the requirements of the process quality standards. 4. When the brick circular inspection well is built, the diameter size should be detected at any time, and when it is necessary to close, if it is closed on all sides, it should not be greater than 30mm each time; If it is retracted on three sides, each retraction should not be greater than 50mm; The inner wall of the masonry inspection well should be made of original slurry joints, when there are plastering requirements, the inner wall plastering surface should be compacted in layers, and the outer wall should be compacted with mortar and should be compacted Thank you for your patience.
The above is my full reply, if you are satisfied with my service, please give a thumbs up, and I wish you all the best! Peace and joy! <>
-
What kind of sewage wells are you going to make.
-
Use some hypochlorous acid reagent (i.e. bleach) to disinfect, towels can be boiled in boiling water, hypochlorous acid is very orange bush easy to buy. Now the water quality of the well is relatively poor, it is light yellow in winter, and it will be boiled even after boiling, and it is next to the farmland, and now it is simple and practical to use half a tank of sand for simple filtration. According to the buried distribution of groundwater lithological structure of the aquifer.
Humans have created a wide variety of well types.
The Chinese Peichong folk have long been accustomed to using circular tube wells. The diameter is mostly 1 2 meters, and the depth is generally several meters to 20 30 meters. Such wells are only suitable for the extraction of shallow groundwater.
Generally speaking, there are many ways to make holes in the wellbore and install saddle joints. If the elevation of the outlet pipe is too low, you can also use the confluence plate. >>>More
Raw materials: 1. Cement: used to build the brick perimeter on the outside of the kang. >>>More
In the countryside, when applying mortar to the sand-stone wall, there are several steps to make it firm: >>>More
In other words, it is important to drill wells according to the time and how deep the wells should be drilled, not by your subjective intention. Many people don't understand the direction of the groundwater system, and it is likely that they will think that it will be all water below how long it is. In fact, the underground water system is complex, and like the rivers on our ground, it is also divided into separate regions and regions. >>>More
People living in cities or towns have been accustomed to the convenience of water and electricity, because there is tap water to the home, so we no longer need to use wells to maintain the water for life as before, and in some remote rural areas, we will still dig a deep well, when cooking or laundry, draw water from the well for use, so today we will talk about the deep water wells that operate drinking water in rural areas when drilling wells, how deep is it better, and whether it can be replaced every few years. >>>More