A model Cooperative Car Purchase Agreement is urgently needed

Updated on society 2024-06-16
2 answers
  1. Anonymous users2024-02-12

    There are many examples of how to look up online.

  2. Anonymous users2024-02-11

    Party A: Party B:

    ID Number: ID Number:

    After mutual negotiation between Party A and Party B, Party A voluntarily sells to Party B, frame number.

    License plate number:

    Party A and Party B must strictly comply with the following clauses.

    1. Party A must ensure that the procedures of the car are true and correct, including the driving license, surcharge and file, and ensure that the car is not an illegal vehicle (stolen, renumbered, fake license plate and other vehicles) If there is an illegal vehicle belonging to the above phenomenon, Party A will unconditionally refund Party B's purchase price for the whole continental bend and compensate for all economic losses caused to Party B. All violations that exist before the date of purchase shall be handled by Party A.

    Second, the price of the car is capitalized (lowercase: yuan). The car is paid in a lump sum when the contract is signed.

    3. After Party B purchases the car, if all traffic accidents and mechanical accidents, or other losses or liabilities related to the car occur, Party B shall bear all the consequences and legal responsibilities, and Party A shall not be responsible. The car transfer costs are all responsible for the party, and Party A actively cooperates.

    Fourth, from the date of signing the contract, the vehicle to test and see the car as the standard, if one party breaches the contract according to 30% of the compensation to the other party.

    5. The unfinished matters shall be resolved by both parties through consultation, and if they cannot be resolved, they shall be resolved by the legal department.

    6. This agreement shall be executed in duplicate, one copy for each party A and B, and shall come into force after signing.

    Party A: (Signature): Party B: (Signature):

    YYYYYYYYYYYYYYYYY

    Legal basis: Civil Code of the People's Republic of China

    Article 584 If one of the parties fails to perform its contractual obligations or the performance of its contractual obligations does not conform to the agreement, causing losses to the other party, the amount of compensation for the losses shall be equivalent to the losses caused by the breach of contract, including the benefits that can be obtained after the performance of the contract; provided, however, that it shall not exceed the losses that may be caused by the breach of contract that the breaching party foresaw or should have foreseen at the time of entering into the contract.

    Civil Code of the People's Republic of China

    Article 596: The contents of a sales contract generally include the name, quantity, quality, price, time limit, place and method of performance, packaging method, inspection standards and methods, settlement method, words used in the contract and its effect, etc.

    Civil Code of the People's Republic of China

    Article 607: After the seller delivers the subject matter to the place designated by the buyer and delivers it to the carrier in accordance with the agreement, the risk of damage or loss of the subject matter shall be borne by the buyer.

    If the parties have not agreed on the place of delivery or the agreement is not clear, and the subject matter needs to be transported in accordance with the provisions of Article 603, Paragraph 2, Item 1 of this Law, the risk of damage or loss of the subject matter shall be borne by the buyer after the seller delivers the subject matter to the first carrier.

Related questions
5 answers2024-06-16

Don't give a cent, you still want a cooperation agreement, what do you think, less than 10,000 funds, it doesn't matter, more than 10,000 please consider it carefully. >>>More

4 answers2024-06-16

Hello! Will this contract work?

Huangshan one-day travel activities safety exemption agreement >>>More

11 answers2024-06-16

This thing should be self-created and affectionate.

11 answers2024-06-16

The construction organization design should first calculate the engineering quantity, consider the construction plan, select the construction machinery and tools, and determine the approximate number of people according to the engineering quantity. Then draw the construction schedule and adjust it continuously until the conditions of reasonable construction period and minimum cost are met. Finally, after the failure of the preparation is determined, the calculation of the material use plan, the personnel and staff species entry plan, and the safety tremor measures are broken.

7 answers2024-06-16

Start with a cycle every week. To put it simply, do 6 days with one day of rest, because muscles are growing at rest. >>>More