  1. Anonymous users2024-02-11

    The order of decoration of the bathroom is very particular.

    Steps on the correct decoration of the bathroom. The first thing we need to be concerned about is the size and scheme design related to hydropower. To install a water heater, install a hair dryer plug, etc., and also take into account some electrical appliances that may be purchased in the future, all of which need to be bolted. <>

    In addition, when we install the latch, consider whether the water will splash into the latch during the shower, which is very dangerous. The second is to do a good job of waterproof treatment of the bathroom, because the bathroom often uses water, if the waterproof performance is not good, the ground is very little damp, then the underground water, it is likely to cause the whole room to seep into the water, and it is very troublesome to deal with it later. The tiles of the bathroom are not only beautiful, the most important thing is waterproof, and those bolts must also be bought with waterproof covers.

    If you put tiles, you must pay attention to the mouth of the running water, and do not be too flat, because the water will not flow well to the drain if it is too flat. Therefore, if you are pasting the underground tiles, you must ask the master to let him paste them a little more inclination, so that the toilet will always be dry. If the lamp on the bathroom is made of suspended ceiling, it must also be waterproof, if it is not a waterproof material, the longer it may become very soft and collapse, and it may also be moldy and smelly.

    I recommend choosing aluminum-plastic panels or aluminum gusset plates, these two kinds of boards are not only very convenient to install, but also the price is more appropriate, that is, it is a little easy to deform, but as long as we do not touch it often, there is generally nothing to do. <>

    Secondly, it is necessary to pay attention to the location of the toilet and shower installed in the bathroom. For example, if someone is taking a shower, but the other person suddenly wants to go to the toilet, what should I do? And there is only one bathroom in the house.

    So the advice is to separate the toilet from the shower, or to enclose the shower with a frosted glass-like ring. If there is enough space in the bathroom, then it is best to have a dry and wet partition for the bathroom. The wet area is the toilet and shower, and the dry area is where towels, toothbrushes, toothpaste, and facial cleanser are placed.

    If the bathroom is relatively small, then you must pay attention to waterproofing and decorate according to the actual situation.

  2. Anonymous users2024-02-10

    There is nothing wrong with it, the most important thing in the decoration of the bathroom is waterproofing, it is necessary to do waterproofing first, and then install tiles, the water must be unblocked, and the washbasin is the last to do.

  3. Anonymous users2024-02-09

    I didn't do anything wrong, I did a careful strategy before decorating the bathroom, and I renovated according to the experience of others, so basically there were not too many mistakes.

  4. Anonymous users2024-02-08

    Generally, the bathroom should be waterproofed first, then pasted with floor tiles, then suspended ceilings, then made on the countertop, and finally installed with toilets.

  5. Anonymous users2024-02-07

    When decorating the bathroom, you need to figure out the specific processes and steps. What is the order of bathroom decoration? Let's take a look.

    1. After the renovation of the water and electricity is completed, it is necessary to do the waterproof project of the bathroom and do a good job of testing the waterproof effect.

    2. After the completion of the waterproofing project, the masons enter the site to pave the tiles. It should be noted that when laying wall tiles, the width of the ceiling should be reserved.

    3. Next, install the ceiling. As for which of the ceiling and the water heater should be installed first, this is particular. If the ceiling is installed first, then the water heater should be reserved for a good place; However, if the water heater is installed first, it will affect the installation of the keel ceiling by the workers, and the second is that the water heater of the dismantler does not consider the location, which will block the installation of the ceiling.

    4. After the ceiling installation is completed, install various lamps and lanterns.

    5. Installation of bathware and bathroom cabinets, including toilets, sinks, faucets and shower rooms, etc.

    6. The next step is to install the water heater. According to the position reserved when installing the ceiling, install the water heater under the ceiling.

    7. Finally, the installation of various hardware. The reason why the hardware is installed at the end is to avoid accidentally breaking the hardware during the previous construction process.

  6. Anonymous users2024-02-06

    Bathroom decoration is extremely important, and many details must be paid attention to. The general steps are as follows: Overall scheme design.

    According to the size of the toilet, the functional partition is scientifically arranged. Sanitary ware, sanitary ware placement. Clarify the water and electricity decoration parts.

    The total area is sufficient, and it is best to do dry and wet partitions. Plumbing and water renovation. Before assembling, check whether the drainage pipe fittings are good and whether the initial moisture resistance is not damaged.

    The assembly should be carried out by a professional construction team to ensure that the water supply and drainage pipes and potential difference are effective. It should be noted that the drainage pipe must be made of secondary coil odor-proof floor drainage, and the water supply and drainage must be tested in a hydraulic test to ensure that there is no leakage after installation, and the cable paving cannot be on the bathroom floor. Bathrooms do waterproofing.

    Moisture-proof is essential, and waterproof coatings should be better as much as possible. The waterproof project must be rigorous and timely, and it must also be watered after it is done to ensure that it is adaptable. Make empty racks or backfills.

    Empty racks and backfills are chosen by themselves. There is no need to destroy the water supply and drainage pipe fittings during construction, and the ground is waterproof. Floor tile parquet.

    It is enough to supervise the construction technology. There is no need to destroy hydropower projects and prevent moisture. Decoration of suspended ceilings.

    Generally, the integrated gusset is chosen. Mid-to-late stage assembly. Install all the necessary sanitary ware, sanitary ware, lighting fixtures, etc.

  7. Anonymous users2024-02-05

    When decorating the bathroom, we must first do a good job of waterproofing, and then change the water and electricity, and then pave the floor tiles and wall tiles in the bathroom decoration, the most important thing is the waterproof project, which must be in place.

  8. Anonymous users2024-02-04

    The order of bathroom decoration is to install basins, toilets, bathtubs, and finally install hardware accessories, it should be noted that the practicability of the bathroom should be considered before decoration, and the location of the installation should be determined first.

  9. Anonymous users2024-02-03

    The best installation order of the bathroom: first install water and electricity, do waterproof treatment, pave floor tiles, stick wall tiles, ceilings, install baths, pay attention to, waterproof treatment, exhaust installation, and the ground should have a slope to facilitate leakage and drainage.

  10. Anonymous users2024-02-02

    Pipe closure to sound insulation: there are some complex pipelines such as sewer pipes in the bathroom, among which the main sewer pipeline is connected to all the outlets of the bathroom, and the sound of "whooshing" sewer will affect life and sleep. Therefore, when wrapping the riser, it is necessary to carry out sound insulation and noise reduction treatment on the riser, use sound insulation materials such as rubber and plastic boards to package the pipeline in multiple layers, and then use light steel keel or light bricks to surround the riser to make the pipeline achieve good noise reduction and moisture-proof effect.

  11. Anonymous users2024-02-01

    Most people will be able to fabric home decoration problems, and kitchen and bathroom decoration is a problem that must be paid enough attention to, after all, kitchen partitions and bathrooms are used more frequently. So for kitchen and bathroom decoration, what is its order? What should I pay attention to?

    Let's learn together!

    Kitchen renovation process

    For the decoration of the kitchen, it is not too complicated, but it must be carried out in accordance with the process, first of all, it is to change the wiring of the wires, and reasonably set up the socket according to the placement of household appliances; The second is the waterproofing of the kitchen, and then the laying of tiles, of course, for the kitchen, the oil smoke is relatively large, and all the walls are best paved with ceramic tiles. Then there is the ceiling work, and finally the customization of the whole cabinet and the furniture needed for the kitchen.

    Bathroom renovation process

    For the decoration of the bathroom, it is still more important in the kitchen and bathroom decoration knowledge, its process and the process of kitchen decoration are not bad, first of all, the water and electricity lines should be adjusted, and then the ground is waterproof, it should be noted that the waterproofing of the bathroom not only includes the ground, the wall is best to carry out waterproof treatment. Then it's the tiling, and finally it's the installation of the bathroom. The location of the bathroom must be reasonably planned.

    Things to look out for:

    In the kitchen and bathroom decoration knowledge, there are several problems that need to be paid attention to, one is that the waterproofing of the kitchen and bathroom must be done, and it must be done carefully to prevent underwater seepage or penetration into the side of the room; The second problem is that it is best to choose tiles for kitchen and bathroom wall treatment, so as to ensure that the wall is clean and tidy. The third problem is that the ceiling is best made of aluminum-plastic panels, which is easy to clean.

    The above is about the process of kitchen and bathroom decoration and a few things to pay attention to, when decorating, it is necessary to carry out the preliminary design, and then choose the most suitable plan, so as to create the ideal kitchen and bathroom.

  12. Anonymous users2024-01-31

    There are many precautions for the construction of the bathroom, after all, it belongs to the commonly used functional area, and it can reduce a lot of trouble for the later stage when paying attention to it during the early decoration. When it comes to the construction of the bathroom, I have to say that the order is really very important! Let's follow Brother Qi to find out.

    1. Hydropower transformation.

    Hydropower renovation is the first step of bathroom decoration, because the water consumption of the bathroom is relatively large, and even the laundry room can be combined with the bathroom if space allows, so the hydropower renovation can be said to be the top priority. When doing hydropower transformation, we must first reserve the socket position, so as to facilitate the installation of bathroom equipment in the later stage.

    2. Waterproof. I don't think much about how important is the waterproofing work, after all, this is one of the conditions that can determine the quality of life from the basics, once the waterproofing is not done, it will not only affect your own quality of life, but also affect the neighbor's house, so the waterproofing and protective layer of the ground must be remembered to do a good job, the waterproofing of the wall can not be ignored, and remember to do a closed water test after the waterproofing is done!

    3. Tile paving.

    Tile paving is generally carried out after the waterproofing is done, so as to avoid the appearance of tile arching and expansion caused by water seepage on the ground, and the same is true for the ceiling. What we need to pay attention to is that we must choose materials with good waterproof and wear resistance, and then select and adjust them according to the overall style.

    4. Sanitary ware installation.

    Wait until the above three steps are over, the decoration of the bathroom is basically completed, and then you can carry out the installation of other facilities, including sanitary ware, the installation of custom cabinets, etc., some people will feel that the installation of these furniture and electrical appliances should be in front of the tile paving, otherwise it will cause tile damage, in fact, there is no need to worry at all, to trust the craftsmanship of professionals!

    If you want to live more comfortably after moving in, you need to pay attention to all the details of the home, especially the functional areas such as kitchens and bathrooms, because of the high frequency of use, it is necessary to pay more attention.

  13. Anonymous users2024-01-30

    Hello, the bathroom is generally decorated in the following order:

    1. Functional positioning of space planning;

    2. Hydropower construction;

    3. Pipeline masonry and plastering;

    4. Waterproof construction and closed water test;

    5. Wall tile pasting;

    6. Floor tile paving;

    7. Brick joint filling or beauty seam;

    8. Integrated ceiling installation (or waterproof gypsum board ceiling);

    9. The built-in water heater should be installed in front of the ceiling;

    10. Installation of lamps and bath bombs;

    11. Installation of sanitary ware and hardware pendants;

  14. Anonymous users2024-01-29

    Decorating a house is a very complex project, so let's take a look at the order of decorating a house.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  15. Anonymous users2024-01-28

    Lay the ground pipes and wall pipes, and then level the ground, start to do waterproofing, first do wall waterproofing, then do ground waterproofing, and then carry out waterproofing experiments, 24 hours later, start laying wall tiles, floor tiles, and then wait for the tiles to step on, that is, when your family carpenters start to do the ceiling of the bathroom, and then press the water heater, the hand basin, the toilet, the floor drain, and other things, and some hardware, bath bombs, and so on.

Related questions
5 answers2024-06-10

RV decoration whole bathroom is a good choice.

The whole toilet includes a lot, and the bathroom, toilet and toilet are all made independent to maximize the function in the limited space. In its material selection is a little higher, the material is not only thermal insulation, but also anti-aging, but also has a beautiful effect, so the overall bathroom will be higher than the traditional one. The overall bathroom is determined by hardware, sanitary ware, lighting and water and electricity systems, and cost-effective products can not only ensure quality, but also shorten the decoration time, which brings convenience to us. >>>More

10 answers2024-06-10

I don't know how long and wide your bathroom is? I can only give you a rough calculation: 1 >>>More

4 answers2024-06-10

What should I do if there are no windows in the bathroom of the building? When the bathroom of some buildings is set up, in order to save space, it will choose not to open the window, and the bathroom is not designed to reach the window, which will cause the indoor air to not be able to escape. Therefore, most of the bathrooms in buildings will open the windows directly on the ceiling, and turn on an exhaust fan directly on the ceiling. >>>More

23 answers2024-06-10

The most important thing in bathroom decoration is to prevent water leakage. Bathroom decoration is a key object of home decoration, and many people don't know what to pay attention to in toilet decoration. There are many precautions for bathroom decoration, and these are all things that everyone needs to pay attention to when decorating the toilet. >>>More

17 answers2024-06-10

Bathroom waterproofing should be done well.

In addition to the basic waterproof work, the bathroom leakage is mainly the junction between the ground and the wall, which should be dealt with urgently, leaving no dead ends, and the waterproofing of the wall is best to be 180mm, which can not only eliminate water leakage, but also prevent water from wetting the wall. >>>More