How to write the contract for the maintenance of the contracted mixing plant?

Updated on society 2024-06-15
2 answers
  1. Anonymous users2024-02-12

    Batching plant contract: Party A: Party B:

    In order to ensure the normal progress of concrete production and transportation, both parties A and B negotiate and reach a contract based on the principles of mutual benefit, fairness and justice. 1. Scope of Contracting 1Replacement and repair of the tires of Party A's 31 mixer trucks (excluding the vehicles borrowed by Party A, except for Party A's directives, the cost is determined separately).

    2.Replacement and repair of the tires of Party A's 1 emergency repair vehicle. 3.

    Replacement and repair of the tires of Party A's 3 forklifts. II. Responsibilities of the Parties 1Party A shall pay Party B the tire labor contract fee on the day of each month.

    2.Party A provides a certain working site, and rents an air compressor, a tire vulcanizing machine, a tube tire repair machine, an electric tire removal machine, and a jack for Party B to use. 3.

    Party B is responsible for the maintenance and repair of the above-mentioned machinery and equipment, and Party A bears the maintenance costs. 4.The maintenance costs of the abnormal damage of the above-mentioned machinery and equipment shall be borne by Party B.

    5.Party B shall have no less than 3 tire workers, and 24-hour service shall be implemented to ensure the repair and replacement of vehicle tires. 6.

    Party B's personnel shall strictly abide by Party A's safety management system, and Party B shall bear all responsibilities and economic losses if Party B has a safety accident. 7.Party B's personnel shall strictly abide by Party A's rules and regulations and management requirements, obey Party A's management, and accept Party A's monthly work assessment and evaluation (assessment standards are determined separately).

    8.The driver of Party A shall actively cooperate with Party B's staff when disassembling and changing tires. When Party A's driver enters the mixing table to load, he must check whether the tires are in good condition, so as to ensure that the tires are replaced when the empty vehicle is empty.

    If a heavy vehicle replaces a tire, the driver must work with the tyre worker to change the tire. III. Liability for Breach of Contract 1From the date of contracting, except for force majeure reasons, neither party shall breach the contract in the middle of the contract, and in case of breach of contract, the responsible party shall compensate the other party for an average contract fee of one month.

    2.If Party A's vehicle enters the workshop to change tires for more than 1 hour, Party B's contracting fee of 50 yuan will be deducted; If it exceeds 2 hours, Party B's contracting fee of 100 yuan will be deducted; If it occurs more than three times, Party A has the right to terminate the contract (except for the situation that the tire worker goes out for emergency repair). 3.

    Party B shall, in accordance with Party A's civilized production requirements, do a good job of clearing its own work and living places. If the inspection is unqualified, Party A shall issue a rectification notice to order rectification, and Party B's contracting fee of 100 yuan will be deducted; If there are two or more similar situations in the current month, Party B's contracting fee of 200 yuan will be deducted. 4.

    If Party B fails to confirm the scrapped tires in accordance with the regulations, and the tire scrapping responsibility cannot be determined, Party B shall bear the compensation costs for the scrapped tires. 5.For matters not covered in this contract, supplementary provisions shall be made by both parties through mutual consultation, and the supplementary contract shall have the same legal effect as this contract.

    4. Contract Duration This contract is valid from XX/XX to XX/XX/YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY Party A (Chapter): Attn:

    Party B (Chapter): Attn: Date of Signing:

  2. Anonymous users2024-02-11

    The contract is a contract in which the contractor completes the work and delivers the work results according to the requirements of the contractor, and the contractor pays remuneration. Specifically, it includes: processing, customization, repair, copying, testing, inspection and other work.

    A contract refers to a contract in which the contractor carries out the construction and the employer pays the price, including engineering survey, design and construction, which shows that the content of the work to be completed is different. A general contract should be in written form, while a contract does not have such a formal condition, that is to say, the contract can be in both written and oral form.

    If the contractor entrusts the main work contracted by the contractor to a third party to complete, it shall be responsible to the contractor for the work results completed by the third party, and the contractor shall complete the contract by itself.

    According to Article 264 of the Contract Law, if the contractor fails to pay remuneration or material fees to the undertaker, the contractor has a lien on the completed work product.

    Article 286 of the Contract Law stipulates that if the contractor fails to urge the employer to pay the price within a reasonable period of time, the contractor may apply to the people's court to auction the project in accordance with the law and receive priority for the payment of the price, that is, the law does not give the contractor the right of retention in the contract. The contractor in the contract has the right to terminate the contract at any time, and if the contractor suffers losses, it shall be compensated.

    Due to the complexity and rigor of the performance of a contract, generally speaking, the employer cannot change the contractor at will. The court of first instance jurisdiction over civil litigation under a contract is generally the basic court at the place where the processing is conducted, while the court with jurisdiction over a contract of first instance is generally the court where the defendant is located.

Related questions
12 answers2024-06-15

There are certain specifications for concrete batching plants. >>>More

14 answers2024-06-15

Stirring function (1) Place the rubber sealing ring on the edge of the blade device; (2) Rotate the blade device in the direction of the arrow and connect it to the mixing cup; (3) Put the mixing cup on the motor device, rotate it in the direction of the arrow, and make it secure; (4) Put the ingredients into the mixing cup (the temperature of the ingredients should be lower than 80) 5) Press the lid into the correct position; (6) Put the plug into the lid and add the ingredients to the mouth, rotate it until it is firmly installed, in order to avoid spillage, the plug should be inserted into the lid before starting to stir; (7) Insert the power plug into the socket; (8) Select the desired speed setting and start stirring; (9) To stop stirring, turn the switch to position 0, and do not turn the blender on or off by turning the blending cup. Want to know....

11 answers2024-06-15

A set of mobile mixing plants will vary according to the model and configuration, generally ranging from hundreds of thousands to seven or eight hundred thousand, and the specific equipment will be subject to the manufacturer, because the quality of the equipment produced by different manufacturers is different, and the production process is different, so the sales will naturally be different.

7 answers2024-06-15

The 120 type concrete batching plant is a medium and large concrete batching plant, which is made of the main engine of the twin-shaft mixer and the combined batching machine, and the PLD-3200 batching machine is flexible, the storage hopper volume is 20m3*3-5, and the number of bones of the batching machine is 3-5 kinds. Aggregate feeding is carried out by belt conveyor and continuous conveyor. The main engine of HZS120 batching plant uses JS2000 compulsory mixer. >>>More

10 answers2024-06-15

The mix ratio is calculated according to the strength grade. >>>More